CONTENTS

Volume 2- Figures

 

FIGURES

 

Figure 1.1        Project Location

Figure 1.2        Layout of Proposed Marine Facilities

 

Figure 2.1        Alternative ATCL Alignment and TCC Station Siting Options

Figure 2.2        Alternative Depot Location Options

Figure 2.3        Design of Depot

Figure 2.4        Alternative Marine Facilities Location Options

Figure 2.5(a)    Illustrations of Construction Methods – Land Viaduct and Marine Viaduct

Figure 2.5(b)    Illustrations of Construction Methods – At-Grade Road Section – Method 1

Figure 2.5(c)    Illustrations of Construction Methods – At-Grade Road Section – Method 2

Figure 2.5(d)    Illustrations of Construction Methods – At-Grade Road Section – Method 3

Figure 2.5(e)    Illustrations of Construction Methods - Wave Attenuator and Floating Pontoon

Figure 2.6        Locations of Concurrent Projects

 

Figure 3.1        Locations of Air Quality Monitoring Stations and the Concerned PATH Grids

Figure 3.2        Locations of Representative Air Sensitive Receivers (Construction Phase)

Figure 3.3        Locations of Representative Air Sensitive Receivers (Operational Phase)

Figure 3.4        Contour of Cumulative Maximum 1-hour TSP Concentration (µg/m3) at 1.5mAG (Construction Phase)

Figure 3.5        Contour of Cumulative 10th Highest Daily RSP Concentration (µg/m3) at 1.5mAG (Construction Phase)

Figure 3.6        Contour of Cumulative Annual RSP Concentration (µg/m3) at 1.5mAG (Construction Phase)

Figure 3.7        Contour of Cumulative 36th Highest Daily FSP Concentration (µg/m3) at 1.5mAG (Construction Phase)

Figure 3.8        Contour of Cumulative Annual FSP Concentration (µg/m3) at 1.5mAG (Construction Phase)

Figure 3.9        Contour of Cumulative 10th Highest Daily RSP Concentration (µg/m3) at 15.0mAG (Operational Phase)

Figure 3.10      Contour of Cumulative Annual RSP Concentration (µg/m3) at 1.5mAG (Operational Phase)

Figure 3.11      Contour of Cumulative 36th Highest Daily FSP Concentration (µg/m3) at 1.5mAG (Operational Phase)

Figure 3.12      Contour of Cumulative Annual FSP Concentration (µg/m3) at 1.5mAG (Operational Phase)

Figure 3.13      Contour of Cumulative 19th Highest Hourly NO2 Concentration (µg/m3) at 1.5mAG (Operational Phase)

Figure 3.14      Contour of Cumulative Annual NO2 Concentration (µg/m3) at 1.5mAG (Operational Phase)

Figure 3.15      Contour of Cumulative Maximum 10-min SO2 Concentration (µg/m3) at 1.5mAG (Operational Phase)

Figure 3.16      Contour of Cumulative 4th Highest Daily SO2 Concentration (µg/m3) at 15.0mAG (Operational Phase)

Figure 3.17      Contour of Cumulative 19th Highest Hourly NO2 Concentration (µg/m3) at 5.0mAG (Operational Phase)

Figure 3.18      Contour of Cumulative Annual NO2 Concentration (µg/m3) at 5.0mAG (Operational Phase)

Figure 3.19      Contour of Cumulative Annual NO2 Concentration (µg/m3) at 10.0mAG (Operational Phase)

 

Figure 4.1        Noise Sensitive Receivers within 300m Assessment Area

Figure 4.2        Representative Construction Noise Assessment Points and Construction Works Areas – Key Plan (Sheet 1 of 6)

Figure 4.3        Representative Construction Noise Assessment Points and Construction Works Areas (Sheet 2 of 6)

Figure 4.4        Representative Construction Noise Assessment Points and Construction Works Areas (Sheet 3 of 6)

Figure 4.5        Representative Construction Noise Assessment Points and Construction Works Areas (Sheet 4 of 6)

Figure 4.6        Representative Construction Noise Assessment Points and Construction Works Areas (Sheet 5 of 6)

Figure 4.7        Representative Construction Noise Assessment Points and Construction Works Areas (Sheet 6 of 6)

Figure 4.8        Representative Operational Noise Assessment Points and Assessed Noise Segments

Figure 4.9        Roof Canopy of Tung Chung Central Station

 

Figure 5.1        Water Sensitive Receivers and EPD Marine Water / Sediment Quality Monitoring Stations in the North Western Water Control Zone

 

Figure 6.1        Actual Sediment Sampling Locations, Updated Excavation Area, Location of Marine Sediment and Location of Stockpiling Area

Figure 6.2a      Transportation Route for Wastes (Page 1 of 2)

Figure 6.2b      Transportation Route for Wastes (Page 2 of 2)

 

Figure 7.1a-b   Habitat Map and Species of Conservation Importance Recorded from Surveys

Figure 7.2        Survey Transect for Terrestrial Ecology

Figure 7.3        Assessment Area for Marine Ecological Impact Assessment

Figure 7.4        Marine Ecological Survey Location

Figure 7.5        Location for PAM Deployment

Figure 7.6        Habitat Photos and Species of Conservation Importance

Figure 7.7a-b   Representative Photos of Coral Surveys

Figure 7.8        Representative Photos of Intertidal Surveys

 

Figure 8.1        Distribution of Fishing Operations (Overall) in HKSAR Waters

Figure 8.2        Distribution of Fishing Operations (Sampan) in HKSAR Waters

Figure 8.3        Distribution of Fishing Production (Overall) (Adult Fish) in HKSAR Waters

Figure 8.4        Fisheries Sensitive Receivers

 

Figure 9.1        Cultural Heritage Impact Assessment Area

Figure 9.2        MAI Assessment Area and Previous Geophysical Surveys Conducted in Adjacent Area

Figure 9.3        Geophysical Survey Area

 

Figure 10.1      Landscape Study Area

Figure 10.2      Review of Planning Framework Chek Lap Kok & Tung Chung

Figure 10.3a    Landscape Resources (General Plan)

Figure 10.3b    Landscape Resources (Blow Up Plan 1)

Figure 10.3c    Landscape Resources (Blow Up Plan 2)

Figure 10.4a    Landscape Resources Photographs (1 of 2)

Figure 10.4b    Landscape Resources Photographs (2 of 2)

Figure 10.5a    Landscape Character Areas Plan (General Plan)

Figure 10.5b    Landscape Character Areas Plan (Blow Up Plan 1)

Figure 10.5c    Landscape Character Areas Plan (Blow Up Plan 2)

Figure 10.6a    Landscape Character Areas Photographs (1 of 2)

Figure 10.6b    Landscape Character Areas Photographs (2 of 2)

Figure 10.7      Visual Envelope Plan

Figure 10.8      Visually Sensitive Receivers Plan

Figure 10.9a    Visually Sensitive Receivers Photographs (1 of 4)

Figure 10.9b    Visually Sensitive Receivers Photographs (2 of 4)

Figure 10.9c    Visually Sensitive Receivers Photographs (3 of 4)

Figure 10.9d    Visually Sensitive Receivers Photographs (4 of 4)

Figure 10.10a  Landscape and Visual Mitigation Plan (General Plan)

Figure 10.10b  Landscape and Visual Mitigation Plan (Blow Up Plan 1)

Figure 10.10c  Landscape and Visual Mitigation Plan (Blow Up Plan 2)

Figure 10.10d  Landscape and Visual Mitigation Plan (Blow Up Plan 3)

Figure 10.10e  Landscape and Visual Mitigation Plan (Blow Up Plan 4)

Figure 10.10f   Landscape and Visual Mitigation Plan (Blow Up Plan 5)

Figure 10.10g  Landscape and Visual Mitigation Plan (Blow Up Plan 6)

Figure 10.10h  Landscape and Visual Mitigation Plan (Blow Up Plan 7)

Figure 10.11a  Photomontage VP1

Figure 10.11b  Photomontage VP2

Figure 10.11c  Photomontage VP3

Figure 10.11d  Photomontage VP4

Figure 10.11e  Photomontage VP5

Figure 10.11f   Photomontage VP6

Figure 10.11g  Photomontage VP7

Figure 10.11h  Photomontage VP8

Figure 10.11i   Photomontage VP9

Figure 10.11j   Photomontage VP10

Figure 10.11k  Photomontage VP11

Figure 10.12a  Conceptual Section Illustrating Mitigation Measure (1 of 3)

Figure 10.12b  Conceptual Section Illustrating Mitigation Measure (2 of 3)

Figure 10.12c  Conceptual Section Illustrating Mitigation Measure (3 of 3)