CONTENTS

Volume 1- Main Report

 

1             INTRODUCTION.. 1-1

1.1       Project Background. 1-1

1.2       Project Scope. 1-2

1.3       Site Location and History. 1-2

1.4       EIA Study Brief 1-4

1.5       Designated Projects. 1-4

1.6       Purpose of the EIA Report 1-4

1.7       Objectives of the EIA Study. 1-5

1.8       Structure of the EIA Report 1-6

 

2             PROJECT DESCRIPTION.. 2-1

2.1       Purposes and Objectives of the Project 2-1

2.2       Need of the Project 2-1

2.3       Benefits of the Project 2-2

2.4       “Without Project” Scenario. 2-3

2.5       Alternative Options of the Project 2-4

2.6       Description of the Preferred Option. 2-19

2.7       Construction Methods and Engineering Requirements. 2-23

2.8       Works Programme. 2-28

2.9       Concurrent Projects. 2-29

2.10     Public Concern. 2-31

 

3             AIR QUALITY. 3-1

3.1       Introduction. 3-1

3.2       Relevant Legislation and Guidelines. 3-2

3.3       Existing Environment 3-4

3.4       Identification of Air Sensitive Receivers. 3-9

3.5       Construction Dust Impact Assessment 3-13

3.6       Operational Air Quality Impact Assessment 3-31

3.7       Environmental Monitoring and Audit 3-40

3.8       Conclusions. 3-40

 

4          Noise. 4-1

4.1       Introduction. 4-1

4.2       Background. 4-1

4.3       Identification of Noise Sensitive Receivers. 4-2

4.4       Environmental Legislation, Standards and Guidelines. 4-4

4.5       Construction Noise Impact Assessment 4-8

4.6       Operational Noise Impact Assessment 4-15

4.7       Concurrent Projects. 4-19

4.8       Environmental Monitoring and Audit 4-21

4.9       Conclusions. 4-21

 

5             WATER QUALITY. 5-1

5.1       Introduction. 5-1

5.2       Relevant Legislation and Guidelines. 5-1

5.3       Baseline Conditions. 5-4

5.4       Assessment Criteria. 5-12

5.5       Assessment Methodology. 5-22

5.6       Potential Sources of Impact 5-22

5.7       Impact Assessment - Construction Phase. 5-23

5.8       Impact Assessment - Operational Phase. 5-30

5.9       Mitigation Measures. 5-67

5.10     Cumulative Impacts. 5-69

5.11     Residual Impacts. 5-72

5.12     Environmental Monitoring and Audit 5-73

5.13     Conclusion. 5-73

 

6             WASTE MANAGEMENT. 6-1

6.1       Introduction. 6-1

6.2       Environmental Legislation, Standards and Guidelines. 6-1

6.3       Assessment Methodology. 6-5

6.4       Identification and Evaluation of Waste Management Implications. 6-7

6.5       Mitigation Measures. 6-22

6.6       Residual Impacts. 6-30

6.7       Environmental Monitoring and Audit 6-30

6.8       Conclusions. 6-31

 

7             ECOLOGY. 7-1

7.1       Introduction. 7-1

7.2       Legislative Requirements and Evaluation Criteria. 7-1

7.3       Baseline Conditions. 7-2

7.4       Assessment Methodology. 7-45

7.5       Potential Impacts and Impact Assessment (Terrestrial Ecology) 7-45

7.6       Potential Impacts and Impact Assessment (Marine Ecology) 7-48

7.7       Impact Evaluation. 7-57

7.8       Cumulative Impacts. 7-65

7.9       Mitigation Measures. 7-66

7.10     Residual Impacts. 7-69

7.11     Environmental Monitoring and Audit 7-69

7.12     Conclusion. 7-69

 

8          FISHERIES. 8-1

8.1       Introduction. 8-1

8.2       Legislative Requirements and Evaluation Criteria. 8-1

8.3       Baseline Conditions. 8-1

8.4       Assessment Methodology. 8-7

8.5       Impact Identification. 8-7

8.6       Impact Assessment - Construction Phase. 8-8

8.7       Impact Assessment - Operation Phase. 8-9

8.8       Impact Evaluation. 8-13

8.9       Cumulative Impact 8-17

8.10     Mitigation Measures. 8-18

8.11     Residual Impacts. 8-19

8.12     Environmental Monitoring and Audit (EM&A) 8-19

8.13     Conclusion. 8-19

 

9             CULTURAL HERITAGE. 9-1

9.1       Introduction. 9-1

9.2       Legislative Requirements and Evaluation Criteria. 9-1

9.3       Assessment Methodology. 9-2

9.4       Marine Archaeological Review and Marine Archaeological Potential Establishment 9-6

9.5       Cultural Heritage Impact Assessment 9-13

9.6       Mitigation Measures. 9-14

9.7       Residual and Cumulative Impacts. 9-14

9.8       Environmental Monitoring & Audit (EM&A) 9-15

9.9       Conclusions. 9-15

9.10     Bibliography. 9-16

 

10           LANDSCAPE AND VISUAL. 10-1

10.1     Introduction. 10-1

10.2     Relevant Legislation, Standards, Guidelines, and Other References. 10-2

10.3     Review of Relevant Planning and Development Control Framework. 10-4

10.4     Scope and Content of the LVIA Study. 10-4

10.5     Landscape and Visual Impact Assessment Methodology. 10-5

10.6     Baseline Study. 10-13

10.7     Landscape Impact Assessment 10-34

10.8     Visual Impact Assessment before Mitigation. 10-43

10.9     Landscape and Visual Mitigation Measures. 10-56

10.10   Residual Landscape Impacts. 10-59

10.11   Residual Visual Impacts. 10-65

10.12   Cumulative Impact 10-70

10.13   Environmental Monitoring and Audit 10-78

10.14   Conclusion. 10-78

 

 

11           ENVIRONMENTAL MONITORING AND AUDITING (EM&A) REQUIREMENT. 11-1

11.1     Introduction. 11-1

11.2     Project Organisation. 11-1

11.3     EM&A Manual 11-1

11.4     Environmental Mitigation Implementation Schedule. 11-2

11.5     EM&A Programme. 11-2

12        SUMMARY OF ENVIRONMENTAL OUTCOMES. 12-1

12.1     Introduction. 12-1

12.2     Summary of Environmental Benefits and Environmental Achievements of the
Project 12-1

12.3     Environmental Benefits of Environmental Protection Measures Recommended. 12-2

12.4     Estimated Population Protected from Various Environmental Impacts. 12-10

 

13           CONCLUSION.. 13-1

13.1     General 13-1

13.2     Air Quality. 13-1

13.3     Noise. 13-2

13.4     Water Quality. 13-3

13.5     Waste Management 13-4

13.6     Ecology. 13-5

13.7     Fisheries. 13-6

13.8     Cultural Heritage. 13-7

13.9     Landscape and Visual 13-7

13.10   Overall Conclusion. 13-8