Environmental
Impact Assessment Report
November
2023
Reviewed: |
Fredrick LEONG |
|
17 November 2023 |
|
|
|
|
Approved for Issue: |
Alex LI MHKIE MICE |
|
17 November 2023 |
|
|
|
|
AECOM ASIA COMPANY LIMITED
Disclaimer:
This
report is prepared for Highways
Department (HyD) and is given for its sole benefit in relation to and
pursuant to Agreement No. CE 17/2022
(HY) Widening of Yuen Long
Highway (Section between Lam Tei Quarry and Tong Yan
San Tsuen Interchange)
– Investigation, Design and Construction and may not be disclosed
to, quoted to or relied upon by any person other than HyD without our prior
written consent. No person (other than HyD) into whose possession a copy of this report comes may rely on
this report without our express written consent and HyD may not rely on it for any purpose other than as described
above.
1. introduction
1.1 Project Background
1.2 Designated Projects under EIAO
1.3 Purpose of the EIA Study
1.4 Objectives of this EIA Study
1.5 Structure of the EIA Report
2.1 Purposes
and Objectives of the Project
2.2 Project
Site Location and Site History
2.3 Need
of the Project
2.4 Proposed
Project Design
2.5 Scenarios
“With” and “Without” the Project
2.6 Consideration
of Different Widening Options
2.7 Consideration
of Alternative Construction Methods and Sequences of Works
2.8 Construction
Programme
2.9 Concurrent
Projects
2.10 Public
Consultation
2.11 Reference
Environmental Permits
3. Air Quality
3.1 Introduction
3.2 Environmental
Legislations, Standards, and Criteria
3.3 Description
of the Environment
3.4 Identification
of Air Sensitive Receivers
3.5 Identification
of Environmental Impacts
3.6 Assessment
Methodology
3.7 Prediction
and Evaluation of Environmental Impacts
3.8 Mitigation
of Adverse Environmental Impacts
3.9 Evaluation
of Residual Impact
3.10 Environmental
Monitoring and Auditing
3.11 Conclusion
4. Noise
4.1 Introduction
4.2 Environmental
Legislations, Standards, and Criteria
4.3 Description
of the Environment
4.4 Noise
Sensitive Receivers
4.5 Identification
of Environmental Impacts
4.6 Assessment
Methodology
4.7 Prediction
and Evaluation of Environmental Impacts
4.8 Mitigation
of Environmental Impacts
4.9 Evaluation
of Residual Impact
4.10 Environmental
Monitoring and Auditing
4.11 Conclusion
5 Water Quality Impact Assessment Methodology
5.1 Introduction
5.2 Environmental Legislation, Standards, and Criteria
5.3 Assessment Methodology
for Construction Phase
5.4 Assessment
Methodology for Operation Phase
5.5 Baseline Conditions
5.6 Water Sensitive Receivers
5.7 Identification
of Water Quality Impact
5.8 Mitigation Measures
5.9 Residual
Impact
5.10 Monitoring
and Environmental Management
5.11 Conclusion
6. Waste Management Implications Assessment
6.1 Background
6.2 Environmental
Legislations, Standards, and Criteria
6.3 Assessment Methodology
6.4 Identification of
Waste Sources during Construction Phase
6.5 Analysis of Activities
and Waste Generation
6.6 Proposal for Waste
Management
6.7 Transportation
Arrangement for Waste Disposal during Construction Phase
6.8 Construction Phase
Waste Summary
6.9 Identification of
Waste Sources during Operation Phase
6.10 Mitigation Measures
for construction phase
6.11 Mitigation Measures
for operational phase
6.12 Residual Waste
Management Implications
6.13 Environmental
Monitoring and Audit
6.14 Conclusion and
Recommendations
7.1 Introduction
7.2 Relevant
Legislations, Standards & Guidelines
7.3 Assessment
Methodology
7.4 Review
of EIA reports
7.5 Description
of the Environment
7.6 Information
Request from Government Departments
7.7 Site
Walkover
7.8 Identification
of Potentially Contaminated Sites
7.9 Site
Investigation Plan
7.10 Evaluation of Land Contamination Impacts
7.11 Submission Requirement of CAR, RAP and RR
7.12 Environmental Acceptability of Schedule 2
Designated Projects
7.13 Conclusion and Recommendation
8. Ecology
8.1 Introduction
8.2 Environmental
Legislation and Standards
8.3 Assessment
Methodology
8.4 Baseline
Conditions
8.5 Evaluation
of Habitats
8.6 Potential
Ecological Impact
8.7 Proposed Mitigation
Measures
8.8 Residual
Impact
8.9 Environemnteal
Monitoring and Audit
8.10 Conclusion
9. Landscape and visual IMPACT assessment
9.1 General
9.2 Environmental Legislation, Standards and Criteria
9.3 Assessment Methodology
9.4 Review of Planning and Development Control Framework
9.5 Baseline Study of Landscape Condition
9.6 Baseline Study of Visual Conditions
9.7 Landscape and Visual Impact Assessment
9.8 Mitigation Measures
9.9 Residual Impacts
9.10 Cumulative Impacts
9.11 Environmental Monitoring and Audit (EM&A)
9.12 Summary
10.1 Introduction
10.2 Environmental Legislation, Standards, and
Guidelines
10.3 Baseline Conditions
10.4 Assessment Methodology
10.5 Impact Assessment
10.6 Mitigation Measures
10.7 Evaluation of Residual Impact and Cumulative Impact
10.8 Environmental Monitoring and Audit
10.9 Conclusions and Recommendations
10.10 Bibliography
11. ENVIRONMENTAL MONITORING AND AUDITING
11.1 Introduction
11.2 Air Quality Impact
11.3 Noise Impact
11.4 Water Quality Impact
11.5 Waste Management
Implications
11.6 Land Contamination
11.7 Ecological Impact
(Terrestrial)
11.8 Landscape and Visual
Impact
11.9 Impact on Cultural
Heritage
12. SUMMARY OF ENVIRONMENTAL OUTCOMES
12.1 Overview
12.2 Environmental Benefits
of the Project
12.3 Incorporation of
Environmentally Friendly Options
12.4 Environmental Design
Recommended
12.5 Key Environmental
Problems Avoided and Environmentally Sensitive Areas Protected
12.6 Key Assessment
Assumptions. Limitation of Assessment Methodologies and related Prior
Agreement(s) with the Director
12.7 Estimation of
Population Protected
12.8 Conclusion of
Environmental Impacts
13. CONCLUSION
13.1 Introduction
13.2 Conclusion of Environmental Impacts
13.3 Conclusion
Figures
Location Plan of the
Project |
|
Scheme 1, 2 & 3 |
|
Recommended Road
Scheme |
|
Locations of Potential
Concurrent Projects |
|
Air Quality Impact
Assessment Area |
|
Representative Air
Sensitive Receivers |
|
Extent of Works |
|
Locations of Potential
Concurrent Projects |
|
Locations of
Underpasses, Noise Barriers, Semi-Enclosures, and Full Enclosures |
|
Locations of
Underpasses, Noise Barriers, Semi-Enclosures, and Full Enclosures |
|
Locations of Underpasses,
Noise Barriers, Semi-Enclosures, and Full Enclosures |
|
Locations of
Underpasses, Noise Barriers, Semi-Enclosures, and Full Enclosures |
|
Locations of Portal
Emissions |
|
Locations of Portal
Emissions |
|
Locations of Portal
Emissions |
|
Locations of
Industrial Emissions |
|
Locations of Emissions
Associated with Bus and Minibus Termini, and Heavy Goods Vehicles and Coach
Parking Sites |
|
Contour Plot of 19th
Highest Cumulative Hourly NO2 Concentration (µg/m3) at 1.5 mAG during Interim Phase |
|
Contour Plot of
Cumulative Annual Averaged NO2 Concentration (µg/m3) at 1.5 mAG during Interim Phase |
|
Contour Plot of 10th
Highest Cumulative Daily RSP Concentration (µg/m3) at 1.5 mAG
during Interim Phase |
|
Contour Plot of
Cumulative Annual Averaged RSP Concentration (µg/m3) at 1.5 mAG during Interim Phase |
|
Contour Plot of 19th
Highest Cumulative Daily FSP Concentration (µg/m3) at 1.5 mAG
during Interim Phase |
|
Contour Plot of
Cumulative Annual Averaged FSP Concentration (µg/m3) at 1.5 mAG during Interim Phase |
|
Contour Plot of
Cumulative Annual Averaged NO2 Concentration (µg/m3) at 5 mAG during Interim Phase |
|
Contour Plot of
Cumulative Annual Averaged NO2 Concentration (µg/m3) at 10 mAG during Interim Phase |
|
Contour Plot of 19th
Highest Cumulative Hourly NO2 Concentration (µg/m3) at 1.5 mAG during Operation Phase |
|
Contour Plot of
Cumulative Annual Averaged NO2 Concentration (µg/m3) at 1.5 mAG during Operation Phase |
|
Contour Plot of 10th
Highest Cumulative Daily RSP Concentration (µg/m3) at 1.5 mAG
during Operation Phase |
|
Contour Plot of
Cumulative Annual Averaged RSP Concentration (µg/m3) at 1.5 mAG during Operation Phase |
|
Contour
Plot of 19th Highest Cumulative Daily FSP Concentration (µg/m3) at 1.5 mAG during Operation Phase |
|
Contour
Plot of Cumulative Annual Averaged FSP Concentration (µg/m3) at 1.5 mAG during Operation Phase |
|
Contour
Plot of Cumulative Annual Averaged NO2 Concentration (µg/m3) at 5 mAG during Operation Phase |
|
Contour
Plot of 10th Highest Cumulative Daily RSP Concentration (µg/m3) at 5 mAG during Operation Phase |
|
Contour
Plot of Cumulative Annual Averaged RSP Concentration (µg/m3) at 5 mAG during Operation Phase |
|
Contour
Plot of Cumulative Annual Averaged NO2 Concentration (µg/m3) at 10 mAG during Operation Phase |
|
Noise
Impact Assessment Area |
|
Locations
of Representative Noise Sensitive Receivers and Noise Assessment Points
(Construction Phase) |
|
Locations
of Representative Noise Sensitive Receivers and Noise Assessment Points
(Operation Phase) |
|
Locations
of Potential Concurrent Projects |
|
Extent
of Project Roads and Existing Roads |
|
Locations
of Existing and Committed Noise Mitigation Measures |
|
Extent
of Road Sections with HMFC |
|
Locations
of Proposed Traffic Noise Mitigation Measures |
|
Locations
of Proposed Traffic Noise Mitigation Measures |
|
Locations
of Proposed Traffic Noise Mitigation Measures |
|
Cross
Sections of Proposed Traffic Noise Mitigation Measures |
|
Locations
of Existing Noise Barriers to be Reprovisioned |
|
Water
Quality Sensitive Receiver |
|
Land
Contamination Assessment Area |
|
Recognised
Site of Conservation Importance within 500m Assessment Area |
|
Survey
Transects and Aquatic Sampling Locations |
|
Habitat
Map and Species of Conservation Importance recorded within 500m Assessment
Area |
|
Species
of Conservation Importance Recorded from Literature Review |
|
Project
Layout Plan |
|
Review of Planning and
Development Control Framework |
|
Review of Planning and
Development Control Framework |
|
Review of Planning and
Development Control Framework |
|
Review of Planning and
Development Control Framework |
|
Review of Planning and
Development Control Framework |
|
Review of Planning and
Development Control Framework |
|
Landscape Resources
(LRs) |
|
Landscape Resources
(LRs) |
|
Landscape Resources
(LRs) |
|
Landscape Resources
(LRs) |
|
Landscape Resources
(LRs) |
|
Landscape Resources
(LRs) |
|
Photographs of
Landscape Resources |
|
Photographs of
Landscape Resources |
|
Photographs of
Landscape Resources |
|
Photographs of
Landscape Resources |
|
Landscape Character
Areas (LCAs) |
|
Landscape Character
Areas (LCAs) |
|
Landscape Character
Areas (LCAs) |
|
Landscape Character
Areas (LCAs) |
|
Landscape Character
Areas (LCAs) |
|
Landscape Character
Areas (LCAs) |
|
Photographs of Landscape
Character Areas |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope |
|
Visual Envelope for
Future VSRs |
|
Visual Envelope for
Future VSRs |
|
Visual Envelope for
Future VSRs |
|
Visual Envelope for
Future VSRs |
|
Visual Envelope for
Future VSRs |
|
Photomontage VP1 |
|
Photomontage VP2 |
|
Photomontage VP3 |
|
Photomontage VP4 |
|
Photomontage VP5 |
|
Photomontage VP6 |
|
Photomontage VP7 |
|
Photomontage VP8 |
|
Landscape and Visual
Mitigation Plan |
|
Landscape and Visual
Mitigation Plan |
|
Landscape and Visual
Mitigation Plan |
|
Landscape and Visual
Mitigation Plan |
|
Locations of Potential
Concurrent Projects |
|
Areas of Archaeology
and Built Heritage |
|
Grave location Map
(Sheet 1 of 4) |
|
Grave location Map
(Sheet 2 of 4) |
|
Grave location Map
(Sheet 3 of 4) |
|
Grave location Map
(Sheet 4 of 4) |
Appendices
Tentative Construction Programme |
|
Traffic Forecast for Air Quality Impact Assessment |
|
EMFAC-HK Model Assumptions |
|
Summary of Vehicular Emission Factors of 18 Vehicle
Classes |
|
Summary of Composite Vehicular Emission Factors for
CALINE4 Model |
|
Determination of Surface Characteristics Parameters
for AERMET |
|
Emission Inventory for Portal Emissions |
|
Emission Inventory for Industrial Emissions |
|
Emission Inventory for Emissions Associated with Bus
and Minibus Termini, and Heavy Goods Vehicles and Coach Parking Sites |
|
Derivation of Cumulative Annual Average NOx to NO2
Conversion Equation using Jenkin Method |
|
Detailed Operation Phase Assessment Results |
|
Photographs of Existing Representative Noise
Sensitive Receivers |
|
Construction Plant Inventory (Unmitigated Scenario) |
|
Year 2028 and 2048 Peak Hour Traffic Forecast |
|
Detailed Results of Road Traffic Noise Assessment (Unmitigated Scenario) |
|
Construction Plant Inventory (Mitigated Scenario) |
|
Typical Configuration of Noise Barrier and Portable
Noise Enclosure |
|
Detailed Results of Road Traffic Noise Assessment |
|
Eligibility Assessment for Indirect Technical
Remedies |
|
Contamination Assessment Plan |
|
Flora Species recorded within Project Site and AA
and the Relative Abundance |
|
Fauna Species Recorded within Application Site and
AA and the Conservation Status |
|
Representative Photographs of Habitats within the
Project Site and AA |
|
Representative Photographs of Species of
Conservation Importance Recorded |
|
Broad-brush Tree Survey Report |
|
Description of Landscape Character Areas (LCAs) and
Existing Plantation |
|
Built Heritage Recording Sheet |
|
Aerial Photo |
|
Implementation Schedule of Recommended Mitigation
Measures |
|
Key Assessment Assumptions, Limitation of Assessment
Methodologies and related Agreement(s) with the
Director |