CONTENTS
Volume 1- Main Report
1.1 Project
Background
1.2 Project
Scope
1.3 Site
Location and History
1.4 EIA
Study Brief
1.5 Designated
Projects
1.6 Purpose
of the EIA Report
1.7 Objectives
of the EIA Study
1.8 Structure
of the EIA Report
2.1 Purposes
and Objectives of the Project
2.2 Need
of the Project
2.3 Benefits
of the Project
2.4 “Without
Project” Scenario
2.5 Alternative
Options of the Project
2.6 Description
of the Preferred Option
2.7 Construction
Methods and Engineering Requirements
2.8 Works
Programme
2.9 Concurrent
Projects
2.10 Public
Concern
3.1 Introduction
3.2 Relevant
Legislation and Guidelines
3.3 Existing
Environment
3.4 Identification
of Air Sensitive Receivers
3.5 Construction
Dust Impact Assessment
3.6 Operational
Air Quality Impact Assessment
3.7 Environmental
Monitoring and Audit
3.8 Conclusions
4.1 Introduction
4.2 Background
4.3 Identification
of Noise Sensitive Receivers
4.4 Environmental
Legislation, Standards and Guidelines
4.5 Construction
Noise Impact Assessment
4.6 Operational
Noise Impact Assessment
4.7 Concurrent
Projects
4.8 Environmental
Monitoring and Audit
4.9 Conclusions
5.1 Introduction
5.2 Relevant
Legislation and Guidelines
5.3 Baseline
Conditions
5.4 Assessment
Criteria
5.5 Assessment
Methodology
5.6 Potential
Sources of Impact
5.7 Impact
Assessment - Construction Phase
5.8 Impact
Assessment - Operational Phase
5.9 Mitigation
Measures
5.10 Cumulative
Impacts
5.11 Residual
Impacts
5.12 Environmental
Monitoring and Audit
5.13 Conclusion
6.1 Introduction
6.2 Environmental
Legislation, Standards and Guidelines
6.3 Assessment
Methodology
6.4 Identification
and Evaluation of Waste Management Implications
6.5 Mitigation
Measures
6.6 Residual
Impacts
6.7 Environmental
Monitoring and Audit
6.8 Conclusions
7.1 Introduction
7.2 Legislative
Requirements and Evaluation Criteria
7.3 Baseline
Conditions
7.4 Assessment
Methodology
7.5 Potential
Impacts and Impact Assessment (Terrestrial Ecology)
7.6 Potential
Impacts and Impact Assessment (Marine Ecology)
7.7 Impact
Evaluation
7.8 Cumulative
Impacts
7.9 Mitigation
Measures
7.10 Residual
Impacts
7.11 Environmental
Monitoring and Audit
7.12 Conclusion
8.1 Introduction
8.2 Legislative
Requirements and Evaluation Criteria
8.3 Baseline
Conditions
8.4 Assessment
Methodology
8.5 Impact
Identification
8.6 Impact
Assessment - Construction Phase
8.7 Impact
Assessment - Operation Phase
8.8 Impact
Evaluation
8.9 Cumulative
Impact
8.10 Mitigation
Measures
8.11 Residual
Impacts
8.12 Environmental
Monitoring and Audit (EM&A)
8.13 Conclusion
9.1 Introduction
9.2 Legislative
Requirements and Evaluation Criteria
9.3 Assessment
Methodology
9.4 Marine
Archaeological Review and Marine Archaeological Potential Establishment
9.5 Cultural
Heritage Impact Assessment
9.6 Mitigation
Measures
9.7 Residual
and Cumulative Impacts
9.8 Environmental
Monitoring & Audit (EM&A)
9.9 Conclusions
9.10 Bibliography
10.1 Introduction
10.2 Relevant
Legislation, Standards, Guidelines, and Other References. 10-2
10.3 Review
of Relevant Planning and Development Control Framework. 10-4
10.4 Scope
and Content of the LVIA Study
10.5 Landscape
and Visual Impact Assessment Methodology
10.6 Baseline
Study
10.7 Landscape
Impact Assessment
10.8 Visual
Impact Assessment before Mitigation
10.9 Landscape
and Visual Mitigation Measures
10.10 Residual
Landscape Impacts
10.11 Residual
Visual Impacts
10.12 Cumulative
Impact
10.13 Environmental
Monitoring and Audit
10.14 Conclusion
11 ENVIRONMENTAL
MONITORING AND AUDITING (EM&A) REQUIREMENT
11.1 Introduction
11.2 Project
Organisation
11.3 EM&A
Manual
11.4 Environmental
Mitigation Implementation Schedule
11.5 EM&A
Programme
12 SUMMARY
OF ENVIRONMENTAL OUTCOMES
12.1 Introduction
12.2 Summary
of Environmental Benefits and Environmental Achievements of the
Project
12.3 Environmental
Benefits of Environmental Protection Measures Recommended
12.4 Estimated
Population Protected from Various Environmental Impacts. 12-10
13.1 General
13.2 Air
Quality
13.3 Noise
13.4 Water
Quality
13.5 Waste
Management
13.6 Ecology
13.7 Fisheries
13.8 Cultural
Heritage
13.9 Landscape
and Visual
13.10 Overall
Conclusion