TABLE OF CONTENT

 

                                                                                                                                                                 

 

1                    INTRODUCTION                                                                                                                     

Project Background

Objectives of the EIA Study

The Approach

Report Structure

 

2                    DESCRIPTION OF THE PROJECT                                                                                        

Introduction

PPFS Road Alignment

Alternative Road Alignment

Preliminary Design of Road Alignment

Proposed Road Alignment from Ka Loon Tsuen to Tai Lam Kok

Proposed Roundabout Layout at Tai Lam Kok

Proposed Viaduct from Tai Lam Kok to Siu Lam

Proposed Roundabout at Siu Lam Interchange

Environmental Considerations of PPFS and Proposed Alignments

The EIA Study Area

Construction Activities

Traffic Forcasts

Concurrent Projects

 

3                    AIR QUALITY IMPACT                                                                                                           

Introduction

Environmental Legislation, Policies, Plans, Standards, Guidelines and Criteria

Description of the Environment

Air Sensitive Receivers (ASRs)

Assessment Methodologies

Environmental Impact Identification, Prediction and Evaluation

Mitigation of Adverse Environmental Impacts

Evaluation of Residual Impacts

Environmental Monitoring and Audit

Conclusion

 

4                    NOISE IMPACT                                                                                                                        

Introduction

Environmental Legislation, Standards and Guidelines     

Description of the Environment

Noise Sensitive Receivers

Assessment Methodology

Identification of Impacts

Prediction and Evaluation of Impacts

Mitigation of Adverse Environmental Impacts

Evaluation of Residual Environmental Impacts

Construction Activities during Restricted Hours

Environmental Monitoring and Audit

Conclusion

 

5                    WATER QUALITY IMPACT                                                                                                   

Introduction

Environmental Legislation, Standards and Guidelines     

Description of the Environment

Assessment Methodology

Identification of Impacts

Prediction and Evaluation of Impacts

Mitigation of Adverse Environmental Impacts

Evaluation of Residual Environmental Impacts

Environmental Monitoring and Audit

Conclusion

 

6                    WASTE MANAGEMENT IMPLICATIONS                                                                          

Introduction

Environmental Legislation, Standards and Guidelines     

Assessment Methodology

Baseline Conditions

Identification of Impacts

Prediction and Evaluation of Environmental Impacts

Mitigation of Adverse Environmental Impacts

Imported Fill

Summary of Wastes Generated and Imported Fill

Residual Environmental Impacts

Environmental Monitoring and Audit

Conclusion

 

7                    TERRESTRIAL AND MARINE ECOLOGY                                                                          

Introduction

Environmental Legislation, Standards and Guidelines

Terrestrial Ecology

Marine Ecology

 

8                    FISHERIES                                                                                                                                

Introduction

Legislation and Guidelines    

Description of the Environment

Fisheries Resource Importance

Assessment Methodology

Identification of Impacts

Impact Evaluation

Mitigation of Adverse Environmental Impacts

Environmental Monitoring and Audit

Conclusion

 

9                    LANDSCAPE AND VISUAL IMPACTS                                                                                  

Preamble

Objectives of the LVIA

LVIA Methodology

Project Description

Baseline Study of Landscape and Visual Resources

Review of Planning and Development Control Framework

Assessment of Landscape and Visual Impacts

Recommended Landscape Mitigation Measures

Residual Impacts and Acceptability of Development

Conclusion

 

10                ENVIRONMENTAL MONITORING AND AUDIT                                                              

Introduction

Air Quality Impact

Noise Impact

Water Quality Impact

Waste Management Implications

Ecological Impact

Fisheries Impact

Landscape & Visual Impact

 

11        CONCLUSIONS AND RECOMMENDATIONS                                                                   

Introduction

Air Quality Impact

Noise Impact

Water Quality Impact

Waste Management Implications

Ecological Impact

Fisheries Impact

Landscape and Visual Impact

Overall Conclusion

 

12        IMPLEMENTATION SCHEUDLE OF RECOMMENDED MITIGATION                        

            MEASURES

 

 

List of Tables

Table 2.1           Main Difference between the Alignments

Table 3.1           Hong Kong Air Quality Objectives

Table 3.2           Tunnel Air Quality Criteria

Table 3.3           Air Pollutant Levels Recorded at EPD’s Air Quality Monitoring Station (Tsuen Wan)

Table 3.4           Description of the Air Sensitive Receivers

Table 3.5           Dust Emission Factors used for Castle Peak Road New Link  Assessment

Table 3.6           A Comparison of Combined Effects of Traffic Flow and Emission Factors on Castle Peak Road New Link

Table 3.7           Predicted Cumulative TSP Concentrations at the Representative ASRs at 1.5m above Ground (Unmitigated)

Table 3.8           Predicted Cumulative TSP Concentrations at the Representative ASRs at 10m above Ground (Unmitigated)

Table 3.9           Predicted 1-hour Average NO2 Concentrations at the Representative ASRs at various levels above ground

Table 3.10         Predicted 24-hour average NO2 Concentrations at the Representative ASRs at various levels above ground

Table 3.11         Predicted 24-hour Average RSP Concentrations at the Representative ASRs at various levels above ground

Table 3.12         Predicted NO2 Concentration inside the full enclosures

Table 3.13         Predicted TSP Concentrations at the Representative ASRs at 1.5 m above Ground (Mitigated)

Table 3.14         Predicted TSP Concentrations at the Representative ASRs at 10m above Ground  (Mitigated)

Table 4.1           Construction Noise Criteria for Activity other than Percussive Piling

Table 4.2           Acceptable Noise Levels for Percussive Piling

Table 4.3           Permitted Hours of Operation for Percussive Piling

Table 4.4           Summary of Representative Noise Sensitive Receivers for Construction Noise Impact Assessment

Table 4.5           Summary of Representative Noise Sensitive Receivers for Traffic Noise Impact Assessment

Table 4.6           Potential Traffic Noise Impacts

Table 4.7           Duration of Exceedance of Noise Criterion for School during Examination Period

Table 4.8           Summary of Maximum Cumulative Construction Noise Levels at the Representative NSRs

Table 4.9           Effectiveness of Recommended Mitigation Measures

Table 4.10         Construction Noise Levels at Represntative NSRs During Restricted Hours (Unmitigated)

Table 4.11         Construction Noise Levels at Representative NSRs During Restricted Hours (Mitigated)

Table 5.1           Water Quality Objectives Statement for North Western WCZ

Table 5.2           Summary Statistics of Marine Water Quality at NM1 and NM2 for 1998

Table 5.3           Ambient and Allowable Elevation in Suspended Sediment Concentrations (mgL-1)

Table 5.4           Predicted Elevation in Suspended Sediment Concentrations (Non-cumulative and Unmitigated Scenario)

Table 5.5           Maximum Predicted Cumulative Elevations in Suspended Sediment Concentration at Ma Wan Fish Culture Zone (Unmitigated Scenario)

Table 5.6           Marine Site Investigation Sediment Elutriate Test Results

Table 5.7           Calculation of the Effects of Increased Suspended Sediment Concentrations on Total Inorganic Nitrogen Concentrations

Table 5.8           Calculation of the Effects of Increased Suspended Sediment Concentrations on Unionised Ammoniacal Nitrogen Concentrations 

Table 5.9           Predicted Elevation in Suspended Sediment Concentrations (Non-cumulative and Mitigated Scenario)

Table 6.1           Sediment Criteria under the New Classification System    

Table 6.2           Sediment Quality Analysis Results from Marine Ground Investigation Works

Table 6.3           Results of Testing of TBT in Interstitial Water

Table 6.4           Summary of Wastes Generated

Table 6.5           Summary of Imported Fill

Table 7.1           Evaluation of Floral Species with Ecological Interest within Study Area

Table 7.2           Summary of Compensatory Woodland and Amenity Planting

Table 8.1           Production by Fishing Area (all fishing vessels)

Table 8.2           Top Ten Adult Fish Caught by Fishing Area

Table 8.3           Top Ten Adult Fish Caught by Homeport (Ma Wan/Tsing Lung Tau/Yam O)

Table 8.4           Average Price of Fresh Marine Fish sold at Wholesale Fish Market in Hong Kong (March 2000)

Table 9.1           Sensitive Visual Receivers

Table 9.2           Summary of Visual Impacts

Table 9.3           Summary of Landscape Loss and Compensation

Table 9.4           Summary of Landscape Impacts and Recommended Mitigation Measures

Table 9.5           Summary of Visual Impacts and Recommended  Mitigation Measures

Table 12.1         Implementation Schedule for Dust Control

Table 12.2         Implementation Schedule for Noise Control

Table 12.3         Implementation Schedule for Water Quality Control

Table 12.4         Implementation Schedule for Waste Management Implications

Table 12.5         Implementation Schedule for Ecology

Table 12.6         Implementation Schedule for Landscape and Visual

 

 

List of Figures

 

Figure 2.1         Location of the Subject Site

Figure 3.1         Locations of Representative Air Sensitive Receivers

Figure 3.2         Contours of 1-Hour Average Nitrogen Dioxide Concentrations in µg/m3 at 1.5m above Ground

Figure 3.3         Contours of 1-Hour Average Nitrogen Dioxide Concentrations in µg/m3 at 10m above Ground

Figure 3.4         Contours of 24-hour Average Nitrogen Dioxide Concentrations in µg/m3 at 1.5m above Ground

Figure 3.5         Contours of 24-hour Average Nitrogen Dioxide Concentrations in µg/m3 at 10m above Ground

Figure 3.6         Contours of 24-hour Average Respirable Suspended Particulate Concentrations in µg/m3 at 1.5m above Ground

Figure 3.7         Contours of 24-hour Average Respirable Suspended Particulate Concentrations in µg/m3 at 10m above Ground

Figure 3.8         Contours of 1-Hour Average Total Suspended Particulate Concentrations in µg/m3 at 1.5m above Ground (Mitigated)

Figure 3.9         Contours of 24-Hour Average Total Suspended Particulate Concentrations in µg/m3 at 1.5m above Ground (Mitigated)

Figure 4.1         Locations of Representative Noise Sensitive Receivers during Construction Phase and Proposed Construction Sequence

Figure 4.2         Locations of Representative Noise Sensitive Receivers during Operation Phase

Figure 4.3         Locations of Proposed Noise Mitigation Measures (Mitigation 1)

Figure 4.4         Locations of Noise Barriers for Alternative Roundabout No. 1B at Siu Lam Interchange

Figure 4.5         Locations of Proposed Noise Mitigation Measures (Mitigation 2)

Figure 5.1         Locations of Monitoring Station NM1, NM2 and WM4

Figure 6.1         Sediment Sampling Locations

Figure 7.1         Field Sampling Points of Freshwater Habitats

Figure 7.2a       Terrestrial Habitat Map and Study Boundary

Figure 7.2b       Terrestrial Habitat Map and Study Boundary

Figure 7.3         Locations of Potential Breeding Area

Figure 7.4         Marine Habitat Map and Field Sampling Locations

Figure 8.1         Fisheries Key Areas

Figure 9.1A      Landscape and Visual Impact Study Area 

Figure 9.1B      Cross Sections of Proposed Road 

Figure 9.2A      Landscape Character Areas-Photographic Viewpoints Locations

Figure 9.2B      Landscape Character Areas-Photographic Record 

Figure 9.2C      Landscape Character Areas-Photographic Record 

Figure 9.3         Viewshed and Sensitive Visual Receivers 

Figure 9.4         Planning and Development Control Framework in Study Area 

Figure 9.5         Landscape Impacts 

Figure 9.6A      Photomontages-From Ma Wan Channel 

Figure 9.6B      Photomontages-From Siu Lam Overbridge 

Figure 9.6C      Photomontages-From Brothers Point 

Figure 9.6D      Photomontages-From Siu Lam Police Quarters 

Figure 9.6E      Photomontages-From Poseidon Coast Residences

Figure 9.7         Landscape Mitigation Measures: Typical Cross Section of Road and Seawall

Figure 9.8A      Landscape Proposal (Sheet 1 of 5) 

Figure 9.8B      Landscape Proposal (Sheet 2 of 5) 

Figure 9.8C      Landscape Proposal (Sheet 3 of 5) 

Figure 9.8D      Landscape Proposal (Sheet 4 of 5) 

Figure 9.8E      Landscape Proposal (Sheet 5 of 5) 

 

 

Appendices

 

Appendix 2.1           PPFS Road Layout

Appendix 2.2           Project Constraints

Appendix 2.3           Key Issues and Constraints

Appendix 2.4           General Layout

Appendix 2.5           General Layout

Appendix 2.6           General Layout

Appendix 2.7           General Layout

Appendix 2.8           General Layout

Appendix 2.9         General Layout

Appendix 2.10       General Layout

Appendix 2.11        General Layout

Appendix 2.12       Typical Cross – Section of Proposed Road

Appendix 2.13       Alternative Roundabout Layout at Tai Lam Kok

Appendix 2.14       Precast/Cast – In – Situ Segmental Box Girder Bridge – Cross - Section

Appendix 2.15       Alternative Roundabout Layout No. 1A at Siu Lam Interchange

Appendix 2.16       Alternative Roundabout Layout No. 1B at Siu Lam Interchange

Appendix 2.17       Alternative Roundabout Layout No. 2 at Siu Lam Interchange

Appendix 2.18       Alternative Roundabout Layout No. 3 at Siu Lam Interchange

Appendix 2.19       Preliminary Construction Programme

Appendix 2.20       Projected 2003 Peak Hour Traffic Flows

Appendix 2.21       Projected 2022 Peak Hour Traffic Flows

Appendix 3.1         Calculations of Dust Emission Factors

Appendix 3.2         Sample Computer Output of FDM Calculations

Appendix 3.3         Calculations of Road Traffic Emission Factors

Appendix 3.4         Sample Computer Outputs of CALINE4 Calculations

Appendix 3.5         Calculations of Emission Factor and Mass of Pollutants in Year 2002

                              (Open Roads near Portal Exits)

Appendix 3.6         Sample Computer Output of ISCST3 Calculations

Appendix 3.7(a&b)Detailed Calculation of In-tunnel Air Quality

Appendix 3.8         Sample Computer Output of CALINE4 and ISCST3 Calculation for the Assessment Points near the Full Enclosures

Appendix 4.1         Defined ‘New’ Roads and ‘Existing’ Roads

Appendix 4.2         Prevailing Road Traffic Noise Levels for 2003

Appendix 4.3a        Powered Mechanical Equipment for Construction Activities

Appendix 4.3b       Sound Power Level of Powered Mechanical Equipment for Various Construction Activities (Unmitigated)

Appendix 4.3c        Sound Power Level of Powered Mechanical Equipment for Various Construction Activities (With the Use of Quiet Equipment)

Appendix 4.3d       Sound Power Level of Powered Mechanical Equipment for Various Construction Activities (With the Use of Quiet Equipment and Moveable Barrier)

Appendix 4.3e        Sound Power Level of Powered Mechanical Equipment for Various Construction Activities (With the Use of Quiet Equipment, Moveable Barrier and Restriction on Usage of Operating PME)

Appendix 4.4         Sample Calculation for Construction Noise

Appendix 4.5         Sample Output File for Traffic Noise Model Calculation

Appendix 4.6a        Construction Noise Assessment Result - Unmitigated

Appendix 4.6b       Construction Noise Assessment Result –With the Adoption of Quiet Equipment

Appendix 4.6c        Construction Noise Assessment Result –With the Adoption of Quiet Equipment and Movable Barrier

Appendix 4.6d       Construction Noise Assessment Result –With the Adoption of Quiet Equipment, Movable Barrier and Restriction on the Usage of Operating Plant

Appendix 4.7a        Traffic Noise Assessment Results

Appendix 4.7b       Predicted Traffic Noise Levels for Alternative Layout (Mitigated)

Appendix 4.7c        Assessment of Noise Sensitive Receivers Eligible for Indirect Technical Remendies

Appendix 4.8         Traffic Forecast for 2011 (Without Route 10 NLYLH’s Siu Lam Link Road)

Appendix 7.1         Field Survey Schedule

Appendix 7.2         Species Recorded in the Field Survey

Appendix 7.3         Species Lists in the Marine Ecology Field Survey

Appendix 7.4         Representative Photographs of Flora with Conservation Interest

Appendix 7.5         Representative Photographs of Coastal Habitats