Development of
Tseung Kwan O Area 137 and Associated Reclamation Sites –
Investigation Design
and Construction
Table of Content
List of Appendices |
|
Tentative Preliminary Development Schedule |
|
Tentative
Construction Programme |
|
Site
Phasing Plan |
|
Proposed
Construction Traffic Routing |
|
Calculation
of Vehicular Emissions |
|
Calculation
of Start Emissions |
|
Calculation
of Emissions from CHP and Boiler |
|
Calculation
of TKO132 CBP, PFTF, CWHF |
|
Calculation
of Marine Emissions |
|
Calculation
of Existing Industrial Chimney Emissions |
|
Determination
of Surface Characteristics |
|
Calculation
of Portal Emissions |
|
Derivation
of Cumulative Annual Average NOX-to-NO2 Conversion
Equation using Jenkin Method |
|
Calculation
of Odour Emissions |
|
Detailed
Prediction Results (Operation Phase) |
|
Detailed
Prediction Results (Odour, Operation Phase) |
|
Construction
Phasing Plan |
|
Prevailing
Background Noise Measurement Data |
|
Photographic
Records of the Existing Representative Noise Sensitive Receivers |
|
Tentative
Construction Programme |
|
Tentative
Construction Plant Inventory |
|
Marine
Traffic Data with endorsement letter from Marine Department |
|
Road
Traffic Forecast Data |
|
Endorsement
of the Traffic Forecast Data from Transport Department |
|
Computation
Plot of Road Traffic Noise Model |
|
Fixed
Plant Inventory |
|
Predicted
Road Traffic Noise Level at TKO 132 |
|
Predicted
Road Traffic Noise Level at TKO 137 |
|
Marine
Traffic Noise Impact Assessment |
|
Indicative
Reclamation Sequences at TKO 137 |
|
Indicative
Reclamation Sequences at TKO 132 |
|
Typical
Arrangement of Submerged Outfall |
|
Refined
Model Grid Layout, Properties and Performance Verifications |
|
Refined
Model Spin-up Test Results |
|
Modelling
Scenarios for Construction Phase |
|
Locations
of Cross Sections |
|
Non-point
Source Surface Runoff |
|
Typical
Pier Arrangement |
|
Construction
Phase Model Results at WSRs – Unmitigated Scenarios |
|
Construction
Phase Contour Plots for SS Elevation and Sedimentation – Unmitigated
Scenarios |
|
Construction
Phase Model Results at WSRs – Mitigated Scenarios |
|
Construction
Phase Contour Plots for SS Elevation and Sedimentation – Mitigated Scenarios |
|
Sediment
Quality Results for Nutrients and Sediment Oxygen Demand at TKO 137 |
|
Sediment
Quality Results for Nutrients and Sediment Oxygen Demand at TKO 132 |
|
|
|
|
|
|
|
|
|
|
|
Elutriate
Test Results for TKO 137 |
|
Elutriate
Test Results for TKO 132 |
|
Construction
Phase Nutrient and Contaminant Concentrations at WSRs |
|
Indicative
Arrangement of Double Floating Type Silt Curtains |
|
Operation
Phase Flow Vectors and Contour Plots for Flow Speeds |
|
Operation
Phase Timeseries Plots for Momentary and Accumulated Flow and Relative
Changes of Flow Rates and Flow Speeds |
|
Operation
Phase Water Quality Model Results at WSRs |
|
Operation
Phase Water Quality Contour Plots |
|
Emergency
Discharge Timing |
|
Operation
Phase Water Quality Timeseries Plots - Dissolved Oxygen |
|
Operation
Phase Water Quality Timeseries Plots - Total Inorganic Nitrogen |
|
Operation
Phase Water Quality Timeseries Plots - Suspended Solids |
|
Operation
Phase Water Quality Timeseries Plots and Table of Maximum Levels - E. coli |
|
Operation
Phase Water Quality Timeseries Plots - Unionized Ammonia |
|
Operation
Phase Water Quality Timeseries Plots - Salinity |
|
Process
Flow Diagram of Sewage Treatment for TKO 137 Effluent Polishing Plant |
|
Process
Flow Diagram of Sludge Treatment for TKO 137 Effluent Polishing Plant |
|
Proposed
Sewerage Alignment at TKO 132 & TKO 137 |
|
Reviewed Historical Aerial Photographs |
|
Available Ground Investigation
Records |
|
Acquisition of Information from Government Departments |
|
Photographic Records of Site Walkover |
|
Site Walkover Checklists |
|
Risk-Based Remediation Goals (RBRGs) for Soil and Soil Saturation
Limit and for Groundwater and Solubility Limit |
|
Typical Design of a Groundwater Monitoring Well |
|
Relevant Experience of Key Ecological Surveyors |
|
Representative Photographs of Habitat Types and Species of
Conservation Importance within the Assessment Area |
|
Flora Species Recorded within the Assessment Area |
|
Fauna Species Recorded within the Assessment Area |
|
Findings of Rapid Ecological Assessment for Coral Communities |
|
Intertidal Species Recorded at Sampling Locations in the Assessment
Area in the Qualitative Survey |
|
Intertidal Species Recorded at Sampling Locations in the Assessment
Area in the Quantitative Survey |
|
Abundance and Biomass of Benthic Species
Recorded at Sampling Locations in the Assessment Area |
|
Relevant Experience of Key Surveyors of Fisheries Surveys |
|
Adult Fish Survey Data |
|
Commercial Value of Fisheries Species |
|
Full List of Vessel Data |
|
Broad-brush tree
survey and plans |
|
Built Heritage and
Other Identified Item Recording Sheet |
|
Site
Visits Photo Record |
|
Research References |
|
Marine Archaeology
Investigation Report |
|
Hazard
to Life Assessment for a Planned Desalination Plant |
|
Hazard
to Life Assessment for an Existing Synthetic Natural Gas (SNG) Production
Plant |
|
Hazard
to Life Assessment for a Proposed Effluent Polishing Plant |
|
Hazard
to Life Assessment for a Proposed Green Fuel Station (GFS) |
|
SENT and SENTX Landfill Gas Monitoring Location and Monitoring Data |
|
Summary of SENT and SENTX Landfill Gas Monitoring Data |
|
Key
Assessment Assumptions and Limitations of Assessment Methodologies |
|
Summary
of Environmental Impacts |
|
Details
of Schedule 2 Designated Projects for Environmental Permit Application |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|