Development of Tseung Kwan O Area 137 and Associated Reclamation Sites –

Investigation Design and Construction

Table of Content

 

List of Appendices

Appendix 2.1

Tentative Preliminary Development Schedule

Appendix 2.2

Tentative Construction Programme

Appendix 2.3

Site Phasing Plan

Appendix 2.4

Proposed Construction Traffic Routing

Appendix 3.1

Calculation of Vehicular Emissions

Appendix 3.2

Calculation of Start Emissions

Appendix 3.3

Calculation of Emissions from CHP and Boiler

Appendix 3.4

Calculation of TKO132 CBP, PFTF, CWHF

Appendix 3.5

Calculation of Marine Emissions

Appendix 3.6

Calculation of Existing Industrial Chimney Emissions

Appendix 3.7

Determination of Surface Characteristics

Appendix 3.8

Calculation of Portal Emissions

Appendix 3.9

Derivation of Cumulative Annual Average NOX-to-NO2 Conversion Equation using Jenkin Method

Appendix 3.10

Calculation of Odour Emissions

Appendix 3.11

Detailed Prediction Results (Operation Phase)

Appendix 3.12

Detailed Prediction Results (Odour, Operation Phase)

Appendix 3.13

Construction Phasing Plan

Appendix 4.1

Prevailing Background Noise Measurement Data

Appendix 4.2

Photographic Records of the Existing Representative Noise Sensitive Receivers

Appendix 4.3

Tentative Construction Programme

Appendix 4.4

Tentative Construction Plant Inventory

Appendix 4.5

Marine Traffic Data with endorsement letter from Marine Department

Appendix 4.6

Road Traffic Forecast Data

Appendix 4.7

Endorsement of the Traffic Forecast Data from Transport Department

Appendix 4.8

Computation Plot of Road Traffic Noise Model

Appendix 4.9

Fixed Plant Inventory

Appendix 4.10

Predicted Road Traffic Noise Level at TKO 132

Appendix 4.11

Predicted Road Traffic Noise Level at TKO 137

Appendix 4.12

Marine Traffic Noise Impact Assessment

Appendix 5.1

Indicative Reclamation Sequences at TKO 137

Appendix 5.2

Indicative Reclamation Sequences at TKO 132

Appendix 5.3

Typical Arrangement of Submerged Outfall

Appendix 5.4

Refined Model Grid Layout, Properties and Performance Verifications

Appendix 5.5

Refined Model Spin-up Test Results

Appendix 5.6

Modelling Scenarios for Construction Phase

Appendix 5.7

Locations of Cross Sections

Appendix 5.8

Non-point Source Surface Runoff

Appendix 5.9

Typical Pier Arrangement

Appendix 5.10a

Construction Phase Model Results at WSRs – Unmitigated Scenarios

Appendix 5.10b

Construction Phase Contour Plots for SS Elevation and Sedimentation – Unmitigated Scenarios

Appendix 5.10c

Construction Phase Model Results at WSRs – Mitigated Scenarios

Appendix 5.10d

Construction Phase Contour Plots for SS Elevation and Sedimentation – Mitigated Scenarios

Appendix 5.10e

Sediment Quality Results for Nutrients and Sediment Oxygen Demand at TKO 137

Appendix 5.10f

Sediment Quality Results for Nutrients and Sediment Oxygen Demand at TKO 132

 

 

 

 

 

 

 

 

 

 

Appendix 5.10g

Elutriate Test Results for TKO 137

Appendix 5.10h

Elutriate Test Results for TKO 132

Appendix 5.10i

Construction Phase Nutrient and Contaminant Concentrations at WSRs

Appendix 5.10j

Indicative Arrangement of Double Floating Type Silt Curtains

Appendix 5.11a

Operation Phase Flow Vectors and Contour Plots for Flow Speeds

Appendix 5.11b

Operation Phase Timeseries Plots for Momentary and Accumulated Flow and Relative Changes of Flow Rates and Flow Speeds

Appendix 5.11c

Operation Phase Water Quality Model Results at WSRs

Appendix 5.11d

Operation Phase Water Quality Contour Plots 

Appendix 5.11e

Emergency Discharge Timing

Appendix 5.11f

Operation Phase Water Quality Timeseries Plots - Dissolved Oxygen

Appendix 5.11g

Operation Phase Water Quality Timeseries Plots - Total Inorganic Nitrogen

Appendix 5.11h

Operation Phase Water Quality Timeseries Plots - Suspended Solids

Appendix 5.11i

Operation Phase Water Quality Timeseries Plots and Table of Maximum Levels - E. coli

Appendix 5.11j

Operation Phase Water Quality Timeseries Plots - Unionized Ammonia

Appendix 5.11k

Operation Phase Water Quality Timeseries Plots - Salinity

Appendix 6.1

Process Flow Diagram of Sewage Treatment for TKO 137 Effluent Polishing Plant

Appendix 6.2

Process Flow Diagram of Sludge Treatment for TKO 137 Effluent Polishing Plant

Appendix 6.3

Proposed Sewerage Alignment at TKO 132 & TKO 137

Appendix 7.1

Sediment Sampling and Testing Plan (SSTP)

Appendix 7.2

Summary of Chemical Screening Results and Disposal Options

Appendix 7.3

Laboratory Analytical Report (Chemical Screening)

Appendix 7.4

Details of Sediment Quantity Estimation

Appendix 8.1

Reviewed Historical Aerial Photographs

Appendix 8.2

Available Ground Investigation Records

Appendix 8.3

Acquisition of Information from Government Departments

Appendix 8.4

Photographic Records of Site Walkover

Appendix 8.5

Site Walkover Checklists

Appendix 8.6

Risk-Based Remediation Goals (RBRGs) for Soil and Soil Saturation Limit and for Groundwater and Solubility Limit

Appendix 8.7

Typical Design of a Groundwater Monitoring Well

Appendix 9A

Relevant Experience of Key Ecological Surveyors

Appendix 9.1

Representative Photographs of Habitat Types and Species of Conservation Importance within the Assessment Area

Appendix 9.2

Flora Species Recorded within the Assessment Area

Appendix 9.3

Fauna Species Recorded within the Assessment Area

Appendix 9.4

Findings of Rapid Ecological Assessment for Coral Communities

Appendix 9.5

Intertidal Species Recorded at Sampling Locations in the Assessment Area in the Qualitative Survey

Appendix 9.6

Intertidal Species Recorded at Sampling Locations in the Assessment Area in the Quantitative Survey

Appendix 9.7

Abundance and Biomass of Benthic Species Recorded at Sampling Locations in the Assessment Area

Appendix 10A

Relevant Experience of Key Surveyors of Fisheries Surveys

Appendix 10.1

Adult Fish Survey Data

Appendix 10.2

Commercial Value of Fisheries Species

Appendix 10.3

Full List of Vessel Data

Appendix 11.1

Broad-brush tree survey and plans

Appendix 12.1

Built Heritage and Other Identified Item Recording Sheet

Appendix 12.2

Site Visits Photo Record

Appendix 12.3

Research References

Appendix 12.4

Marine Archaeology Investigation Report

Appendix 13.1

Hazard to Life Assessment for a Planned Desalination Plant

Appendix 13.2

Hazard to Life Assessment for an Existing Synthetic Natural Gas (SNG) Production Plant

Appendix 13.3

Hazard to Life Assessment for a Proposed Effluent Polishing Plant

Appendix 13.4

Hazard to Life Assessment for a Proposed Green Fuel Station (GFS)

Appendix 14.1

SENT and SENTX Landfill Gas Monitoring Location and Monitoring Data

Appendix 14.2

Summary of SENT and SENTX Landfill Gas Monitoring Data

Appendix 18.1

Key Assessment Assumptions and Limitations of Assessment Methodologies

Appendix 18.2

Summary of Environmental Impacts

Appendix 18.3

Details of Schedule 2 Designated Projects for Environmental Permit Application