Development of Tseung Kwan O Area 137 and
Associated Reclamation Sites –
Investigation Design and Construction
Table of
Content
List of Appendices |
|
|
|
Tentative Preliminary Development Schedule |
|
Tentative Construction Programme |
|
Site Phasing Plan |
|
Proposed Construction Traffic Routing |
|
Calculation of Vehicular Emissions |
|
Calculation of Start Emissions |
|
Calculation of Emissions from CHP and
Boiler |
|
Calculation of TKO132 CBP, PFTF, CWHF |
|
Calculation of Marine Emissions |
|
Calculation of Existing Industrial Chimney
Emissions |
|
Determination of Surface Characteristics |
|
Calculation of Portal Emissions |
|
Derivation of Cumulative Annual Average NOX-to-NO2
Conversion Equation using Jenkin Method |
|
Calculation of Odour Emissions |
|
Detailed Prediction Results (Operation
Phase) |
|
Detailed Prediction Results (Odour,
Operation Phase) |
|
Construction Phasing Plan |
|
Prevailing Background Noise Measurement
Data |
|
Photographic Records of the Existing
Representative Noise Sensitive Receivers |
|
Tentative Construction Programme |
|
Tentative Construction Plant Inventory |
|
Marine Traffic Data with endorsement letter
from Marine Department |
|
Road Traffic Forecast Data |
|
Endorsement of the Traffic Forecast Data
from Transport Department |
|
Computation Plot of Road Traffic Noise
Model |
|
Fixed Plant Inventory |
|
Predicted Road Traffic Noise Level at TKO
132 |
|
Predicted Road Traffic Noise Level at TKO
137 |
|
Marine Traffic Noise Impact Assessment |
|
Indicative Reclamation Sequences at TKO 137 |
|
Indicative Reclamation Sequences at TKO 132 |
|
Typical Arrangement of Submerged Outfall |
|
Refined Model Grid Layout, Properties and
Performance Verifications |
|
Refined Model Spin-up Test Results |
|
Modelling Scenarios for Construction Phase |
|
Locations of Cross Sections |
|
Non-point Source Surface Runoff |
|
Typical Pier Arrangement |
|
Construction Phase Model Results at WSRs –
Unmitigated Scenarios |
|
Construction Phase Contour Plots for SS
Elevation and Sedimentation – Unmitigated Scenarios |
|
Construction Phase Model Results at WSRs –
Mitigated Scenarios |
|
Construction Phase Contour Plots for SS
Elevation and Sedimentation – Mitigated Scenarios |
|
Sediment Quality Results for Nutrients and
Sediment Oxygen Demand at TKO 137 |
|
Sediment Quality Results for Nutrients and
Sediment Oxygen Demand at TKO 132 |
|
|
|
|
|
|
|
|
|
|
|
Elutriate Test Results for TKO 137 |
|
Elutriate Test Results for TKO 132 |
|
Construction Phase Nutrient and Contaminant
Concentrations at WSRs |
|
Indicative Arrangement of Double Floating
Type Silt Curtains |
|
Operation Phase Flow Vectors and Contour
Plots for Flow Speeds |
|
Operation Phase Timeseries Plots for
Momentary and Accumulated Flow and Relative Changes of Flow Rates and Flow
Speeds |
|
Operation Phase Water Quality Model Results
at WSRs |
|
Operation Phase Water Quality Contour
Plots |
|
Emergency Discharge Timing |
|
Operation Phase Water Quality Timeseries
Plots - Dissolved Oxygen |
|
Operation Phase Water Quality Timeseries
Plots - Total Inorganic Nitrogen |
|
Operation Phase Water Quality Timeseries
Plots - Suspended Solids |
|
Operation Phase Water Quality Timeseries
Plots and Table of Maximum Levels - E. coli |
|
Operation Phase Water Quality Timeseries
Plots - Unionized Ammonia |
|
Operation Phase Water Quality Timeseries
Plots - Salinity |
|
Process Flow Diagram of Sewage Treatment
for TKO 137 Effluent Polishing Plant |
|
Process Flow Diagram of Sludge Treatment
for TKO 137 Effluent Polishing Plant |
|
Proposed Sewerage Alignment at TKO 132
& TKO 137 |
|
Reviewed Historical
Aerial Photographs |
|
Available Ground Investigation Records |
|
Acquisition of
Information from Government Departments |
|
Photographic
Records of Site Walkover |
|
Site Walkover
Checklists |
|
Risk-Based
Remediation Goals (RBRGs) for Soil and Soil Saturation Limit and for
Groundwater and Solubility Limit |
|
Typical Design of a
Groundwater Monitoring Well |
|
Relevant Experience
of Key Ecological Surveyors |
|
Representative
Photographs of Habitat Types and Species of Conservation Importance within
the Assessment Area |
|
Flora Species
Recorded within the Assessment Area |
|
Fauna Species
Recorded within the Assessment Area |
|
Findings of Rapid
Ecological Assessment for Coral Communities |
|
Intertidal Species
Recorded at Sampling Locations in the Assessment Area in the Qualitative
Survey |
|
Intertidal Species
Recorded at Sampling Locations in the Assessment Area in the Quantitative
Survey |
|
Abundance and Biomass of Benthic Species Recorded at Sampling Locations in
the Assessment Area |
|
Relevant Experience
of Key Surveyors of Fisheries Surveys |
|
Adult Fish Survey
Data |
|
Commercial Value of
Fisheries Species |
|
Full List of Vessel
Data |
|
Broad-brush tree survey and plans |
|
Built Heritage and Other Identified Item Recording
Sheet |
|
Site Visits Photo
Record |
|
Research References |
|
Marine Archaeology Investigation Report |
|
Hazard to Life Assessment for a Planned
Desalination Plant |
|
Hazard to Life Assessment for an Existing
Synthetic Natural Gas (SNG) Production Plant |
|
Hazard to Life Assessment for a Proposed
Effluent Polishing Plant |
|
Hazard to Life Assessment for a Proposed
Green Fuel Station (GFS) |
|
SENT and SENTX Landfill Gas Monitoring Location and Monitoring Data |
|
Summary of SENT and SENTX Landfill Gas Monitoring Data |
|
Key Assessment Assumptions and Limitations
of Assessment Methodologies |
|
Summary of Environmental Impacts |
|
Details of Schedule 2 Designated Projects
for Environmental Permit Application |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|