Development of Tseung Kwan O Area 137 and Associated Reclamation Sites –

Investigation Design and Construction

Table of Content

 

List of Figures

Figure 1.1

Project Location Plan

Figure 1.2

Location of Designated Projects (Sheet 1 of 2)

Figure 1.3

Location of Designated Projects (Sheet 2 of 2)

Figure 2.1

Current Outline Zoning Plan of TKO 137

Figure 2.2

Preliminary Land Use of Land to be Created off TKO 132

Figure 2.3

Land Requirement Plan for TKO 132

Figure 2.4

Recommended Outline Development Plan of TKO 137

Figure 2.5

Recommended Outline Development Plan of TKO 132

Figure 2.6

Preliminary Outline Development Plan - TKO Area 137

Figure 2.7

Preliminary Outline Development Plan – Reclaimed land off TKO Area 132

Figure 2.8

Reclamation Extent at TKO 137

Figure 2.9

Reclamation Extent at TKO 132

Figure 2.10.1

Location Plan of TKO 137 Effluent Polishing Plant

Figure 2.10.2

Schematic Layout of TKO 137 Effluent Polishing Plant

Figure 2.11

General Layout – Works at TKO 137

Figure 2.12

General Layout – Works at TKO 132

Figure 2.13

Locations of Concurrent Projects

Figure 3.1.1

Locations of Representative Air Sensitive Receivers at TKO 137 (Construction Phase)

Figure 3.1.2

Locations of Representative Air Sensitive Receivers at TKO 132 (Construction Phase)

Figure 3.2.1

Locations of Representative Air Sensitive Receivers at TKO 137 (Operation Phase)

Figure 3.2.2

Locations of Representative Air Sensitive Receivers at TKO 132 (Operation Phase)

Figure 3.3.1

Contour of Predicted 10th Highest Cumulative Daily RSP Concentration at 1.5 mAG at TKO 137 (µg/m3) 

Figure 3.3.2

Contour of Predicted 10th Highest Cumulative Daily RSP Concentration at 1.5 mAG at TKO 132 (µg/m3) 

Figure 3.4.1

Contour of Predicted Cumulative Annual RSP Concentration at 1.5 mAG at TKO 137

(µg/m3)

Figure 3.4.2

Contour of Predicted Cumulative Annual RSP Concentration at 1.5 mAG at TKO 132

(µg/m3)

Figure 3.5.1

Contour of Predicted 19th Highest Cumulative Daily FSP Concentration at 1.5 mAG at TKO 137 (µg/m3)

Figure 3.5.2

Contour of Predicted 19th Highest Cumulative Daily FSP Concentration at 1.5 mAG at TKO 137 (µg/m3)

Figure 3.6.1

Contour of Predicted Cumulative Annual FSP Concentration at 1.5 mAG at TKO 137

(µg/m3)

Figure 3.6.2

Contour of Predicted Cumulative Annual FSP Concentration at 1.5 mAG at TKO 132

(µg/m3)

Figure 3.7.1

Contour of Predicted 19th Highest Cumulative Hourly NO2 Concentration at 1.5 mAG

at TKO 137 (µg/m3)

Figure 3.7.2

Contour of Predicted 19th Highest Cumulative Hourly NO2 Concentration at 1.5 mAG

at TKO 132 (µg/m3)

Figure 3.8.1

Contour of Predicted 10th Highest Cumulative Daily NO2 Concentration at 10 mAG at TKO 137 (µg/m3)

Figure 3.8.2

Contour of Predicted 10th Highest Cumulative Daily NO2 Concentration at 1.5 mAG at TKO 132 (µg/m3)

 

 

 

 

 

 

 

 

 

 

Figure 3.8.3

Contour of Predicted 10th Highest Cumulative Daily NO2 Concentration at 10 mAG at

TKO 132 (µg/m3) 

Figure 3.9.1

Contour of Predicted Cumulative Annual NO2 Concentration at 1.5 mAG at TKO 137

(µg/m3)

Figure 3.9.2

Contour of Predicted Cumulative Annual NO2 Concentration at 1.5 mAG at TKO 132

(µg/m3)

Figure 3.10.1

Contour of Predicted 4th Highest Cumulative 10-Min SO2 Concentration at 1.5 mAG at TKO 137 (µg/m3)

Figure 3.10.2

Contour of Predicted 4th Highest Cumulative 10-Min SO2 Concentration at 1.5 mAG at TKO 132 (µg/m3)

Figure 3.11.1

Contour of Predicted 4th Highest Cumulative Daily SO2 Concentration at 10 mAG at

TKO 137 (µg/m3)

Figure 3.11.2

Contour of Predicted 4th Highest Cumulative Daily SO2 Concentration at 10 mAG at

TKO 132 (µg/m3)

Figure 3.11.3

Contour of Predicted 4th Highest Cumulative Daily SO2 Concentration at 15 mAG at

TKO 132 (µg/m3)

Figure 3.12.1

Contour of Predicted Highest Cumulative Hourly CO Concentration at 140 mAG

(µg/m3) at TKO 137

Figure 3.12.2

Contour of Predicted Highest Cumulative Hourly CO Concentration at 1.5 mAG

(µg/m3) at TKO 132

Figure 3.13.1

Contour of Predicted Highest Cumulative 8-Hourly CO Concentration at 1.5 mAG

(µg/m3) at TKO 137

Figure 3.13.2

Contour of Predicted Highest Cumulative 8-Hourly CO Concentration at 1.5 mAG

(µg/m3) at TKO 132

Figure 3.14.1

Contour of Predicted Highest Cumulative Daily CO Concentration at 10 mAG (µg/m3)

at TKO 137

Figure 3.14.2

Contour of Predicted Highest Cumulative Daily CO Concentration at 1.5 mAG (µg/m3) at TKO 132

Figure 3.15.1

Contour of Predicted Highest Cumulative 5-Second Odour Concentration at 1.5 mAG

at TKO 137 (OU/m3)

Figure 3.15.2

Contour of Predicted Highest Cumulative 5-Second Odour Concentration at 1.5 mAG

at TKO 132 (OU/m3)

Figure 4.1.1

Noise Assessment Area and Locations of NSRs for Construction Noise at TKO 132

Figure 4.1.2

Noise Assessment Area and Locations of NSRs for Road Traffic and Fixed Noise at

TKO 132

Figure 4.1.3

Noise Assessment Area and Locations of NSRs for Construction, Road Traffic, Fixed

and Rail Noise at TKO 137

Figure 4.1.4

Noise Assessment Area and Locations of NSRs for Marine Traffic Noise at TKO 132

and TKO 137

Figure 4.2

Locations of Noise Measurement Points for Fixed Noise Source and Marine Traffic

Noise Assessment

Figure 4.3.1

Locations of NAPs for Construction Noise at TKO 132

Figure 4.3.2

Locations of NAPs for Construction Noise at TKO 137

Figure 4.4.1

Locations of NAPs for Fixed Noise at TKO 132

Figure 4.4.2

Locations of NAPs for Fixed Noise at TKO 137

Figure 4.5

Locations of NAPs for Rail Noise at TKO 137

Figure 4.6.1

Locations of NAPs for Road Traffic Noise at TKO 132

Figure 4.6.2

Locations of NAPs for Road Traffic Noise at TKO 137

Figure 4.7

Locations of NAPs for Marine Traffic Noise at TKO 132 and TKO 137

Figure 4.8.1

Project Road Extent at TKO 132

Figure 4.8.2

Project Road Extent at TKO 137

Figure 4.9

Optimised Road Traffic Noise Mitigation Measures at TKO 137

Figure 5.1

Water Sensitive Receivers

Figure 6.1

Layout Plan of TKO 137 EPP

Figure 7.1

Location Plan of Temporary Stockpiling Areas and Barging Points with Conveyors at

TKO 137

 

Figure 7.2

Location Plan of Temporary Stockpiling Areas and Barging Points with Conveyors at

TKO 132

Figure 7.3

As-built Sediment Sampling Locations (TKO 137)

Figure 7.4

As-built Sediment Sampling Locations (TKO 132)

Figure 8.1

Locations of Chemical Waste Producers (TKO 137)

Figure 8.2

Locations of Chemical Waste Producers (TKO 132)

Figure 8.3

Locations of Incident Records (Sheet 1 of 3)

Figure 8.4

Locations of Incident Records (Sheet 2 of 3)

Figure 8.5

Locations of Incident Records (Sheet 3 of 3)

Figure 8.6

Areas with Potential Land Contamination Concerns

Figure 8.7

Concerned Area and Sampling Locations (Site S1)

Figure 9.1

Assessment Area for Terrestrial Ecology and Ecological Survey Locations

Figure 9.2

Previous Relevant Studies and Location of Species of Conservation Importance from

Previous Studies (Key Plan)

Figure 9.2.1

Previous Relevant Studies and Location of Species of Conservation Importance from

Previous Studies (Sheet 1 of 2)

Figure 9.2.2

Previous Relevant Studies and Location of Species of Conservation Importance from

Previous Studies (Sheet 2 of 2)

Figure 9.2.3

Previous Relevant Studies and Location of Species of Conservation Importance from

Previous Studies

Figure 9.3

Marine Ecological Sensitive Receivers within and in Vicinity of the Assessment Areas

Figure 9.4

Transects and Sampling Locations for Marine Ecological Surveys

Figure 9.5

Habitat Map and Location of Species of Conservation Importance from Recent Surveys (Key Plan)

Figure 9.5.1

Habitat Map and Location of Species of Conservation Importance from Recent Surveys (Sheet 1 of 2)

Figure 9.5.2

Habitat Map and Location of Species of Conservation Importance from Recent Surveys (Sheet 2 of 2)

Figure 9.5.3

Habitat Map and Location of Species of Conservation Importance from Recent Surveys (Sheet 1 of 2)

Figure 9.5.4

Habitat Map and Location of Species of Conservation Importance from Recent Surveys (Sheet 2 of 2)

Figure 9.6.1

Permanently and Temporarily Affected Area (TKO 137)

Figure 9.6.2

Permanently and Temporarily Affected Area (TKO 132)

Figure 9.6.3

Key Land-based Construction Works and Marine Works in TKO 132

Figure 9.6.4

Key Land-based Construction Works and Marine Works in TKO 137

Figure 10.1

Locations of Fisheries Sensitive Receivers

Figure 10.2

Locations of Fisheries Field Survey

Figure 10.3.1

Distribution of Fishing Operation – Overall (AFCD Port Survey 2021)

Figure 10.3.2

Distribution of Fishing Operation – Sampan (AFCD Port Survey 2021)

Figure 10.3.3

Distribution of Fishing Operation – Other Types of Fishing Vessels (AFCD Port

Survey 2021)

Figure 10.4

Distribution of Fisheries Production – Overall (AFCD Port Survey 2021)

Figure 10.5

Results of Vessel Survey

Figure 11.1.0

Project Boundary for Landscape and Visual Impact Assessment

Figure 11.1.1

Landscape Impact Study Boundary – Construction Phase

Figure 11.2.0

Landscape Resources

Figure 11.2.1

Photographs of Landscape Resources (Sheet 1 of 2)

Figure 11.2.2

Photographs of Landscape Resources (Sheet 2 of 2)

Figure 11.2.3

Landscape Resource Impact Plan

Figure 11.3.0

Landscape Character Areas

Figure 11.3.1

Photographs of Landscape Character Areas (Sheet 1 of 2)

Figure 11.3.2

Photographs of Landscape Character Areas (Sheet 2 of 2)

Figure 11.3.3

Landscape Character Area Impact Plan

Figure 11.4.0

Visual Envelope and Key Public Viewpoints

Figure 11.4.1

VP1 Photomontage

Figure 11.4.2

VP2A Photomontage

Figure 11.4.3

VP2B Photomontage

Figure 11.4.4

VP3 Photomontage

Figure 11.4.5

VP4 Photomontage

Figure 11.4.6

VP5 Photomontage

Figure 11.4.7

VP6 Photomontage

Figure 11.4.8

VP7 Photomontage

Figure 11.4.9

VP8 Photomontage

Figure 11.4.10

VP9 Photomontage

Figure 11.4.11

VP10 Photomontage

Figure 11.4.12

VP11A Photomontage

Figure 11.4.13

VP11B Photomontage

Figure 11.4.14

VP12 Photomontage

Figure 11.4.15

Visual Impact Plan

Figure 11.5.0

Key Landscape and Visual Mitigation Plan

Figure 11.5.1

Landscape and Visual Mitigation Plan (Overall) – TKO 137

Figure 11.5.2

Landscape and Visual Mitigation Part Plan (1) for DP 2 and DP 3 in TKO 137

(Sheet 1 of 2)

Figure 11.5.3

Landscape and Visual Mitigation Part Plan (2) for DP 2 and DP 3 in TKO 137

(Sheet 2 of 2)

Figure 11.5.4

Landscape and Visual Mitigation Plan (Overall) – TKO 132

Figure 11.5.5

Landscape and Visual Mitigation Part Plan (1) for DP 1, DP2, DP4, DP5 and DP6 in

TKO 132 (Sheet 1 of 3)

Figure 11.5.6

Landscape and Visual Mitigation Part Plan (2) for DP 1, DP2, DP4, DP5 and DP6 in

TKO 132 (Sheet 2 of 3)

Figure 11.5.7

Landscape and Visual Mitigation Part Plan (3) for DP 1, DP2, DP4, DP5 and DP6 in

TKO 132 (Sheet 3 of 3)

Figure 11.5.8

Landscape and Visual Mitigation Section

Figure 11.5.9

Landscape and Visual Mitigation Section

Figure 12.1

Old Aerial Photo of the Project (1982)

Figure 12.2

Geological Map of TKO 137

Figure 12.3

Geological Map of TKO 132

Figure 12.4

Terrestrial Archaeological Background of the Assessment Area Key Plan

Figure 12.5

Terrestrial Archaeological Background of the Assessment Area (TKO 137)

Figure 12.6

Terrestrial Archaeological Background of the Assessment Area (TKO 132)

Figure 12.7

Marine Archaeology Background of the Assessment Area (TKO 137)

Figure 12.8

Marine Archaeology Background of the Assessment Area (TKO 132)

Figure 12.9

Location of Built Heritage and Other Identified Items (TKO 132)

Figure 12.10

Location of Archaeological Heritage in relation to the RODP (TKO 137)

Figure 12.11

Gradient of TKO 132

Figure 12.12

Construction Works in the Vicinity of Fat Tau Chau House Ruin SAI

Figure 12.13

Locations of the Archaeological Exclusion Zones (AEZs)

Figure 14.1

Location Plan Of South East New Territories Landfill and Its Extension

Figure A

Location Plan of Designated Project 1 (DP1) – Marine Viaduct

Figure B

Location Plan of Designated Project 2 (DP2) – Reclamation at TKO 137 and TKO 132

Figure C

Location Plan of Designated Project 3 (DP3) – Effluent Polishing Plant