CONTENTS
FIGURES
Figure 1.2 Layout
of Proposed Marine Facilities
Figure 2.1 Alternative
ATCL Alignment and TCC Station Siting Options
Figure 2.2 Alternative
Depot Location Options
Figure 2.4 Alternative
Marine Facilities Location Options
Figure 2.5(a) Illustrations of Construction
Methods – Land Viaduct and Marine Viaduct
Figure 2.5(b) Illustrations of Construction
Methods – At-Grade Road Section – Method 1
Figure 2.5(c) Illustrations of Construction
Methods – At-Grade Road Section – Method 2
Figure 2.5(d) Illustrations of Construction
Methods – At-Grade Road Section – Method 3
Figure 2.5(e) Illustrations of Construction
Methods - Wave Attenuator and Floating Pontoon
Figure 2.6 Locations
of Concurrent Projects
Figure 3.1 Locations
of Air Quality Monitoring Stations and the Concerned PATH Grids
Figure 3.2 Locations
of Representative Air Sensitive Receivers (Construction Phase)
Figure 3.3 Locations
of Representative Air Sensitive Receivers (Operational Phase)
Figure 3.6 Contour
of Cumulative Annual RSP Concentration (µg/m3) at 1.5mAG (Construction Phase)
Figure 3.8 Contour
of Cumulative Annual FSP Concentration (µg/m3) at 1.5mAG (Construction Phase)
Figure 3.10 Contour of
Cumulative Annual RSP Concentration (µg/m3) at 1.5mAG (Operational Phase)
Figure 3.12 Contour of
Cumulative Annual FSP Concentration (µg/m3) at 1.5mAG (Operational Phase)
Figure 3.14 Contour of
Cumulative Annual NO2 Concentration (µg/m3) at 1.5mAG (Operational Phase)
Figure 3.18 Contour of
Cumulative Annual NO2 Concentration (µg/m3) at 5.0mAG (Operational Phase)
Figure 3.19 Contour of
Cumulative Annual NO2 Concentration (µg/m3) at 10.0mAG (Operational Phase)
Figure 4.1 Noise
Sensitive Receivers within 300m Assessment Area
Figure 4.8 Representative
Operational Noise Assessment Points and Assessed Noise Segments
Figure 4.9 Roof
Canopy of Tung Chung Central Station
Figure 6.2a Transportation
Route for Wastes (Page 1 of 2)
Figure 6.2b Transportation
Route for Wastes (Page 2 of 2)
Figure 7.1a-b Habitat Map and Species of
Conservation Importance Recorded from Surveys
Figure 7.2 Survey
Transect for Terrestrial Ecology
Figure 7.3 Assessment
Area for Marine Ecological Impact Assessment
Figure 7.4 Marine
Ecological Survey Location
Figure 7.5 Location
for PAM Deployment
Figure 7.6 Habitat
Photos and Species of Conservation Importance
Figure 7.7a-b Representative Photos of Coral
Surveys
Figure 7.8 Representative
Photos of Intertidal Surveys
Figure 8.1 Distribution
of Fishing Operations (Overall) in HKSAR Waters
Figure 8.2 Distribution
of Fishing Operations (Sampan) in HKSAR Waters
Figure 8.3 Distribution
of Fishing Production (Overall) (Adult Fish) in HKSAR Waters
Figure 8.4 Fisheries
Sensitive Receivers
Figure 9.1 Cultural
Heritage Impact Assessment Area
Figure 9.2 MAI
Assessment Area and Previous Geophysical Surveys Conducted in Adjacent Area
Figure 9.3 Geophysical
Survey Area
Figure 10.1 Landscape Study Area
Figure 10.2 Review of Planning Framework Chek Lap Kok & Tung Chung
Figure 10.3a Landscape Resources (General Plan)
Figure 10.3b Landscape Resources (Blow Up Plan 1)
Figure 10.3c Landscape Resources (Blow Up Plan 2)
Figure 10.4a Landscape Resources Photographs (1 of 2)
Figure 10.4b Landscape Resources Photographs (2 of 2)
Figure 10.5a Landscape Character Areas Plan (General Plan)
Figure 10.5b Landscape Character Areas Plan (Blow Up Plan 1)
Figure 10.5c Landscape Character Areas Plan (Blow Up Plan 2)
Figure 10.6a Landscape Character Areas Photographs (1 of 2)
Figure 10.6b Landscape Character Areas Photographs (2 of 2)
Figure 10.7 Visual Envelope Plan
Figure 10.8 Visually Sensitive Receivers Plan
Figure 10.9a Visually Sensitive Receivers Photographs (1 of 4)
Figure 10.9b Visually Sensitive Receivers Photographs (2 of 4)
Figure 10.9c Visually Sensitive Receivers Photographs (3 of 4)
Figure 10.9d Visually Sensitive Receivers Photographs (4 of 4)
Figure 10.10a Landscape and Visual Mitigation Plan (General Plan)
Figure 10.10b Landscape and Visual Mitigation Plan (Blow Up Plan 1)
Figure 10.10c Landscape and Visual Mitigation Plan (Blow Up Plan 2)
Figure 10.10d Landscape and Visual Mitigation Plan (Blow Up Plan 3)
Figure 10.10e Landscape and Visual Mitigation Plan (Blow Up Plan 4)
Figure 10.10f Landscape and Visual Mitigation Plan (Blow Up Plan 5)
Figure 10.10g Landscape and Visual Mitigation Plan (Blow Up Plan 6)
Figure 10.10h Landscape and Visual Mitigation Plan (Blow Up Plan 7)
Figure 10.11a Photomontage VP1
Figure 10.11b Photomontage VP2
Figure 10.11c Photomontage VP3
Figure 10.11d Photomontage VP4
Figure 10.11e Photomontage VP5
Figure 10.11f Photomontage VP6
Figure 10.11g Photomontage VP7
Figure 10.11h Photomontage VP8
Figure 10.11i Photomontage VP9
Figure 10.11j Photomontage VP10
Figure 10.11k Photomontage VP11
Figure 10.12a Conceptual Section Illustrating Mitigation Measure (1 of 3)
Figure 10.12b Conceptual Section Illustrating Mitigation Measure (2 of 3)
Figure 10.12c Conceptual Section Illustrating Mitigation Measure (3 of 3)