Contents
3.1 Legislation, Standards, and Guidelines
3.2 Description of the Environment
3.3 Representative Air Sensitive Receivers
Table 3.1 Current Hong Kong Air Quality Objectives (HKAQO)
Table 3.2 Concentration Limit for Emission from Cement Work 3
Table 3.3 Tunnel Air Quality Guidelines
Table 3.4 Air quality monitoring data (Tuen Mun AQMS, 2018-2022)
Table 3.5 Future background air quality for concerned PATH grids in Lam Tei Area
Table 3.6 Future background air quality for concerned PATH grids in Pillar Point
Area
Table 3.7 Future background air quality for concerned PATH grids in Sam Shing Area
Table 3.8 Representative ASRs for Air Quality Impact Assessment in Lam Tei Area
Table 3.9 Representative ASRs for Air Quality Impact Assessment in Pillar Point Area
Table 3.10 Representative ASRs for Air Quality Impact Assessment in Sam Shing Area
Table 3.11 Representative ASRs for Air Quality Impact Assessment in Siu Lam Area
Table 3.12 Concurrent Projects included in the Operational Air Quality Assessment
Table 3.13 Summary Results of Sensitivity Tests
Table 3.14 Summary of Wind Standard Deviation for Surface Roughness
Table 3.15 Example of Adjusted Height adopted in CALINE4 Models
Table 3.16 Model Parameters for CALINE4
Table 3.17 Discharge of Proposed TMB Portals and Ventilation Buildings
Table 3.18 Discharge of Proposed R11 Tunnel Portals and Ventilation Buildings
Table 3.19 Discharge of Existing Tuen Mun Chek Lap Kok Link Portals
Table 3.20 Latest Design Parameters of Ventilation Buildings 50
Table 3.21 Modelling Parameters in AERMOD
Table 3.22 Cumulative NO2, RSP and FSP Concentrations in Lam Tei Area
Table 3.23 Cumulative NO2, RSP and FSP Concentrations in Pillar Point
Area
Table 3.24 Cumulative NO2, RSP and FSP Concentrations in Sam Shing Area
Table 3.25
Contribution Breakdown of ASRs with Highest Annual NO2 Concentration
in Respective Areas
Figures
Figure 3.1a Locations of Concerned PATH Grids in
Lam Tei
Figure 3.1b Locations of Concerned PATH Grids in
Pillar Point
Figure 3.1c Locations of Concerned PATH Grids
in Sam Shing
Figure 3.2a Locations of Representative Air
Sensitive Receivers in Lam Tei during Construction Phase
Figure 3.2b Locations of Representative Air
Sensitive Receivers in Pillar Point during Construction Phase
Figure 3.2c Locations of Representative Air
Sensitive Receivers in Sam Shing during Construction Phase
Figure 3.2d Locations of Representative Air
Sensitive Receivers in Siu Lam during Construction Phase
Figure 3.3a Locations of Representative Air
Sensitive Receivers in Lam Tei during Operational Phase
Figure 3.3b Locations of Representative Air
Sensitive Receivers in Pillar Point during Operational Phase
Figure 3.3c Locations of Representative Air
Sensitive Receivers in Sam Shing during Operational Phase
Figure 3.4a Locations of PTIs and Heavy Goods Vehicle/Coach Parking in Lam Tei
Figure 3.4b Locations of Heavy Goods Vehicle/Coach Parking in Pillar Point
Figure 3.4c Locations of PTIs in Sam Shing
Figure 3.5a Locations of Chimney in Lam Tei
Figure 3.5b Locations of Chimney and Marine Facility in Pillar Point
Figure 3.6a Contours of Cumulative 19th highest
1-hour NO2 Concentration at 1.5m above Ground (Year 2048) in Lam Tei
Figure 3.6b Contours of Cumulative 19th highest
1-hour NO2 Concentration at 1.5m above Ground (Year 2048) in Pillar
Point
Figure 3.6c Contours of Cumulative 19th highest
1-hour NO2 Concentration at 1.5m above Ground (Year 2048) in Sam
Shing
Figure 3.7a Contours of Cumulative Annual NO2
Concentration at 1.5m above Ground (Year 2048) in Lam Tei
Figure 3.7b Contours of Cumulative Annual NO2
Concentration at 1.5m above Ground (Year 2048) in Pillar Point
Figure 3.7c Contours of Cumulative Annual NO2
Concentration at 5m above Ground (Year 2048) in Pillar Point
Figure 3.7d Contours of Cumulative Annual NO2
Concentration at 10m above Ground (Year 2048) in Pillar Point
Figure 3.7e Contours of Cumulative Annual NO2
Concentration at 1.5m above Ground (Year 2048) in Sam Shing
Figure 3.8a Contours of Cumulative 10th highest
24-hour RSP Concentration at 1.5m above Ground (Year 2048) in Lam Tei
Figure 3.8b Contours of Cumulative 10th highest
24-hour RSP Concentration at 1.5m above Ground (Year 2048) in Pillar Point
Figure 3.8c Contours of Cumulative 10th highest
24-hour RSP Concentration at 1.5m above Ground (Year 2048) in Sam Shing
Figure 3.9a Contours of Cumulative Annual RSP
Concentration at 1.5m above Ground (Year 2048) in Lam Tei
Figure 3.9b Contours of Cumulative Annual RSP
Concentration at 1.5m above Ground (Year 2048) in Pillar Point
Figure 3.9c Contours of Cumulative Annual RSP
Concentration at 1.5m above Ground (Year 2048) in Sam Shing
Figure 3.10a Contours of Cumulative 19th highest
24-hour FSP Concentration at 1.5m above Ground (Year 2048) in Lam Tei
Figure 3.10b Contours of Cumulative 19th highest
24-hour FSP Concentration at 1.5m above Ground (Year 2048) in Pillar Point
Figure 3.10c Contours of Cumulative 19th highest
24-hour FSP Concentration at 1.5m above Ground (Year 2048) in Sam Shing
Figure 3.11a Contours of Cumulative Annual FSP
Concentration at 1.5m above Ground (Year 2048) in Lam Tei
Figure 3.11b Contours of Cumulative Annual FSP
Concentration at 1.5m above Ground (Year 2048) in Pillar Point
Figure 3.11c Contours of Cumulative Annual FSP
Concentration at 1.5m above Ground (Year 2048) in Sam Shing
Appendices
Appendix
3.1 Tentative
Location of Key Construction Activities and Air Sensitive Uses
Appendix
3.2 Traffic
Department Endorsement on Traffic Data
Appendix
3.3 Traffic
Forecast in Year 2033, Year 2036, Year 2041, Year 2046 and Year 2048
Appendix
3.4 Estimation
of Trips for Roads with Start Emission in Year 2033, Year 2036, Year 2041, Year
2046 and Year 2048
Appendix
3.5 Hourly
Composite Vehicular Emission Factor in Year 2033, Year 2036, Year 2041, Year
2046 and Year 2048
Appendix
3.6 Emission
Inventory and Source Locations for Portal and Ventilation Building in Year 2048
Appendix
3.7 Emission
Inventory and Source Locations for PTIs and Heavy Goods Vehicle/Coach Parking
Appendix
3.8 Emission
Inventory and Source Locations for Industrial Emissions
Appendix
3.9 Marine
Department’s Reply on Marine Traffic Data
Appendix
3.10a Emission
Inventory and Source Locations for Marine Emission at River Trade Terminal in
Year 2048
Appendix
3.10b Emission Inventory and
Source Locations for Marine Emission at Chu Kong Shipping Terminal in Year 2048
Appendix
3.10c Emission Inventory and
Source Locations for Marine Emission at Landing Area 40 in Year 2048
Appendix
3.11 Removal of Emission for PATH rerun in Year 2030
Appendix
3.12 Jenkin
Method for Annual NOx to NO2 Conversion
Appendix
3.13 Detailed Operational Air Quality Assessment Results
No table of contents entries found.
· Criteria and guidelines for evaluating and assessing air quality impact as specified in Section 1 of Annexes 4 and 12 of the Technical Memorandum on Environmental Impact Assessment Process (EIAO-TM);
· Air Pollution Control Ordinance (APCO) (Cap. 311);
· Air Pollution Control (Construction Dust) Regulation (Cap. 311R);
· Air Pollution Control (Non-road Mobile Machinery) (Emission) Regulation (Cap 311Z);
· Air Pollution Control (Fuel Restriction) Regulation (Cap 311I);
· Air Pollution Control (Specified Processes) Regulations (Cap 311F);
· Guidance Note on the Best Practicable Means for Cement Works (Concrete Batching Plant) BPM 3/2 (16);
· Development Bureau Technical Circular (Works) No. 13/2020 Timely Application of Temporary Electricity and Water Supply for Public Works Contracts and Wider Use of Electric Vehicles in Public Works Contracts; and
· Practice Note on Control of Air Pollution in Vehicle Tunnels
Table 3.1 Current Hong Kong Air Quality Objectives (HKAQO)
Pollutants |
Limits on Concentration, µg/m3 [1] (The Number
of Exceedance per calendar year allowed is shown in brackets) |
||||
10-min |
1-hr |
8-hr |
24-hr |
Annual |
|
SO2 |
500 (3) |
|
|
50 (3) |
|
RSP (PM10) [2] |
|
|
|
100 (9) |
50 |
FSP (PM2.5) [3] |
|
|
|
50 (35/18) [4] |
25 |
CO |
|
30,000 (0) |
10,000 (0) |
|
|
NO2 |
|
200 (18) |
|
|
40 |
O3 |
|
|
160 (9) |
|
|
Pb |
|
|
|
|
0.5 |
Notes:
[1] All measurements of the concentration of gaseous air pollutants, i.e., sulphur dioxide, nitrogen dioxide, ozone and carbon monoxide, are to be adjusted to a reference temperature of 293 Kelvin and a reference pressure of 101.325 kilopascal.
[2] Respirable suspended particulates (RSP) means suspended particles in air with a nominal aerodynamic diameter of 10 μm or less (i.e. PM10).
[3] Fine suspended particulates (FSP) means suspended particles in air with a nominal aerodynamic diameter of 2.5 μm or less (i.e. PM2.5).
[4] On a best endeavour basis, a more stringent standard of 24-hour AQO for FSP at concentration level of 50 μg/m3 is adopted by setting the number of allowable exceedances to be 18 days per calendar year as the benchmark for conducting air quality impact assessments.
Table 3.2 Concentration Limit for Emission from Cement Work
Pollutant |
Concentration Limit (mg/m3) [1] |
Particulate
matter |
10 |
Note:
[1] The air pollutant concentration is expressed at reference conditions of 0oC temperature, 101.325 kPa pressure, and without correction for water vapour content. Introduction of diluted air to achieve the emission concentration limit shall not be permitted.
Table 3.3 Tunnel Air Quality Guidelines
Pollutant |
Average Time |
Maximum Concentration |
|
µg/m3 [1] |
ppm |
||
CO |
5
minutes |
115,000 |
100 |
NO2 |
5
minutes |
1,800 |
1 |
SO2 |
5
minutes |
1,000 |
0.4 |
Note:
[1] Expressed at the reference condition of 298K and 101.325 kPa.
Table 3.4 Air quality monitoring data (Tuen Mun AQMS, 2018-2022)
Pollutant |
Parameter |
Concentrations (μg/m3) [1] |
AQO (μg/m3)
[2] |
|||||
2018 |
2019 |
2020 |
2021 |
2022 |
5-year Mean [2] |
|||
SO2 |
4th highest 10-minute |
94 |
45 |
98 |
22 |
29 |
58 [12%] |
500 (3) |
4th highest
24-hour |
20 |
12 |
10 |
9 |
11 |
12 [25%] |
50 (3) |
|
NO2 |
19th highest
1-hour |
177 |
166 |
166 |
172 |
128 |
162 [81%] |
200 (18) |
Annual |
47 |
47 |
40 |
44 |
39 |
43 [109%] |
40 |
|
CO |
Max. 1-hour |
1,900 |
2,050 |
1,650 |
1,720 |
1,480 |
1,760 [6%] |
30,000 |
Max. 8- hour |
1,666 |
1,758 |
1,513 |
1,450 |
1,345 |
1,546 [15%] |
10,000 |
|
O3 |
10th highest 8-hour |
173 |
203 |
166 |
161 |
195 |
180 [112%] |
160 (9) |
RSP |
10th highest 24-hour |
87 |
89 |
84 |
87 |
65 |
82 [82%] |
100 (9) |
Annual |
42 |
41 |
34 |
36 |
32 |
37 [74%] |
50 |
|
FSP |
19th highest 24-hour |
47 |
46 |
41 |
42 |
39 |
43 [86%] |
50 (18) |
Annual |
26 |
24 |
20 |
19 |
18 |
21 [86%] |
25 |
Notes:
[1] Monitoring results exceeding the AQO are in bold.
[2] The 5-year mean is the average of the five yearly
concentrations. Percentage of the 5-year mean concentration to AQO is shown in
[ ]. Number of exceedance allowed under the AQO is shown in ( ).
Table 3.5 Future background air quality for concerned PATH grids in Lam Tei Area
Pollutant |
Parameter |
Concentrations (μg/m3) |
||||||
21_43 |
21_44 |
21_45 |
22_43 |
22_44 |
22_45 |
AQO [1] |
||
NO2 |
19th highest
1-hour |
91 |
91 |
93 |
87 |
90 |
89 |
200 (18) |
Annual |
18 |
19 |
18 |
15 |
17 |
17 |
40 |
|
RSP |
10th highest
24-hour |
69 |
71 |
73 |
68 |
69 |
71 |
100 (9) |
Annual |
27 |
27 |
27 |
27 |
27 |
27 |
50 |
|
FSP |
19th highest
24-hour |
36 |
37 |
38 |
37 |
37 |
37 |
50 (18) |
Annual |
15 |
15 |
16 |
15 |
15 |
15 |
25 |
Note:
[1] Number of exceedance allowed under the AQO is shown in ( ).
Table 3.6 Future background air quality for concerned PATH grids in Pillar Point Area
Pollutant |
Parameter |
Concentrations
(μg/m3) |
||||
16_39 |
17_38 |
17_39 |
18_39 |
AQO [1] |
||
NO2 |
19th highest 1-hour |
104 |
116 |
102 |
105 |
200 (18) |
Annual |
30 |
37 |
29 |
29 |
40 |
|
RSP |
10th
highest 24-hour |
69 |
71 |
69 |
69 |
100 (9) |
Annual |
28 |
29 |
28 |
28 |
50 |
|
FSP |
19th
highest 24-hour |
38 |
39 |
39 |
39 |
50 (18) |
Annual |
15 |
16 |
16 |
16 |
25 |
Note:
[1] Number of exceedance allowed under the AQO is shown in ( ).
Table 3.7 Future background air quality for concerned PATH grids in Sam Shing Area
Pollutant |
Parameter |
Concentrations
(μg/m3) |
||||
20_40 |
20_41 |
21_40 |
21_41 |
AQO [1] |
||
NO2 |
19th highest 1-hour |
99 |
94 |
89 |
88 |
200 (18) |
Annual |
24 |
22 |
21 |
17 |
40 |
|
RSP |
10th
highest 24-hour |
69 |
71 |
69 |
68 |
100 (9) |
Annual |
27 |
28 |
27 |
27 |
50 |
|
FSP |
19th
highest 24-hour |
39 |
39 |
38 |
37 |
50 (18) |
Annual |
15 |
16 |
15 |
15 |
25 |
Note:
[1] Number of exceedance allowed under the AQO is shown in ( )
ASRs in Lam Tei |
· Residential developments (e.g. The Sherwood, Botania Villa, GreenView and Fu Tai Estate), village houses (e.g. Nai Wai, Tsoi Yuen Tsuen, Fuk Hang Tsuen, Wo Ping San Tsuen and Fu Tei Ha Tsuen), recreational facilities (e.g. Fuk Hang Playground and Lam Tei Basketball Court), school (e.g. Madam Lau Kam Lung Secondary School Of Miu Fat Buddhist Monastery), as well as temples (e.g. Miu Fat Buddhist Monastery and Tin Hau Temple) |
ASRs in Pillar Point |
·
Government,
institution and community facilities (e.g.
Pillar Point Fire Station, Customs and Excise Department Harbour and
River Trade Division, EMSD Vehicle Servicing Station, Administration Building
of Pillar Point Sewage Treatment Works, Administration Building, Maintenance
Depot Office and Kiosk of Tuen Mun - Chek Lap Kok Link, etc.), and various
industrial premises and warehouses (e.g. sawmills, metal recycle or vehicle
repairing workshops, Chu Kong warehouses, Sun Hing Logistics Centre, and
Butterfly Beach Park etc. along Ho Yeung Street) |
ASRs in Sam Shing |
·
Residential developments (e.g. Kam Fai Garden, Harvest
Garden, Hoi Tak Garden, Alpine Garden and Dragon Inn Court), schools (e.g. CSBS Mrs. Aw Boon Haw Secondary School
and Semple Memorial Secondary School), government, institution and community
facilities (e.g. Caritas Li Ka Shing Care And Attention Home and Tuen Mun Siu
Lun Government Complex), as well as recreational facilities (e.g. Tsing Sin
Playground and Wah Fat Playground) |
· Lam Tei and Yick Yuen Outline Zoning Plan (OZP) (No. S/TM – LTYY/12);
· Hung Shui Kiu and Ha Tsuen OZP (No. S/HSK/2);
· Tuen Mun OZP (No. S/TM/37);
· Tong Yan San Tsuen OZP (No. S/YL – TYST/14);
· Planning Applications under of S.16 / S.12a Town Planning Ordinance; and
· Land Sale Programme published by the Lands Department.
Table 3.8 Representative ASRs for Air Quality Impact Assessment in Lam Tei Area
Location |
Land |
Base Elevation (mPD) |
Building Height [3] [4] (mAG) |
Lowest Assessment Height [3] (mAG) |
Highest Assessment Height [3] [5] (mAG) |
Intake Year [6] |
Approx. distance from Project during Construction
Phase [7] (m) |
Approx. distance from Project during Operational
Phase [7] (m) |
Operation/ Construction Phase ASR |
|
Existing ASRs |
||||||||||
A001 |
Wo Ping San Tsuen House
198 |
Res |
13.7 |
10 |
1.5 |
10 |
- |
1250 |
1250 |
Both |
A002 |
Wo Ping San Tsuen Village
House |
Res |
18.2 |
10 |
1.5 |
10 |
- |
1210 |
1210 |
Both |
A003 |
Wo Ping San Tsuen Village
House |
Res |
18.2 |
10 |
1.5 |
10 |
- |
1200 |
1200 |
Both |
A004 |
Wo Ping San Tsuen House
145 |
Res |
16.4 |
10 |
1.5 |
10 |
- |
1130 |
1130 |
Both |
A008 |
Tsoi Yuen Tsuen House 283 |
Res |
18.8 |
10 |
1.5 |
10 |
- |
850 |
850 |
Both |
A009 |
Tsoi Yuen Tsuen House 282 |
Res |
18.1 |
10 |
1.5 |
10 |
- |
800 |
820 |
Both |
A010 |
Tsoi Yuen Tsuen House 74 |
Res |
17.9 |
10 |
1.5 |
10 |
- |
770 |
790 |
Both |
A011 |
Fuk Hang Tsuen House 152 |
Res |
17.8 |
10 |
1.5 |
10 |
- |
720 |
740 |
Both |
A012 |
Tsoi Yuen Tsuen Village
House |
Res |
17.3 |
10 |
1.5 |
10 |
- |
700 |
720 |
Both |
A013 |
Tsoi Yuen Tsuen House 159 |
Res |
15.2 |
10 |
1.5 |
10 |
- |
690 |
710 |
Both |
A014 |
Tsoi Yuen Tsuen Village
House |
Res |
15.7 |
10 |
1.5 |
10 |
- |
690 |
710 |
Both |
A015 |
Tsoi Yuen Tsuen House 166 |
Res |
13.8 |
10 |
1.5 |
10 |
- |
680 |
710 |
Both |
A016 |
Tsoi Yuen Tsuen House 189 |
Res |
13.3 |
10 |
1.5 |
10 |
- |
700 |
720 |
Both |
A017 |
Tsoi Yuen Tsuen Village
House |
Res |
12.2 |
10 |
1.5 |
10 |
- |
700 |
730 |
Both |
A020 |
Nai Wai House 332 |
Res |
11.9 |
10 |
1.5 |
10 |
- |
930 |
960 |
Both |
A021 |
Nai Wai Village House |
Res |
10.4 |
10 |
1.5 |
10 |
- |
1030 |
1060 |
Both |
A022 |
Nai Wai House 248 |
Res |
11.3 |
10 |
1.5 |
10 |
- |
1080 |
1110 |
Both |
A023 |
Nai Wai Village House |
Res |
10.5 |
10 |
1.5 |
10 |
- |
1110 |
1140 |
Both |
A024 |
Yorks Field Garden |
Res |
14.8 |
10 |
1.5 |
10 |
- |
1210 |
1230 |
Both |
A025 |
Tsoi Yuen Tsuen House 211A |
Res |
12.8 |
10 |
1.5 |
10 |
- |
970 |
990 |
Both |
A026 |
Nai Wai Temple |
Wor |
12.3 |
10 |
1.5 |
10 |
- |
1100 |
1120 |
Both |
A027 |
Nai Wai House 158 |
Res |
12.3 |
10 |
1.5 |
10 |
- |
1070 |
1090 |
Both |
A028 |
Belrose Place Block A |
Res |
10.7 |
10 |
1.5 |
10 |
- |
1160 |
1190 |
Both |
A029 |
Tsing Yick Road Village
House |
Res |
8.9 |
10 |
1.5 |
10 |
- |
1250 |
1280 |
Both |
A030 |
Tsing Yick Road Village
House |
Res |
8.7 |
10 |
1.5 |
10 |
- |
1260 |
1290 |
Both |
A031 |
Lam Tei Pet Garden |
Rec |
9.7 |
N/A |
1.5 |
1.5 |
- |
1070 |
1100 |
Both |
A032 |
Fuk Hang Playground
Basketball Court |
Rec |
9.1 |
N/A |
1.5 |
1.5 |
- |
1060 |
1090 |
Both |
A033 |
Fuk Hang Tsuen Road House
2 |
Res |
10 |
10 |
1.5 |
10 |
- |
1020 |
1050 |
Both |
A034 |
Fuk Hang Tsuen Road House
11 |
Res |
10.5 |
10 |
1.5 |
10 |
- |
970 |
1000 |
Both |
A035 |
Fuk Hang Tsuen Road Garden |
Rec |
10.4 |
N/A |
1.5 |
1.5 |
- |
950 |
980 |
Both |
A036 |
Fuk Hang Tsuen Road House
18 |
Res |
10.9 |
10 |
1.5 |
10 |
- |
900 |
930 |
Both |
A037 |
Fortress Garden Block 8 |
Res |
9 |
10 |
1.5 |
10 |
- |
1210 |
1240 |
Both |
A038 |
Tuen Tsz Wai Village House |
Res |
8 |
10 |
1.5 |
10 |
- |
1120 |
1150 |
Both |
A039 |
Tuen Tsz Wai House 565 |
Res |
8.7 |
10 |
1.5 |
10 |
- |
1100 |
1130 |
Both |
A040 |
Farmer Restaurant |
Com |
8.7 |
15 |
1.5 |
15 |
- |
1050 |
1080 |
Both |
A041 |
Miu Fat Buddhist Monastery
Ksitigarbha Hall |
Wor |
10.5 |
5 |
1.5 |
5 |
- |
980 |
1010 |
Both |
A042 |
Miu Fat Buddhist Monastery |
Wor |
8.5 |
35 |
1.5 |
50 |
- |
1000 |
1030 |
Both |
A043 |
Madam Lau Kam Lung
Secondary School of Miu Fat Buddhist Monastery |
Edu |
9.1 |
25 |
1.5 |
30 |
- |
970 |
1000 |
Both |
A044 |
Miu Fat Buddhist Monastery
Elderly Home |
Res |
10.9 |
25 |
1.5 |
30 |
- |
950 |
980 |
Both |
A045 |
Temple at Lam Tei |
Wor |
10.4 |
5 |
1.5 |
1.5 |
- |
940 |
970 |
Both |
A046 |
Lam Tei House 20 |
Res |
10.1 |
10 |
1.5 |
10 |
- |
900 |
930 |
Both |
A047 |
The Sherwood Block 1 |
Res |
11.1 |
50 |
1.5 |
50 |
- |
940 |
970 |
Both |
A048 |
The Sherwood Block 2 |
Res |
11.1 |
50 |
1.5 |
50 |
- |
920 |
950 |
Both |
A049 |
The Sherwood Block 3 |
Res |
11.1 |
50 |
1.5 |
50 |
- |
900 |
930 |
Both |
A050 |
The Sherwood Block 4 |
Res |
11.1 |
50 |
1.5 |
50 |
- |
890 |
920 |
Both |
A051 |
The Sherwood Block 5 |
Res |
11.1 |
50 |
1.5 |
50 |
- |
870 |
900 |
Both |
A052 |
The Sherwood Podium |
Com |
11.4 |
5 |
1.5 |
5 |
- |
830 |
860 |
Both |
A053 |
The Sherwood Block 13 |
Res |
11.4 |
45 |
1.5 |
50 |
- |
800 |
830 |
Both |
A054 |
The Sherwood Block 12 |
Res |
11.4 |
45 |
1.5 |
50 |
- |
770 |
800 |
Both |
A055 |
The Sherwood Block 11 |
Res |
11.4 |
45 |
1.5 |
50 |
- |
750 |
780 |
Both |
A056 |
The Sherwood Block 10 |
Res |
11.4 |
45 |
1.5 |
50 |
- |
720 |
750 |
Both |
A057 |
The Sherwood Block 9 |
Res |
11.4 |
45 |
1.5 |
50 |
- |
700 |
730 |
Both |
A058 |
Lam Tei Main Street House
88 |
Res |
13 |
10 |
1.5 |
10 |
- |
790 |
820 |
Both |
A059 |
Tuen Mun San Tsuen House
110 |
Res |
11.9 |
10 |
1.5 |
10 |
- |
710 |
740 |
Both |
A060 |
Store at Lam Tei Main
Street House 128 |
Com |
14.5 |
10 |
1.5 |
10 |
- |
650 |
680 |
Both |
A061 |
Botania Villa Block 1 |
Res |
11.5 |
45 |
1.5 |
50 |
- |
670 |
700 |
Both |
A062 |
Botania Villa Podium |
Rec |
11.5 |
5 |
1.5 |
5 |
- |
640 |
670 |
Both |
A063 |
Botania Villa Block 10 |
Res |
11.5 |
45 |
1.5 |
50 |
- |
610 |
640 |
Both |
A064 |
GreenView Podium |
Rec |
15 |
5 |
1.5 |
5 |
- |
600 |
630 |
Both |
A065 |
GreenView |
Res |
15 |
45 |
1.5 |
50 |
- |
580 |
610 |
Both |
A066 |
Botania Villa Block 9 |
Res |
11.5 |
45 |
1.5 |
50 |
- |
560 |
590 |
Both |
A067 |
Fuk Hang Tsuen House 12 |
Res |
13.3 |
10 |
1.5 |
10 |
- |
620 |
650 |
Both |
A068 |
The Church of Christian Faith
Lam Tei Gospel Church |
Wor |
14.9 |
5 |
1.5 |
5 |
- |
600 |
630 |
Both |
A069 |
Property Agency at Fuk
Hang Tsuen Road |
Res |
14.1 |
5 |
1.5 |
1.5 |
- |
630 |
660 |
Both |
A070 |
Fuk Hang Tsuen House 25 |
Res |
14.4 |
10 |
1.5 |
10 |
- |
540 |
570 |
Both |
A071 |
Fuk Hang Tsuen House 458 |
Res |
14.1 |
10 |
1.5 |
10 |
- |
520 |
540 |
Both |
A072 |
Fuk Hang Tsuen Village
House |
Res |
19.3 |
10 |
1.5 |
10 |
- |
510 |
530 |
Both |
A073 |
Fuk Hang Tsuen Village
House |
Res |
19.6 |
10 |
1.5 |
10 |
- |
480 |
500 |
Both |
A074 |
Fuk Hang Tsuen Village
House |
Res |
15.7 |
10 |
1.5 |
10 |
- |
470 |
490 |
Both |
A075 |
Fuk Hang Tsuen Village
House |
Res |
16 |
10 |
1.5 |
10 |
- |
440 |
470 |
Both |
A076 |
Fuk Hang Tsuen Houses
59-61 |
Res |
17.1 |
10 |
1.5 |
10 |
- |
430 |
460 |
Both |
A077 |
Church of Christian Faith
Lam Tei Gospel Church |
Wor |
17.8 |
10 |
1.5 |
10 |
- |
440 |
470 |
Both |
A078 |
Fuk Hang Tsuen Village
House |
Res |
17.1 |
10 |
1.5 |
10 |
- |
440 |
470 |
Both |
A079 |
Tin Hau Temple at Fuk Hang
Tsuen Road |
Wor |
17.3 |
5 |
1.5 |
1.5 |
- |
410 |
440 |
Both |
A080 |
Tuen Mun Heung Fuk Hang
Tsuen Village Office |
GIC |
17.3 |
10 |
1.5 |
10 |
- |
410 |
440 |
Both |
A081 |
Lam Tei Fa Pao Association |
GIC |
12 |
5 |
1.5 |
1.5 |
- |
470 |
500 |
Both |
A082 |
Fuk Hang Tsuen House 130 |
Res |
11.6 |
10 |
1.5 |
10 |
- |
410 |
440 |
Both |
A083 |
Fuk Hang Tsuen Village
House |
Res |
10.9 |
10 |
1.5 |
10 |
- |
450 |
480 |
Both |
A084 |
Fuk Hang Tsuen Village
House |
Res |
9 |
10 |
1.5 |
10 |
- |
500 |
530 |
Both |
A085 |
To Yuen Wai House 160 |
Res |
8.5 |
10 |
1.5 |
10 |
- |
570 |
600 |
Both |
A086 |
To Yuen Wai House 85 |
Res |
9.9 |
10 |
1.5 |
10 |
- |
700 |
N/A |
Construction [8] |
A087 |
Tan Kwai Tsuen Village
House |
Res |
21.4 |
10 |
1.5 |
10 |
- |
1160 |
1160 |
Both |
A088 |
Tung Fuk Road Village
House |
Res |
25.7 |
10 |
1.5 |
10 |
- |
1020 |
1020 |
Both |
A089 |
Tung Fuk Road Village
House |
Res |
30.8 |
10 |
1.5 |
10 |
- |
990 |
990 |
Both |
A090 |
Tung Fuk Road Village
House |
Res |
26.8 |
10 |
1.5 |
10 |
- |
930 |
930 |
Both |
A091 |
Tung Fuk Road Village
House |
Res |
26.2 |
10 |
1.5 |
10 |
- |
860 |
860 |
Both |
A092 |
Tung Fuk Road Village
House |
Res |
28.1 |
10 |
1.5 |
10 |
- |
790 |
790 |
Both |
A093 |
Tung Fuk Road Village
House |
Res |
25.6 |
10 |
1.5 |
10 |
- |
740 |
740 |
Both |
A094 |
Fuk Hang Tsuen House 178 |
Res |
29.3 |
10 |
1.5 |
10 |
- |
630 |
630 |
Both |
A095 |
Fuk Hang Tsuen Village
House |
Res |
26.4 |
10 |
1.5 |
10 |
- |
600 |
600 |
Both |
A096 |
Fuk Hang Tsuen Village
House |
Res |
32.1 |
10 |
1.5 |
10 |
- |
670 |
670 |
Both |
A097 |
Tin Hau Temple at Fuk Hang
Tsuen Path |
Wor |
29.6 |
5 |
1.5 |
1.5 |
- |
610 |
610 |
Both |
A098 |
Fuk Hang Tsuen Village
House |
Res |
32.9 |
10 |
1.5 |
10 |
- |
550 |
550 |
Both |
A099 |
Fuk Hang Tsuen Village
House |
Res |
30 |
10 |
1.5 |
10 |
- |
440 |
440 |
Both |
A100 |
Chui Fuk Road Village
House |
Res |
19.2 |
10 |
1.5 |
10 |
- |
200 |
220 |
Both |
A101 |
Chui Fuk Road Village
House |
Res |
23.5 |
10 |
1.5 |
10 |
- |
160 |
180 |
Both |
A102 |
Chui Fuk Road Village
House |
Res |
29 |
10 |
1.5 |
10 |
- |
120 |
130 |
Both |
A103 |
Fu Fuk Road Village House |
Res |
16.7 |
10 |
1.5 |
10 |
- |
160 |
180 |
Both |
A104 |
Fu Tei Ha Tsuen Village
House |
Res |
17.3 |
10 |
1.5 |
10 |
- |
240 |
270 |
Both |
A105 |
Fu Tei Ha Tsuen Village
House |
Res |
17.7 |
10 |
1.5 |
10 |
- |
280 |
310 |
Both |
A106 |
Fu Tei Ha Tsuen Village
House |
Res |
9.1 |
10 |
1.5 |
10 |
- |
330 |
360 |
Both |
A107 |
Fu Tei Ha Tsuen Village
House |
Res |
7.6 |
10 |
1.5 |
10 |
- |
490 |
510 |
Both |
A108 |
Fu Tei Ha Tsuen Village
House |
Res |
7.1 |
10 |
1.5 |
10 |
- |
550 |
580 |
Both |
A109 |
Fu Tei Ha Tsuen House 52 |
Res |
7.3 |
10 |
1.5 |
10 |
- |
670 |
N/A |
Construction [8] |
A110 |
Fu Tei Ha Tsuen Village
House |
Res |
18.3 |
10 |
1.5 |
10 |
- |
100 |
120 |
Both |
A111 |
Sin Fat Hang Yuen Temple |
Wor |
27.5 |
5 |
1.5 |
1.5 |
- |
160 |
190 |
Both |
A112 |
Nam On Buddhist Monastery |
Wor |
18.5 |
5 |
1.5 |
1.5 |
- |
170 |
190 |
Both |
A113 |
Fu Tei Ha Tsuen Village
House |
Res |
20.5 |
10 |
1.5 |
10 |
- |
250 |
270 |
Both |
A114 |
Fu Tei Ha Tsuen Village
House |
Res |
14.9 |
10 |
1.5 |
10 |
- |
250 |
280 |
Both |
A115 |
Fu Tei Ha Tsuen Village
House |
Res |
12.4 |
10 |
1.5 |
10 |
- |
350 |
380 |
Both |
A116 |
Fu Tai Estate - Ning Tai
House |
Res |
15 |
120 |
1.5 |
120 |
- |
480 |
500 |
Both |
A117 |
Fu Tai Estate - Yat Tai
House |
Res |
12 |
120 |
1.5 |
120 |
- |
530 |
550 |
Both |
A118 |
Fu Tai Estate - Yan Tai
House |
Res |
13 |
120 |
1.5 |
120 |
- |
560 |
N/A |
Construction [8] |
A119 |
Fu Tai Estate - Oi Tai
House |
Res |
11 |
115 |
1.5 |
120 |
- |
610 |
N/A |
Construction [8] |
Planned/Committed
ASRs |
||||||||||
P001 |
Proposed Public Housing at Ping Shan South and Podium
with potential non-domestic facilities [7] |
Res/ GIC/ Com |
13 |
170 |
1.5 |
180 |
N/A |
1380 |
1380 |
Both |
P002a |
Proposed Public Housing at
Lam Tei North and Podium with potential non-domestic facilities |
Res/ GIC/ Com |
19 |
160 |
1.5 |
180 |
N/A |
1020 |
1020 |
Both |
P002b |
Proposed Public Housing at
Lam Tei North and Podium with potential non-domestic facilities |
Res/ GIC/ Com |
19 |
160 |
1.5 |
180 |
N/A |
990 |
990 |
Both |
P002c |
Podium with potential
non-domestic facilities for Proposed Public Housing at Lam Tei North |
GIC/ Com |
19 |
15 |
1.5 |
15 |
N/A |
980 |
980 |
Both |
P003a |
Proposed Public Housing at
Lam Tei North and Podium with potential non-domestic facilities |
Res/ GIC/ Com |
18 |
160 |
1.5 |
180 |
N/A |
920 |
940 |
Both |
P003b |
Proposed Public Housing at
Lam Tei North and Podium with potential non-domestic facilities |
Res/ GIC/ Com |
18 |
160 |
1.5 |
180 |
N/A |
970 |
990 |
Both |
P003c |
Proposed Public Housing at
Lam Tei North and Podium with potential non-domestic facilities |
Res/ GIC/ Com |
18 |
160 |
1.5 |
180 |
N/A |
1000 |
1010 |
Both |
P004a |
Proposed Public Housing at
Lam Tei North and Podium with potential non-domestic facilities |
Res/ GIC/ Com |
20 |
160 |
1.5 |
180 |
N/A |
890 |
900 |
Both |
P004b |
Proposed Public Housing at
Lam Tei North and Podium with potential non-domestic facilities |
Res/ GIC/ Com |
20 |
160 |
1.5 |
180 |
N/A |
940 |
950 |
Both |
P005a |
Proposed Public Housing at
Lam Tei North |
Res |
20 |
160 |
1.5 |
180 |
N/A |
910 |
910 |
Both |
P005b |
Proposed Public Housing at
Lam Tei North |
Res |
20 |
160 |
1.5 |
180 |
N/A |
890 |
890 |
Both |
P006 |
Proposed Temporary Place
of Recreation, Sports or Culture (Indoor Recreation Centre) |
Rec |
17 |
5 |
1.5 |
1.5 |
N/A |
800 |
810 |
Both |
P007a |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
13 |
180 |
1.5 |
180 |
N/A |
790 |
820 |
Both |
P007b |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
13 |
180 |
1.5 |
180 |
N/A |
820 |
850 |
Both |
P008a |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
12 |
180 |
1.5 |
180 |
N/A |
740 |
770 |
Both |
P008b |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
12 |
180 |
1.5 |
180 |
N/A |
790 |
820 |
Both |
P008c |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
12 |
180 |
1.5 |
180 |
N/A |
810 |
830 |
Both |
P008d |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
12 |
180 |
1.5 |
180 |
N/A |
770 |
800 |
Both |
P009a |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
10 |
180 |
1.5 |
180 |
N/A |
810 |
830 |
Both |
P009b |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
10 |
180 |
10 |
180 |
N/A |
840 |
860 |
Both |
P010 |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
12 |
180 |
10 |
180 |
N/A |
860 |
890 |
Both |
P011 |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
10 |
180 |
1.5 |
180 |
N/A |
910 |
940 |
Both |
P012a |
Proposed Public Housing at
Nai Wai and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
10 |
180 |
1.5 |
180 |
N/A |
990 |
1020 |
Both |
P012b |
Proposed
Public Housing at Nai Wai
and Podium with potential non-domestic facilities [6] |
Res/ GIC/ Com |
10 |
180 |
1.5 |
180 |
N/A |
1050 |
1070 |
Both |
P013a |
Planned Public Housing in Hung
Shui Kiu/Ha Tsuen New Development Area and Podium with Retail Use |
Res/ Com |
11 |
160 |
1.5 |
180 |
2030 |
1280 |
1310 |
Both |
P014 |
Proposed Development of
Elderly Home by Pok Oi Hospital |
Res |
12.8 |
60 |
1.5 |
80 |
2026 |
810 |
840 |
Both |
P015 |
Proposed Development of
Elderly Home by Pok Oi Hospital |
Res |
13.4 |
60 |
1.5 |
80 |
2026 |
740 |
770 |
Both |
P016 |
Proposed Development of
Elderly Home by Pok Oi Hospital |
Res |
13 |
60 |
1.5 |
80 |
2026 |
670 |
700 |
Both |
P017 |
Proposed Comprehensive Development
Area in Lot 2883 in D.D. 130 |
Res |
14.5 |
15 |
1.5 |
15 |
N/A |
560 |
590 |
Both |
P018 |
Proposed Comprehensive
Development in D.D. 130 and Adjoining Government Land |
Res |
16.5 |
40 |
1.5 |
50 |
N/A |
500 |
530 |
Both |
P019 |
Proposed Comprehensive Development
in D.D. 130 and Adjoining Government Land |
Res |
17.3 |
40 |
1.5 |
50 |
N/A |
430 |
460 |
Both |
P020 |
Proposed Comprehensive
Development in D.D. 130 and Adjoining Government Land |
Res |
18.5 |
40 |
1.5 |
50 |
N/A |
380 |
410 |
Both |
P021 |
Proposed Comprehensive
Development in D.D. 130 and Adjoining Government Land |
Res |
19.5 |
40 |
1.5 |
50 |
N/A |
400 |
430 |
Both |
P022 |
Proposed Comprehensive
Development in D.D. 130 and Adjoining Government Land |
Res |
20.6 |
40 |
1.5 |
50 |
N/A |
370 |
390 |
Both |
P025 |
Temporary Place of
Recreation, Sports or Culture (Sports Training Ground) |
Rec |
30.3 |
15 |
1.5 |
15 |
N/A |
480 |
480 |
Both |
Notes:
[1] ASR ID A005 to A007, A018, A019, P023 and P024 are not used.
[2] Com – Commercial; Edu – Education; GIC – Government, Institution
and Community; Hos – Hospital/Clinic; Off – Office; Rec – Park/ Recreational;
Res – Residential; and Wor – Worship.
[3] ASR location, height, the lowest and highest floor with air
sensitive use (i.e. lowest and highest assessment heights) are determined based
on site survey, building plan and latest layout plan, where available and
applicable. For all planned ASRs, the lowest assessment height is assumed to be
1.5m, except those ASRs located above planned PTIs.
[4] Building heights are rounded up to the nearest 5m. Height of
village houses are assumed to be 10m, which is the common height of a typical
3-storey village house.
[5] The assessment heights are set at 10 levels (1.5, 5, 10, 15, 20,
30, 50, 80, 120 and 180 mAG) (see details in Table 3.21). The
highest assessment height of each ASR has covered the top level of the
building, e.g. for P021, the building height is 40m, the highest assessment
height is up to 50m.
[6] Population intake years are only presented for committed/planned
ASRs. For those without confirmed population intake programme, it is indicated
as N/A in the table. For committed/planned developments with development
programme to be implemented before commissioning of TMB,
only planned ASRs in the development area have been included in the assessment.
There is no confirmed programme on population intake for Proposed Public
Housing Developments at Ping Shan South, Yuen Long, Lam Tei North and Nai Wai,
Tuen Mun. As checked with CEDD, the
existing premises and land within the areas shall have been resumed for these
planned developments by the time when TMB is commissioned. Hence, only planned ASRs within these
development areas are included for operational air quality assessment. For other committed/planned developments
where there
is no available information on the programme on both population intake and land
resumption, both existing and planned ASRs in the development area have been
included in the assessment.
The locations of representative ASRs for
Proposed Public Housing Developments at Ping Shan South, Yuen Long, Lam Tei
North and Nai Wai are based on conceptual plan provided by CEDD. For planned
development where layout plan is not available, minimum setback distance from
the respective roads according to the Hong Kong Planning Standards and
Guidelines would be adopted.
[7] The Project during Construction Phase refers
to the boundary of the Project Site and associated works and temporary work
site / works area, and the Project during Operation Phase refers to road and
highway / tunnel and their associated operation and maintenance facilities
during operational phase. The selected ASRs and coverage of the assessment area
in Lam Tei area are the same as those in R11 EIA. The distance of ASRs to the Project TMB might
be over 500m.
[8] These ASRs are representative ASRs during construction phase
only since they are beyond 500m assessment area of operational phase.
Table 3.9 Representative ASRs for Air Quality Impact Assessment in Pillar Point Area
ASR ID[1] |
Location |
Land |
Base Elevation (mPD) |
Building Height [3] [4] (mAG) |
Lowest Assessment Height [3] (mAG) |
Highest Assessment Height [3] [5] (mAG) |
Intake Year [6] |
Approx. distance from Project during Construction
Phase [7] (m) |
Approx. distance from Project during Operational
Phase [7] (m) |
Operation/ Construction Phase ASR |
Existing ASRs |
||||||||||
A401 |
TMCLK Main Control Building FAI [8] |
Off |
19.6 |
N/A |
2.7 |
2.7 |
- |
30 |
40 |
Both |
A402 |
TMCLK Main Control Building Windows [8] |
Off |
19.6 |
N/A |
5 |
15 |
- |
30 |
40 |
Both |
A403 |
Butterfly Beach Laundry |
Ind |
5.8 |
20 |
1.5 |
20 |
- |
40 |
50 |
Both |
A404 |
Butterfly Beach Laundry |
Ind |
5.8 |
20 |
1.5 |
20 |
- |
80 |
90 |
Both |
A405 |
Metal Recycle or Vehicle Repairing Workshop |
Ind |
5.8 |
10 |
1.5 |
10 |
- |
60 |
70 |
Both |
A406 |
Metal Recycle or Vehicle Repairing Workshop |
Ind |
5.6 |
10 |
1.5 |
10 |
- |
90 |
90 |
Both |
A407 |
Metal Recycle or Vehicle Repairing Workshop |
Ind |
5.6 |
10 |
1.5 |
10 |
- |
90 |
90 |
Both |
A408 |
Metal Recycle or Vehicle Repairing Workshop |
Ind |
6 |
10 |
1.5 |
10 |
- |
60 |
70 |
Both |
A409 |
Metal Recycle or Vehicle Repairing Workshop |
Ind |
5.8 |
10 |
1.5 |
10 |
- |
90 |
90 |
Both |
A410 |
Sawmill at 25-33 Ho Yeung Street |
Ind |
6 |
10 |
1.5 |
10 |
- |
110 |
120 |
Both |
A411 |
Sawmill at 25-33 Ho Yeung Street |
Ind |
6 |
10 |
1.5 |
10 |
- |
180 |
190 |
Both |
A412 |
Sawmill at 25-33 Ho Yeung Street |
Ind |
6 |
10 |
1.5 |
10 |
- |
100 |
120 |
Both |
A413 |
Sawmill at 25-33 Ho Yeung Street |
Ind |
6 |
10 |
1.5 |
10 |
- |
140 |
190 |
Both |
A414 |
Sawmill at 25-33 Ho Yeung Street |
Ind |
6 |
15 |
1.5 |
15 |
- |
100 |
180 |
Both |
A415 |
Sawmill at 61-69 Ho Yeung Street |
Ind |
6 |
10 |
1.5 |
10 |
- |
70 |
190 |
Both |
A416 |
Sawmill at 61-69 Ho Yeung Street |
Ind |
5.8 |
10 |
1.5 |
10 |
- |
90 |
110 |
Both |
A417 |
Sawmill at 81-85 Ho Yeung Street |
Ind |
5.5 |
5 |
1.5 |
5 |
- |
40 |
110 |
Both |
A418 |
Sawmill at 81-85 Ho Yeung Street |
Ind |
6 |
10 |
1.5 |
10 |
- |
20 |
130 |
Both |
A419 |
Sawmill at 81-85 Ho Yeung Street |
Ind |
6 |
10 |
1.5 |
10 |
- |
30 |
190 |
Both |
A420 |
Sunhing Hungkai Tuen Mun |
Ind |
6 |
20 |
1.5 |
20 |
- |
60 |
70 |
Both |
A421 |
Pillar Point Fire Station [8] |
GIC |
5.9 |
15 |
6 |
15 |
- |
40 |
60 |
Both |
A422 |
Sunhing Hungkai Tuen Mun |
Ind |
5.5 |
20 |
1.5 |
20 |
- |
50 |
70 |
Both |
A423 |
Pillar Point Fire Station [8] |
GIC |
5.9 |
15 |
6 |
15 |
- |
30 |
90 |
Both |
A424 |
Sunhing Hungkai Tuen Mun |
Ind |
5.8 |
20 |
1.5 |
20 |
- |
80 |
100 |
Both |
A425 |
Chu Kong Warehouse Block 2 |
Ind |
6 |
20 |
1.5 |
20 |
- |
10 |
40 |
Both |
A426 |
Chu Kong Warehouse Block 1 |
Ind |
6 |
20 |
1.5 |
20 |
- |
<10 |
130 |
Both |
A427 |
TMCLK Kiosk N2 FAI [8] |
Off |
5.5 |
N/A |
2.5 |
2.5 |
- |
<10 |
300 |
Both |
A428 |
TMCLK Maintenance Depot Office Windows [8] |
Off |
6.1 |
N/A |
2.5 |
2.5 |
- |
50 |
300 |
Both |
A429 |
TMCLK Administration Building [8] |
Off |
6.3 |
10 |
1.5 |
10 |
- |
80 |
380 |
Both |
A430 |
Customs and Excise Department Harbour and River Trade Division
FAI [8] |
Off |
5.6 |
N/A |
19.7 |
19.7 |
- |
50 |
50 |
Both |
A431 |
EMSD Tuen Mun Vehicle Servicing Station |
Off/ Ind |
12 |
10 |
1.5 |
10 |
- |
Within Boundary |
20 |
Both |
A432 |
Administration Building of Pillar Point Sewage Treatment Works |
Off |
5.5 |
10 |
1.5 |
10 |
- |
30 |
50 |
Both |
A433 |
Goodman Westlink |
Off/ Ind |
9.5 |
20 |
1.5 |
20 |
- |
100 |
260 |
Both |
C401 |
Hong Kong Science Museum Exhibition Workshop |
Off/ Ind |
12.5 |
15 |
1.5 |
10 |
- |
90 |
N/A |
Construction [9] |
C402 |
Tuen Mun Fireboat Station |
GIC |
4.9 |
5 |
1.5 |
1.5 |
- |
110 |
N/A |
Construction [10] |
C403 |
Tuen Mun Customs Marine Base |
Off |
4.9 |
10 |
1.5 |
10 |
- |
160 |
N/A |
Construction [10] |
C404 |
Immigration Department Harbour Division River Trade |
Off |
5 |
5 |
1.5 |
1.5 |
- |
220 |
N/A |
Construction [10] |
C405 |
Chu Kong Shipping Company Limited |
Off/ Ind |
5.7 |
5 |
1.5 |
1.5 |
- |
60 |
N/A |
Construction [10] |
C406 |
Chu Kong Shipping Company Limited |
Off/ Ind |
5.5 |
10 |
1.5 |
10 |
- |
<10 |
N/A |
Construction [10] |
C407 |
Tuen Mun Customs Marine Base |
Off |
6.1 |
20 |
1.5 |
20 |
- |
20 |
N/A |
Construction [10] |
C408 |
Tuen Mun Fireboat Station |
GIC |
6.2 |
10 |
1.5 |
10 |
- |
20 |
N/A |
Construction [10] |
C410 |
WEEE · PARK |
Ind/ Off |
6.4 |
15 |
1.5 |
15 |
- |
310 |
N/A |
Construction [10] |
C411 |
WEEE · PARK |
Ind/ Off |
6.5 |
5 |
1.5 |
5 |
- |
300 |
N/A |
Construction [10] |
Notes:
[1] ASR ID C409 is not used.
[2] Com – Commercial; Edu – Education; GIC – Government, Institution
and Community; Hos – Hospital/Clinic; Off – Office; Rec – Park/ Recreational;
Res – Residential; and Wor – Worship.
[3] ASR location, height, the lowest and highest floor with air
sensitive use (i.e. lowest and highest assessment heights) are determined based
on site survey, building plan and latest layout plan, where available and
applicable. For all planned ASRs, the lowest assessment height is assumed to be
1.5m.
[4] Building heights are rounded up to the nearest 5m. Height of
village houses are assumed to be 10m, which is the common height of a typical
3-storey village house.
[5] The assessment heights are set at 10 levels (1.5, 5, 10, 15, 20,
30, 50, 80, 120 and 180 mAG) (see details in Table 3.21). The
highest assessment height of each ASR has covered the top level of the
building, e.g. for P021, the building height is 40m, the highest assessment
height is up to 50m.
[6] Population
intake years are only presented for committed/planned ASRs. There is no planned/committed ASRs in
Pillar Point Area.
[7] The Project during Construction Phase refers
to the boundary of the Project Site and associated works and temporary work
site / works area, and the Project during Operation Phase refers to road and
highway / tunnel and their associated operation and maintenance facilities
during operational phase.
[8] Window/ FAI heights are based on information and layout drawings
provided by the respective operators and government departments.
[9] These ASRs are not representative ASRs during
operational phase since there are other ASRs which are located closer to the
project alignment and their associated operation and maintenance facilities,
and are more representative. Nonetheless, they are also covered in the contour
plots.
[10] These ASRs are not representative ASRs during operational phase
since they are beyond 500m assessment area of operational phase.
Table 3.10 Representative ASRs for Air Quality Impact Assessment in Sam Shing Area
ASR
ID |
Location |
Land
|
Base
Elevation (mPD) |
Building
Height [2] [3] (mAG) |
Lowest
Assessment Height [2] (mAG) |
Highest
Assessment Height [2] [4] (mAG) |
Intake
Year [5] |
Approx.
distance from Project during Construction Phase [6] (m) |
Approx.
distance from Project during Operational Phase [6] (m) |
Operation/
Construction Phase ASR |
Existing ASRs |
||||||||||
A301 |
Handsome Court Block 4 |
Res |
6.1 |
60 |
1.5 |
80 |
- |
340 |
370 |
Both |
A302 |
Handsome Court Block 7 |
Res |
6.1 |
60 |
1.5 |
80 |
- |
240 |
270 |
Both |
A303 |
Alpine Garden Block 2 |
Res |
7.2 |
55 |
1.5 |
80 |
- |
180 |
210 |
Both |
A304 |
Alpine Garden Block 5 |
Res |
7.2 |
55 |
1.5 |
80 |
- |
80 |
110 |
Both |
A305 |
Hoi Tak Garden Block 3 |
Res |
8.8 |
45 |
1.5 |
50 |
- |
40 |
50 |
Both |
A306 |
Harvest Garden Block 3 |
Res |
5.9 |
60 |
1.5 |
80 |
- |
50 |
50 |
Both |
A307 |
Harvest Garden Block 2 |
Res |
5.9 |
60 |
1.5 |
80 |
- |
50 |
50 |
Both |
A308 |
Harvest Garden Block 1 |
Res |
5.9 |
60 |
1.5 |
80 |
- |
50 |
50 |
Both |
A309 |
Kam Fai Garden Block 1 |
Res |
7.8 |
55 |
1.5 |
80 |
- |
70 |
70 |
Both |
A310 |
Podium for Kam Fai Garden |
Rec |
8.5 |
10 |
1.5 |
10 |
- |
30 |
30 |
Both |
A311 |
Kam Fai Garden Block 4 |
Res |
8.5 |
55 |
1.5 |
80 |
- |
20 |
20 |
Both |
A312 |
Kam Fai Garden Block 3 |
Res |
8.5 |
55 |
1.5 |
80 |
- |
80 |
70 |
Both |
A313 |
Caritas Li Ka Shing Care and Attention Home |
Others |
25.5 |
15 |
1.5 |
15 |
- |
30 |
70 |
Both |
A314 |
Chi Lok Fa Yuen Stores |
Com |
5 |
5 |
1.5 |
1.5 |
- |
330 |
360 |
Both |
A315 |
Chi Lok Fa Yuen Block 8 |
Res |
5 |
50 |
1.5 |
50 |
- |
290 |
320 |
Both |
A316 |
Taoist Association Yuen Yuen Primary School |
Edu |
5 |
25 |
1.5 |
30 |
- |
280 |
300 |
Both |
A317 |
Rainbow Garden Block B |
Res |
4.1 |
60 |
1.5 |
80 |
- |
220 |
240 |
Both |
A318 |
JC Place Tower 3 |
Res |
4 |
50 |
1.5 |
50 |
- |
160 |
170 |
Both |
A319 |
JC Place Tower 1 |
Res |
4 |
50 |
1.5 |
50 |
- |
160 |
160 |
Both |
A320 |
Tsing Sin Playground |
Rec |
5.8 |
N/A |
1.5 |
1.5 |
- |
140 |
140 |
Both |
A321 |
Tai Tung Pui Care & Attention Home |
Others |
4.8 |
40 |
1.5 |
50 |
- |
210 |
200 |
Both |
A322 |
Hong King Garden Block B |
Res |
5.4 |
55 |
1.5 |
80 |
- |
240 |
250 |
Both |
A323 |
Tuen Mun Siu Lun Government Complex |
Off |
5.6 |
40 |
1.5 |
50 |
- |
130 |
210 |
Both |
A324 |
Chung Sing Benevolent Society Mrs. Aw Boon Haw
Secondary School |
Edu |
6.2 |
30 |
1.5 |
30 |
- |
110 |
290 |
Both |
A325 |
Semple Memorial Secondary School |
Edu |
6 |
25 |
1.5 |
30 |
- |
140 |
360 |
Both |
A326 |
Sam Shing Temple |
Wor |
30.5 |
10 |
1.5 |
10 |
- |
90 |
230 |
Both |
A327 |
Ki Lun Kong Public Park |
Rec |
4.5 |
N/A |
1.5 |
1.5 |
- |
90 |
360 |
Both |
A328 |
The Salvation Army Sam Shing Nursery School |
Edu |
4.5 |
5 |
1.5 |
1.5 |
- |
170 |
410 |
Both |
A329 |
Palm Cove Tower 5 |
Res |
18.1 |
45 |
1.5 |
50 |
- |
180 |
320 |
Both |
A330 |
Palm Cove Tower 3 |
Res |
6.5 |
55 |
1.5 |
80 |
- |
230 |
340 |
Both |
A331 |
Palm Cove Tower 1 |
Res |
6.5 |
55 |
1.5 |
80 |
- |
290 |
390 |
Both |
A332 |
Tsing Ha Lane Village House |
Res |
19 |
10 |
1.5 |
10 |
- |
320 |
340 |
Both |
A333 |
Dragon Villa |
Res |
9.6 |
35 |
1.5 |
50 |
- |
350 |
390 |
Both |
A334 |
Dragon Inn Court Block 4 |
Res |
14.3 |
55 |
1.5 |
80 |
- |
310 |
310 |
Both |
A335 |
Dragon Inn Seafood Restaurant |
Com |
22 |
20 |
1.5 |
20 |
- |
300 |
310 |
Both |
A336 |
Tsing Yung Terrace Tower 1 |
Res |
47.5 |
90 |
1.5 |
120 |
- |
350 |
360 |
Both |
A337 |
Tsing Yung Terrace Club House |
Rec |
55.5 |
5 |
1.5 |
1.5 |
- |
400 |
400 |
Both |
A338 |
Podium for Faraday House |
Rec |
39.7 |
10 |
1.5 |
10 |
- |
420 |
430 |
Both |
A339 |
Faraday House Block 1 |
Res |
39.7 |
45 |
1.5 |
50 |
- |
440 |
450 |
Both |
A340 |
Wah Fat Playground |
Rec |
18.4 |
N/A |
1.5 |
1.5 |
- |
N/A |
Within Boundary |
Operation [7] |
C301 |
Tuen Mun Siu Lun Government Complex |
Off |
5.6 |
40 |
1.5 |
50 |
- |
100 |
N/A |
Construction [8] |
C302 |
CSBS Mrs. Aw Boon Haw Secondary School Basketball
Court |
Rec |
6.2 |
N/A |
1.5 |
1.5 |
- |
80 |
N/A |
Construction [8] |
C303 |
Siu Lun Court Sui Lun House |
Res |
5.2 |
100 |
1.5 |
120 |
- |
130 |
N/A |
Construction [9] |
C304 |
Hanford Garden Podium |
Com |
4.6 |
15 |
1.5 |
15 |
- |
70 |
N/A |
Construction [8] |
C305 |
Sam Shing Hui Village Office |
GIC/ Off |
17.7 |
5 |
1.5 |
1.5 |
- |
30 |
N/A |
Construction [8] |
C306 |
Sam Shing Temple |
Wor |
30.5 |
10 |
1.5 |
10 |
- |
60 |
N/A |
Construction [8] |
C307 |
Hanford Garden Block 2 and Podium |
Res/Com |
4.6 |
95 |
1.5 |
120 |
- |
40 |
N/A |
Construction [8] |
C308 |
Sam Shing Estate Chun Yu House |
Res |
4.4 |
70 |
1.5 |
80 |
- |
50 |
N/A |
Construction [8] |
C309 |
The Salvation Army Sam Shing Transitional Housing |
Res |
4.5 |
25 |
1.5 |
30 |
- |
110 |
N/A |
Construction [8] |
C310 |
On Ting Estate Ting Tak House |
Res |
5.6 |
50 |
1.5 |
50 |
- |
200 |
N/A |
Construction [9] |
C311 |
Yau Oi Estate Oi Yee House |
Res |
5.2 |
65 |
1.5 |
80 |
- |
50 |
N/A |
Construction [9] |
C312 |
Yau Oi Estate Football Field |
Rec |
4.9 |
N/A |
1.5 |
1.5 |
- |
40 |
N/A |
Construction [9] |
C313 |
Yau Oi Estate Oi Shun House |
Res |
4.9 |
65 |
1.5 |
80 |
- |
60 |
N/A |
Construction [9] |
C314 |
Yau Oi Sports Centre |
Rec |
4.8 |
15 |
1.5 |
15 |
- |
80 |
N/A |
Construction [9] |
C315 |
Yan Chai Hospital Ho Sik Nam Primary School |
Edu |
4.8 |
25 |
1.5 |
30 |
- |
120 |
N/A |
Construction [9] |
C316 |
Yan Chai Hospital Ho Sik Nam Primary
School Basketball Court |
Rec |
4.8 |
N/A |
1.5 |
1.5 |
- |
100 |
N/A |
Construction [9] |
C317 |
Fung On Street Children’s Playground |
Rec |
5.3 |
N/A |
1.5 |
1.5 |
- |
10 |
N/A |
Construction [9] |
C318 |
Goodview Garden Tower 1 |
Res |
4.2 |
105 |
1.5 |
120 |
- |
30 |
N/A |
Construction [9] |
C319 |
Tsui Ning Garden Block 1 |
Res |
4.7 |
100 |
1.5 |
120 |
- |
30 |
N/A |
Construction [9] |
C320 |
Pok Oi Hospital Tuen Mun Nursing Home |
Res |
5.7 |
25 |
1.5 |
30 |
- |
170 |
N/A |
Construction [9] |
Planned/Committed
ASRs |
||||||||||
P301 |
Proposed Reprovision of Wah Fat Playground |
Rec |
4.7 |
N/A |
1.5 |
1.5 |
2025 |
Within Boundary |
N/A |
Construction [7] |
Notes:
[1] Com – Commercial; Edu – Education; GIC – Government, Institution
and Community; Hos – Hospital/Clinic; Off – Office; Rec – Park/ Recreational;
Res – Residential; and Wor – Worship.
[2] ASR location, height, the lowest and highest floor with air
sensitive use (i.e. lowest and highest assessment heights) are determined based
on site survey, building plan and latest layout plan, where available and
applicable. For all planned ASRs, the lowest assessment height is assumed to be
1.5m.
[3] Building heights are rounded up to the nearest 5m. Height of
village houses are assumed to be 10m, which is the common height of a typical
3-storey village house.
[4] The assessment heights are set at 10 levels (1.5, 5, 10, 15, 20,
30, 50, 80, 120 and 180 mAG) (see details in Table 3.21). The
highest assessment height of each ASR has covered the top level of the
building, e.g. for P021, the building height is 40m, the highest assessment
height is up to 50m.
[5] Population intake years are only presented for committed/planned
ASRs.
[6] The Project during Construction Phase refers
to the boundary of the Project Site and associated works and temporary work
site / works area, and the Project during Operation Phase refers to road and
highway / tunnel and their associated operation and maintenance facilities
during operational phase.
[7] The Wah Fat Playground (A340) would be used
as construction works area during construction phase of the Project and then
would be re-instated during operational phase of the Project. There would be no
recreational uses at Wah Fat Playground during construction phase and hence it
is not considered as ASR during construction stage. There would be temporary
Reprovision of Wah Fat Playground (P301) during construction phase of the
Project and it would no longer exist after commencement of the Project (i.e. 2033).
Hence, it is not considered as representative ASR during operational phase.
[8] These ASRs are not representative ASRs during
operational phase since there are other ASRs which are located closer to the
project alignment and their associated operation and maintenance facilities,
and are more representative. Nonetheless, they are also covered in the contour
plots.
[9] These ASRs are not representative ASRs during operational phase
since they are beyond 500m assessment area of operational phase.
Table 3.11 Representative ASRs for Air Quality Impact Assessment in Siu Lam Area
ASR ID |
Location |
Land |
Base Elevation (mPD) |
Building Height [2] [3] (mAG) |
Lowest Assessment Height [2] (mAG) |
Highest Assessment Height [2] [4] (mAG) |
Intake Year [5] |
Approx. distance from Project during Construction
Phase[6] (m) |
Approx. distance from Project during Operational
Phase[6] (m) |
Operation/ Construction Phase ASR |
Existing ASRs |
||||||||||
C501 |
Siu Lam Village House |
Res |
46.5 |
10 |
1.5 |
10 |
- |
450 |
N/A |
Construction [7] |
C502 |
Siu Lam Village House |
Res |
42.9 |
10 |
1.5 |
10 |
- |
420 |
N/A |
Construction [7] |
C503 |
Treatment Centre – Glorious Praise Fellowship (Hong Kong) |
GIC |
35.5 |
10 |
1.5 |
10 |
- |
390 |
N/A |
Construction [7] |
C504 |
Siu Lam Village House |
Res |
30.6 |
10 |
1.5 |
10 |
- |
360 |
N/A |
Construction [7] |
C505 |
Siu Lam Village House |
Res |
31.2 |
10 |
1.5 |
10 |
- |
400 |
N/A |
Construction [7] |
C506 |
Peak Castle House 22 |
Res |
35 |
20 |
1.5 |
20 |
- |
400 |
N/A |
Construction [7] |
C507 |
1001 Grandview Terrace |
Res |
98.8 |
10 |
1.5 |
10 |
- |
210 |
N/A |
Construction [7] |
C508 |
1002 Grandview Terrace |
Res |
84.1 |
10 |
1.5 |
10 |
- |
300 |
N/A |
Construction [7] |
C509 |
1005 Grandview Terrace |
Res |
99.1 |
10 |
1.5 |
10 |
- |
290 |
N/A |
Construction [7] |
C510 |
A.D.& F.D. Of Pok Oi Hospital Mrs Cheng Yam On Millennium
School |
Edu |
30.1 |
30 |
1.5 |
30 |
- |
490 |
N/A |
Construction [7] |
C511 |
Lepont Tower 3B |
Res |
29.1 |
65 |
1.5 |
80 |
- |
390 |
N/A |
Construction [7] |
C512 |
Siu Lam Village House |
Res |
9.5 |
10 |
1.5 |
10 |
- |
340 |
N/A |
Construction [7] |
C513 |
So Kwun Wat San Tsuen Area 3 House 23 |
Res |
7.8 |
10 |
1.5 |
10 |
- |
390 |
N/A |
Construction [7] |
C514 |
So Kwun Wat San Tsuen Village House |
Res |
8.7 |
10 |
1.5 |
10 |
- |
340 |
N/A |
Construction [7] |
C515 |
So Kwun Wat San Tsuen House 45 |
Res |
11.6 |
10 |
1.5 |
10 |
- |
350 |
N/A |
Construction [7] |
Notes:
[1] Com – Commercial; Edu – Education; GIC – Government, Institution
and Community; Hos – Hospital/Clinic; Off – Office; Rec – Park/ Recreational;
Res – Residential; and Wor – Worship.
[2] ASR location, height, the lowest and highest floor with air
sensitive use (i.e. lowest and highest assessment heights) are determined based
on site survey, building plan and latest layout plan, where available and
applicable. For all planned ASRs, the lowest assessment height is assumed to be
1.5m.
[3] Building heights are rounded up to the nearest 5m. Height of
village houses are assumed to be 10m, which is the common height of a typical
3-storey village house.
[4] The assessment heights are set at 10 levels (1.5, 5, 10, 15, 20,
30, 50, 80, 120 and 180 mAG) (see details in Table 3.21). The
highest assessment height of each ASR has covered the top level of the
building, e.g. for P021, the building height is 40m, the highest assessment
height is up to 50m.
[5] Population intake years are only presented for committed/planned
ASRs. There is no
planned/committed ASRs in Siu Lam Area.
[6] The Project during Construction Phase refers
to the boundary of the Project Site and associated works and temporary work
site / works area, and the Project during Operation Phase refers to road and
highway / tunnel and their associated operation and maintenance facilities
during operational phase.
[7]
These ASRs are not representative ASRs during operational phase since they
are beyond 500m assessment area of operational phase.
· Site clearance and formation;
· Construction of at-grade/elevated carriageways and slip roads;
· Construction of satellite control buildings at Lam Tei;
· Construction of administration buildings at Pillar Point;
· Construction of ventilation buildings (VBs) at Lam Tei, Pillar Point and Sam Shing;
· Construction of tunnel sections from Lam Tei to Pillar Point;
· Construction of tunnel portal structures at Lam Tei and Pillar Point;
· Re-provisioning of basketball court, toilet and carpark at Sam Shing;
· Construction and demolition of explosive magazine sites;
· Construction and demolition of barging facilities, slurry treatment plant, haul roads, stockpiling areas etc;
· Slope works, including blasting works;
· Geotechnical works; and
· Landscaping works.
· Any excavated or stockpile of dusty material including those on barges should be covered entirely by impervious sheeting or sprayed with water to maintain the entire surface wet and then removed or backfilled or reinstated where practicable for the excavation or unloading;
· Site hoardings of not less than 2.4m high should be provided as far as practicable along the site boundary with provision for public crossing. Subject to site constraints, the Contractor may review the practicability of taller site hoarding for ASRs in close vicinity to the site boundary. Good site practice shall also be adopted by the Contractor to ensure the conditions of the hoardings are properly maintained throughout the construction period;
· Any dusty materials remaining after a stockpile is removed should be wetted with water and cleared from the surface of roads;
· Any skip hoist for material transport should be totally enclosed by impervious sheeting;
· Every stock of more than 20 bags of cement or dry pulverised fuel ash (PFA) should be covered entirely by impervious sheeting or placed in an area sheltered on the top and the 3 sides;
· Cement or dry PFA delivered in bulk should be stored in a closed silo fitted with an audible high level alarm which is interlocked with the material filling line and no overfilling is allowed;
· Loading, unloading, transfer, handling or storage of bulk cement or dry PFA should be carried out in a totally enclosed system or facility, and any vent or exhaust should be fitted with an effective fabric filter or equivalent air pollution control system; and
· Exposed earth should be properly treated by compaction, turfing, hydroseeding, vegetation planting or sealing with latex, vinyl, bitumen, shotcrete or other suitable surface stabilisers within six months after the last construction activity on the construction site or part of the construction site where the exposed earth lies.
· Regulated machines shall be used and exempted NRMMs should be avoided where practicable;
· Optimise the number of on-site machinery to minimize gaseous and PM emissions for each construction site with consideration of actual site constraints or circumstances;
· Use cleaner fuel such as ultra-low sulphur diesel in diesel-operated construction plant to reduce sulphur dioxide emission;
· Zero emission or clean fuels shall be considered as far as practicable for transportation activities;
· Use of electric PMEs where practicable;
· Connect construction plant and equipment to main electricity supply and avoid use of diesel generators and diesel-powered equipment as far as practicable;
· Switch off the engine of PMEs when idling;
· Implement regular and proper maintenance for plant and equipment; and
· Employ plant and equipment of adequate size and power output and avoid overloading of the plant.
· Impermeable blast covers at the mucking out locations should be shut;
· The blasting should only be carried out in a fully enclosed environment;
· All neighbouring construction activities should be suspended during blasting;
· The areas within 30m from the blasting area should be wetted with water prior to blasting and blasting shall not be carried out when the strong wind signal or tropical cyclone warning signal No. 3 or higher is hoisted; and
· Where necessary, mist spraying measures should be installed at the mucking out locations.
· Provision of blast cages or roof-over protective cover, which are risk control measure, but also help to reduce a large amount of dust emission;
· Water spray before blasting and on blasted material prior to transportation;
· Minimise the distance fall and drop height from conveyors during loading and unloading; and
· Covered conveyors, transfer and unloading points with dust extraction system.
Table 3.12 Concurrent Projects included in the Operational Air Quality Assessment
Concurrent Projects |
Tentative Commissioning Year |
Route 11 |
2033 |
Widening of Yuen Long Highway (Section between Lam Tei Quarry
and Tong Yan San Tsuen Interchange) |
2033 |
Widening of Fuk Hang Tsuen Road |
First Quarter of 2025 |
Traffic Improvement Scheme in
Tuen Mun - Widening and Addition of slip roads at Lung Fu Road / Tuen Mun
Road / Wong Chu Road / Hoi Wing Road |
2031 |
Widening of Castle Peak Road –
Castle Peak Bay |
Second Quarter of 2024 |
Hung Shui Kiu/Ha Tsuen New
Development Area |
First stage: Year 2024-2025; Second stage: Year
2030-2032; and Third stage in Year 2036 |
Proposed Public Housing at Ping
Shan South, Yuen Long, Lam Tei North and Nai Wai Development |
Programme is under review and to be commissioned after
TMB is in place. |
Lung Kwu Tang Reclamation and
the Replanning of Tuen Mun West Area |
No confirmed programme, but induced traffic included |
Emission from Public Transport Interchanges
(PTIs), Heavy Goods Vehicle (HGV)/ Coach Parking and River Trade Terminal (RTT)
Planned PTIs |
·
Planned
PTI at Proposed Public Housing at Nai Wai, Lam Tei (PTI05) (to be
commissioned after TMB is in place, as
advised by CEDD.) ·
Planned
PTI at Proposed Public Housing at Lam Tei North, Lam Tei, Tuen Mun (PTI06)
(to be commissioned after TMB is in place, as advised by CEDD.) |
Existing PTI |
·
Castle
Peak Bay Bus Terminus (PTI04) at Sam Shing |
Major Existing HGV/ Coach Parking and vehicle depot |
·
Carpark
near Tung Lei Path (HCP02b), Lam Tei ·
Carpark
near Tat Fuk Road (HCP04), Lam Tei ·
Carpark
near To Lai Road (HCP09), Lam Tei ·
Carpark
near Fu Hang Tsuen Road (HCP11), Lam Tei ·
Carpark
near Butterfly Beach Park (HCP36), Pillar Point ·
Ho
Choi Lane Meter Parking (HCP25), Pillar Point ·
Ho
Hoi Street Meter Parking (HCP26), Pillar Point ·
FEHD
Tuen Mun Depot (DEP04), Pillar Point ·
Tuen
Mun Fill Bank Carpark (HCP34), Pillar Point |
RTT |
·
4
carparks inside RTT (HCP24, HCP31, HCP32, HCP35) ·
Other
areas inside RTT through Gate 1 (RTT_OTH_G1) ·
Other
areas inside RTT through Gate 2 (RTT_OTH_G2) |
Tier 1 |
Primary contribution from the project-induced emission sources including: ·
Vehicular
emission from the open roads of the proposed TMB ·
Vehicular
emission from the proposed tunnel portals and ventilation buildings of TMB |
|
|
Tier 2 |
Secondary contribution due to the pollutant-emitting activities in the immediate neighbourhood within the assessment area and major point source within 4km including: Major
Emission Sources within 500m of the Project ·
Vehicular
emission from the existing road networks and other planned concurrent
projects (including road projects and planned development projects as
described in Section 3.5.3 above) ·
Vehicular
emission from the identified existing and planned PTIs, and major HGV /coach
parking sites, as well as RTT by precise approach and all other parking sites
within the 500 m assessment area by broad-brush approach ·
Industrial
emission from the existing chimneys at Polystyrene Foam Products Factory
Limited, Hong Kong China Concrete Company Limited, Multi-Way Industries
Limited, Pillar Point Valley Landfill Flare and Butterfly Beach Laundry ·
Marine
emission at Tuen Mun Landing Area 40, Chu Kong Shipping Facilities and RTT Major
Point Sources within 4km of the Project ·
Emission
from Green Island Cement Company Limited and Castle Peak Power Station |
Tier 3 |
Background contribution including: ·
Other
sources, such as territory-wide road, Hong Kong International Airport, power
plants, marine emission from ocean going vessels, passenger ferries and
container terminals, other major point sources outside 4km, etc. |
Table 3.13 Summary Results of Sensitivity Tests
Year |
Annual Vehicular Emission (tonnes) |
||
NOx |
RSP |
FSP |
|
2033 |
113 |
5.5 |
5.1 |
2036 |
105 |
5.0 |
4.6 |
2041 |
116 |
5.4 |
5.0 |
2046 |
126 |
5.7 |
5.3 |
2048 |
134 |
5.9 |
5.5 |
Table 3.14 Summary of Wind Standard Deviation for Surface Roughness
Period /
Location/ Parameters |
Assumptions |
|
Grid
16_39, 17_38, 17_39, 18_39, 21_40, 21_41, 22_43 |
Surface roughness (cm) |
50 |
Wind standard deviation
(degrees) |
1) 28.6 for A & B Stability Classes; 2) 22.3 for C Stability Class; 3) 15.9 for D Stability Class; 4) 9.5 for E Stability Class; and 5) 4.8 for F Stability Class. |
|
Grid 20_40, 21_43, 21_44,
21_45, 22_44, 22_45 |
Surface roughness (cm) |
100 |
Wind standard deviation
(degrees) |
1) 32.9 for A & B Stability Classes; 2) 25.6 for C Stability Class; 3) 18.3 for D Stability Class; 4) 11 for E Stability Class; and 5) 5.6 for F Stability Class. |
Table 3.15 Example of Adjusted Height adopted in CALINE4 Models
ASR Level (mPD) |
Road Level (Road Group) |
|||
0-10 mPD (Group 1) |
11-20 mPD (Group 2) |
21-30 mPD (Group 3) |
31-40 mPD (Group 4) |
|
≤ 10 |
1.
No adjustment for
both road and ASR height |
1.
Adjusted Road
Height: 2.
No adjustment
for ASR |
1.
Adjusted Road
Height: Cap at 10m 2.
Adjusted Height
for ASR: 1.5m |
|
>10 and |
1.
Adjusted Road
Height: 2.
Adjusted height
for ASR: |
1.
Adjusted Road
Height: 2.
Adjusted height
for ASR: |
1.
Adjusted Road
Height: Cap at 10m 2.
Adjusted Height
for ASR: 1.5m |
|
>20 and |
1.
Adjusted Road
Height: 2.
Adjusted height
for ASR: |
1.
Adjusted Road
Height: 2.
Adjusted height
for ASR: |
||
>30 |
1.
Adjusted Road
Height: 2.
Adjusted height
for ASR: |
Note:
[1] Only example (i.e. for roads up to 40mPD) is given in the table above. Same approach of height adjustment is applied to road levels higher than 40mPD in the assessment.
Table 3.16 Model Parameters for CALINE4
Parameter |
Input |
Meteorological
Data |
Year 2015 MCIP
data extracted from PATH model |
Mixing Height |
Year 2015 MCIP data
extracted from PATH model and is capped to between 131m and 1941m as per the real meteorological
data recorded by Hong Kong Observatory in Year 2015 |
Stability Class |
Year 2015 MCIP
data extracted from PATH model |
NOx
to NO2 Ratio |
Ozone Limiting
Method (OLM) for 1-hour NO2 OLM/Jenkin’s
Method for annual NO2 (Details refer to Section 3.5.4.52) |
Assessment
heights |
1.5m, 5m, 10m,
15m, 20m, 30m, 50m, 80m, 120m and 180m above ground |
Table 3.17 Discharge of Proposed TMB Portals and Ventilation Buildings
Tunnel Section |
Tunnel Portal |
Ventilation Buildings (VBs) |
Discharge Split between Portals and VBs[1] |
Discharge Split for VBs[1] |
TMB |
·
TMB- North Portal ·
TMB- South Portal |
·
TMB- North Ventilation Building (TMB-NVB) ·
TMB- Middle Ventilation Building (TMB-MVB) ·
TMB- South Ventilation Building (TMB-SVB) |
40 : 60 |
1/3 from each
VB |
Note:
[1] The discharge split between portals and ventilation buildings is based on current design which was advised by the Project Engineer.
Table 3.18 Discharge of Proposed R11 Tunnel Portals and Ventilation Buildings
Tunnel Portal |
Ventilation Buildings
(VBs) |
Discharge Split between
Portals and VBs [2] |
Discharge Split for VBs
[2] |
|
Route 11 Lam Tei Tunnel (LTT) |
·
LTT- North Portal [1] ·
LTT- South Portal |
·
LTT- North Ventilation Building (LTT-NVB) [1] ·
LTT- South Ventilation Building (LTT-SVB) |
40 : 60 |
1/2 from each VB |
Notes:
[1] Only north portal and north ventilation
building of R11 are within 500m assessment area of TMB and hence included in
the assessment.
[2] The discharge split between portals and
ventilation buildings for R11 is based on current design which was advised by
the respective Project Engineer.
Table 3.19 Discharge of Existing Tuen Mun Chek Lap Kok Link Portals
Tunnel Section |
Tunnel Portal |
Ventilation Buildings (VBs) [1] |
Discharge Split between Portals and VBs [1] |
Tuen Mun Chek Lap Kok
Link Tunnel Road (TMCLKL) |
·
TMCLKL - Underpass Portal |
No Ventilation Building |
100% from
Portal |
·
TMCLKL - Tuen Mun Portal |
All Ventilation Buildings
are outside 500m assessment area |
10 : 90 |
Note:
[1] The discharge split between portals and ventilation buildings for TMCLKL is based on “Final Report on Management, Operation and Maintenance of Tunnels, Including the Tunnel Operation and Control System and Recurrent Consequence Requirement, Tuen Mun – Chek Lap Kok Link – Design and Construction” as provided by HyD.
Table 3.20 Latest Design Parameters of Ventilation Buildings
Tunnel
Section |
Ventilation Buildings |
Discharge Area (m2) |
Discharge
Direction |
Discharge
Louvre Bottom Level (mAG) |
Discharge
Velocity (m/s) |
Tuen Mun
Bypass (TMB) |
TMB - NVB |
120 |
Horizontal |
21 |
3 |
TMB - MVB |
117 |
Horizontal |
9.5 |
4 |
|
TMB - SVB |
120 |
Horizontal |
15.5 |
3 |
|
Route 11 Lam
Tei Tunnel (LTT) |
LTT - NVB |
360 |
Upward |
24 |
6 |
Table 3.21 Modelling Parameters in AERMOD
Parameters |
Input |
Modelling
Mode |
Urban with terrain option |
Meteorological
data |
Year 2015 MCIP data extracted from PATH v2.1 model
is provided by EPD. The wind speeds are capped at 1m/s for those from PATH
v2.1 below 1m/s |
Mixing
Height |
Year 2015 MCIP data extracted from
PATH model and is capped to between 131m and 1941m as per the real
meteorological data recorded by Hong Kong Observatory in Year 2015 |
Anemometer Height |
9m (According to EPD’s Guidelines on Choice of
Models and Model Parameters) |
Albedo |
Determined within 10km x 10km region from the
Project |
Bowen Ratio |
Determined within 10km x 10km region from the
Project |
Surface
Roughness |
Surface characteristic determined within 1km for
each PATH grid |
Assessment heights |
1.5m,
5m, 10m, 15m, 20m, 30m,
50m, 80m, 120m and 180m above ground |
· River trade vessels (RTVs) comprising local lighter/barge/cargo junk, local bunker vessel, and tug and tow.
· RTVs comprising container vessel, local lighter/barge/cargo junk, local bunker vessel, and tug and tow.
· RTVs comprising container vessel, local lighter/barge/cargo junk, local bunker vessel, and tug and tow at RTT; and
· Local vessels at RTT.
· Small crafts – boat to support other marine vessel activities, refuelling and vessel maintenance services, etc.
· Small crafts – tugboats and workboats.
where
[NOx] = NOx concentration
[NO2] = NO2 concentration
[Ox] = Sum of NO2 and O3 concentration
J = Photolysis rate of NO2
K = Rate
coefficient of the reaction between NO and O3
· 10th highest daily RSP concentration: add 11.0 μg/m3;
· Annual RSP concentration: add 10.3 μg/m3;
· 19th and 36th highest daily FSP concentration: Nil; and
· Annual FSP concentration: add 3.5 μg/m3.
Table 3.22 Cumulative NO2, RSP and FSP Concentrations in Lam Tei Area
ASR ID |
Location |
Range of Pollutant
Concentration (µg/m3) among assessment heights |
|||||
NO2 (Year 2048) |
RSP (Year 2048) |
FSP (Year 2048) |
|||||
1-hour (19th highest) |
Annual |
24-hour (10th highest) |
Annual |
24-hour (19th highest) |
Annual |
||
Criteria |
200 |
40 |
100 |
50 |
50 |
25 |
|
Existing ASRs |
|||||||
A001 |
Wo Ping San Tsuen House 198 |
106 |
23 |
71 |
27 |
38 |
16 |
A002 |
Wo Ping San Tsuen Village House |
105 to 106 |
23 to 24 |
71 |
27 |
38 |
16 |
A003 |
Wo Ping San Tsuen Village House |
101 to 102 |
22 to 23 |
71 |
27 |
38 |
16 |
A004 |
Wo Ping San Tsuen House 145 |
101 |
22 to 23 |
71 |
27 |
38 |
16 |
A008 |
Tsoi Yuen Tsuen House 283 |
97 to 100 |
22 to 23 |
69 |
27 |
37 |
15 |
A009 |
Tsoi Yuen Tsuen House 282 |
96 to 97 |
22 |
69 |
27 |
37 |
15 |
A010 |
Tsoi Yuen Tsuen House 74 |
97 to 98 |
22 to 23 |
69 |
27 |
37 |
15 |
A011 |
Fuk Hang Tsuen House 152 |
100 to 101 |
23 to 24 |
69 |
27 |
37 |
15 |
A012 |
Tsoi Yuen Tsuen Village House |
100 to 102 |
23 to 24 |
69 |
27 |
37 |
15 |
A013 |
Tsoi Yuen Tsuen House 159 |
99 to 101 |
22 to 23 |
69 |
27 |
37 |
15 |
A014 |
Tsoi Yuen Tsuen Village House |
99 |
22 to 23 |
69 |
27 |
37 |
15 |
A015 |
Tsoi Yuen Tsuen House 166 |
105 |
25 |
71 |
28 |
38 |
16 |
A016 |
Tsoi Yuen Tsuen House 189 |
104 to 105 |
24 to 25 |
71 |
28 |
38 |
16 |
A017 |
Tsoi Yuen Tsuen Village House |
103 to 104 |
25 |
71 |
28 |
38 |
16 |
A020 |
Nai Wai House 332 |
101 |
23 to 24 |
71 |
27 |
37 |
16 |
A021 |
Nai Wai Village House |
101 |
24 |
71 |
27 |
37 |
16 |
A022 |
Nai Wai House 248 |
100 to 101 |
24 |
71 |
27 |
37 |
16 |
A023 |
Nai Wai Village House |
102 to 106 |
24 to 26 |
71 |
27 to 28 |
37 |
16 |
A024 |
Yorks Field Garden |
94 to 97 |
20 to 22 |
71 |
27 |
38 |
15 |
A025 |
Tsoi Yuen Tsuen House 211A |
97 to 98 |
22 |
71 |
27 |
37 |
16 |
A026 |
Nai Wai Temple |
96 |
21 |
73 |
27 |
38 |
16 |
A027 |
Nai Wai House 158 |
97 |
22 |
71 |
27 |
37 |
16 |
A028 |
Belrose Place Block A |
100 to 109 |
22 to 24 |
73 |
27 to 28 |
38 |
16 |
A029 |
Tsing Yick Road Village House |
97 to 100 |
23 to 24 |
73 |
27 to 28 |
38 |
16 |
A030 |
Tsing Yick Road Village House |
99 to 100 |
23 to 24 |
73 |
28 |
38 |
16 |
A031 |
Lam Tei Pet Garden |
111 |
NA |
72 |
NA |
38 |
NA |
A032 |
Fuk Hang Playground Basketball Court |
107 |
NA |
72 |
NA |
38 |
NA |
A033 |
Fuk Hang Tsuen Road House 2 |
103 to 108 |
25 to 27 |
72 |
28 |
38 |
16 |
A034 |
Fuk Hang Tsuen Road House 11 |
105 to 113 |
26 to 32 |
72 |
28 |
38 |
16 |
A035 |
Fuk Hang Tsuen Road Garden |
121 |
NA |
72 |
NA |
38 |
NA |
A036 |
Fuk Hang Tsuen Road House 18 |
105 to 121 |
27 to 33 |
72 |
28 |
38 |
16 |
A037 |
Fortress Garden Block 8 |
100 to 101 |
23 to 24 |
71 |
27 |
38 |
16 |
A038 |
Tuen Tsz Wai Village House |
101 to 102 |
23 to 24 |
71 to 72 |
27 |
38 |
16 |
A039 |
Tuen Tsz Wai House 565 |
102 to 104 |
23 to 24 |
71 to 72 |
27 |
38 |
16 |
A040 |
Farmer Restaurant |
102 to 108 |
22 to 25 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A041 |
Miu Fat Buddhist Monastery Ksitigarbha Hall |
102 |
24 |
71 |
27 |
38 |
16 |
A042 |
Miu Fat Buddhist Monastery |
93 to 101 |
21 to 24 |
71 |
27 |
37 to 38 |
16 |
A043 |
Madam Lau Kam Lung Secondary School of Miu Fat
Buddhist Monastery |
98 to 102 |
22 to 24 |
71 |
27 |
38 |
16 |
A044 |
Miu Fat Buddhist Monastery Elderly Home |
99 to 101 |
22 to 23 |
71 |
27 |
38 |
16 |
A045 |
Temple at Lam Tei |
101 |
23 |
71 |
27 |
38 |
16 |
A046 |
Lam Tei House 20 |
101 |
23 |
71 |
27 |
38 |
16 |
A047 |
The Sherwood Block 1 |
94 to 107 |
21 to 27 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A048 |
The Sherwood Block 2 |
93 to 107 |
21 to 27 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A049 |
The Sherwood Block 3 |
94 to 111 |
21 to 26 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A050 |
The Sherwood Block 4 |
95 to 106 |
21 to 25 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A051 |
The Sherwood Block 5 |
95 to 103 |
21 to 25 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A052 |
The Sherwood Podium |
108 to 111 |
28 to 30 |
72 |
28 |
38 |
16 |
A053 |
The Sherwood Block 13 |
94 to 110 |
21 to 28 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A054 |
The Sherwood Block 12 |
95 to 109 |
21 to 27 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A055 |
The Sherwood Block 11 |
95 to 109 |
21 to 27 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A056 |
The Sherwood Block 10 |
95 to 107 |
21 to 26 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A057 |
The Sherwood Block 9 |
95 to 106 |
21 to 26 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A058 |
Lam Tei Main Street House 88 |
101 |
23 |
71 |
27 |
37 to 38 |
16 |
A059 |
Tuen Mun San Tsuen House 110 |
100 to 101 |
23 |
71 |
27 |
37 |
16 |
A060 |
Store at Lam Tei Main Street House 128 |
101 to 108 |
23 to 27 |
71 to 72 |
27 to 28 |
38 |
16 |
A061 |
Botania Villa Block 1 |
95 to 106 |
21 to 25 |
71 |
27 |
37 to 38 |
16 |
A062 |
Botania Villa Podium |
104 to 105 |
25 to 26 |
72 |
27 |
38 |
16 |
A063 |
Botania Villa Block 10 |
95 to 104 |
21 to 25 |
71 to 72 |
27 |
37 to 38 |
16 |
A064 |
GreenView Podium |
104 to 110 |
24 to 27 |
71 to 72 |
27 to 28 |
38 |
16 |
A065 |
GreenView |
94 to 108 |
21 to 26 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
A066 |
Botania Villa Block 9 |
94 to 105 |
21 to 25 |
71 |
27 |
37 to 38 |
16 |
A067 |
Fuk Hang Tsuen House 12 |
105 |
25 |
72 |
28 |
38 |
16 |
A068 |
The Church of Christian Faith Lam Tei Gospel Church |
103 |
24 |
72 |
27 |
38 |
16 |
A069 |
Property Agency at Fuk Hang Tsuen Road |
103 |
27 |
72 |
28 |
38 |
16 |
A070 |
Fuk Hang Tsuen House 25 |
107 to 108 |
25 |
72 |
28 |
38 |
16 |
A071 |
Fuk Hang Tsuen House 458 |
107 to 108 |
26 |
72 |
28 |
38 |
16 |
A072 |
Fuk Hang Tsuen Village House |
103 to 104 |
22 to 23 |
69 |
27 |
37 |
15 |
A073 |
Fuk Hang Tsuen Village House |
103 to 105 |
23 |
69 |
27 |
37 |
15 |
A074 |
Fuk Hang Tsuen Village House |
110 to 111 |
27 |
72 |
28 |
38 |
16 |
A075 |
Fuk Hang Tsuen Village House |
108 to 111 |
27 to 28 |
72 |
28 |
38 |
16 |
A076 |
Fuk Hang Tsuen Houses 59-61 |
108 |
26 to 27 |
72 |
28 |
38 |
16 |
A077 |
Church of Christian Faith Lam Tei Gospel Church |
107 |
25 to 26 |
72 |
28 |
38 |
16 |
A078 |
Fuk Hang Tsuen Village House |
105 |
25 to 26 |
72 |
28 |
38 |
16 |
A079 |
Tin Hau Temple at Fuk Hang Tsuen Road |
108 |
26 |
72 |
28 |
38 |
16 |
A080 |
Tuen Mun Heung Fuk Hang Tsuen Village Office |
105 to 109 |
25 to 26 |
72 |
28 |
38 |
16 |
A081 |
Lam Tei Fa Pao Association |
107 |
25 |
72 |
28 |
38 |
16 |
A082 |
Fuk Hang Tsuen House 130 |
105 to 106 |
25 to 26 |
72 |
28 |
38 |
16 |
A083 |
Fuk Hang Tsuen Village House |
105 |
25 |
72 |
28 |
38 |
16 |
A084 |
Fuk Hang Tsuen Village House |
104 |
24 |
72 |
27 to 28 |
38 |
16 |
A085 |
To Yuen Wai House 160 |
103 to 104 |
24 to 25 |
72 |
28 |
38 |
16 |
A087 |
Tan Kwai Tsuen Village House |
94 |
18 |
69 |
27 |
37 |
15 |
A088 |
Tung Fuk Road Village House |
97 to 98 |
18 to 19 |
69 |
27 |
37 |
15 |
A089 |
Tung Fuk Road Village House |
94 to 97 |
18 |
69 |
27 |
37 |
15 |
A090 |
Tung Fuk Road Village House |
99 |
19 |
69 |
27 |
37 |
15 |
A091 |
Tung Fuk Road Village House |
101 |
20 |
69 |
27 |
37 |
15 |
A092 |
Tung Fuk Road Village House |
102 to 104 |
20 |
69 |
27 |
37 |
15 |
A093 |
Tung Fuk Road Village House |
103 to 107 |
20 |
69 |
27 |
37 |
15 |
A094 |
Fuk Hang Tsuen House 178 |
99 to 100 |
19 |
69 |
27 |
37 |
15 |
A095 |
Fuk Hang Tsuen Village House |
101 to 102 |
19 to 20 |
69 |
27 |
37 |
15 |
A096 |
Fuk Hang Tsuen Village House |
96 to 98 |
18 |
69 |
27 |
37 |
15 |
A097 |
Tin Hau Temple at Fuk Hang Tsuen Path |
97 |
18 |
69 |
27 |
37 |
15 |
A098 |
Fuk Hang Tsuen Village House |
96 |
18 |
69 |
27 |
37 |
15 |
A099 |
Fuk Hang Tsuen Village House |
101 to 103 |
20 |
69 |
27 |
37 |
15 |
A100 |
Chui Fuk Road Village House |
104 to 105 |
21 to 22 |
69 |
27 |
37 |
15 |
A101 |
Chui Fuk Road Village House |
104 |
21 to 22 |
69 |
27 |
37 |
15 |
A102 |
Chui Fuk Road Village House |
104 to 105 |
22 |
69 |
27 |
37 |
15 |
A103 |
Fu Fuk Road Village House |
102 to 103 |
21 |
69 |
27 |
37 |
15 |
A104 |
Fu Tei Ha Tsuen Village House |
110 to 111 |
24 |
71 to 72 |
28 |
38 |
16 |
A105 |
Fu Tei Ha Tsuen Village House |
109 to 111 |
24 to 25 |
71 to 72 |
28 |
38 |
16 |
A106 |
Fu Tei Ha Tsuen Village House |
110 |
24 |
71 |
27 |
37 |
16 |
A107 |
Fu Tei Ha Tsuen Village House |
105 |
23 |
71 |
27 |
37 |
16 |
A108 |
Fu Tei Ha Tsuen Village House |
104 to 105 |
23 to 24 |
71 |
27 |
37 |
16 |
A110 |
Fu Tei Ha Tsuen Village House |
103 |
21 |
69 |
27 |
37 |
15 |
A111 |
Sin Fat Hang Yuen Temple |
103 |
20 |
69 |
27 |
37 |
15 |
A112 |
Nam On Buddhist Monastery |
103 |
20 |
69 |
27 |
37 |
15 |
A113 |
Fu Tei Ha Tsuen Village House |
100 |
20 |
69 |
27 |
36 |
15 |
A114 |
Fu Tei Ha Tsuen Village House |
101 |
20 |
69 |
27 |
36 |
15 |
A115 |
Fu Tei Ha Tsuen Village House |
100 |
20 |
69 |
27 |
36 |
15 |
A116 |
Fu Tai Estate - Ning Tai House |
91 to 100 |
18 to 20 |
69 |
27 |
36 |
15 |
A117 |
Fu Tai Estate - Yat Tai House |
91 to 100 |
18 to 20 |
69 |
27 |
36 |
15 |
Planned ASRs |
|||||||
P001 |
Proposed Public Housing at Ping Shan
South and Podium with Kindergarten, Welfare and Retail Facilities |
89 to 95 |
17 to 20 |
71 |
27 |
37 to 38 |
15 |
P002a |
Proposed Public Housing at Lam Tei North
and Podium with Welfare and Retail Facilities |
90 to 100 |
17 to 22 |
69 |
27 |
37 |
15 |
P002b |
Proposed Public Housing at Lam Tei North
and Podium with Welfare and Retail Facilities |
90 to 97 |
17 to 22 |
69 |
27 |
37 |
15 |
P002c |
Podium with Welfare and Retail
Facilities for Proposed Public Housing at Lam Tei North |
97 to 100 |
21 to 22 |
69 |
27 |
37 |
15 |
P003a |
Proposed Public Housing at Lam Tei North
and Podium with Welfare and Retail Facilities |
90 to 95 |
17 to 20 |
69 |
27 |
37 |
15 |
P003b |
Proposed Public Housing at Lam Tei North
and Podium with Welfare and Retail Facilities |
90 to 95 |
17 to 20 |
69 |
27 |
37 |
15 |
P003c |
Proposed Public Housing at Lam Tei North
and Podium with Welfare and Retail Facilities |
90 to 94 |
17 to 20 |
69 |
27 |
37 |
15 |
P004a |
Proposed Public Housing at Lam Tei North
and Podium with Welfare and Retail Facilities |
90 to 95 |
17 to 21 |
69 |
27 |
37 |
15 |
P004b |
Proposed Public Housing at Lam Tei North
and Podium with Welfare and Retail Facilities |
90 to 95 |
17 to 21 |
69 |
27 |
37 |
15 |
P005a |
Proposed Public Housing at Lam Tei North
|
90 to 101 |
17 to 23 |
69 |
27 |
37 |
15 |
P005b |
Proposed Public Housing at Lam Tei North |
90 to 100 |
17 to 23 |
69 |
27 |
37 |
15 |
P006 |
Proposed Temporary Place of Recreation,
Sports or Culture (Indoor Recreation Centre) |
97 |
22 |
69 |
27 |
37 |
15 |
P007a |
Proposed Public Housing at Nai Wai and
Podium with Welfare Facilities |
91 to 105 |
19 to 24 |
71 |
27 |
37 to 38 |
15 to 16 |
P007b |
Proposed Public Housing at Nai Wai and
Podium with Welfare Facilities |
91 to 124 |
19 to 30 |
71 |
27 to 28 |
37 to 38 |
15 to 16 |
P008a |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 105 |
19 to 26 |
71 |
27 to 28 |
37 to 38 |
15 to 16 |
P008b |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 115 |
19 to 29 |
71 |
27 to 28 |
37 to 38 |
15 to 16 |
P008c |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 104 |
19 to 25 |
71 |
27 |
37 to 38 |
15 to 16 |
P008d |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 105 |
19 to 26 |
71 |
27 to 28 |
37 to 38 |
15 to 16 |
P009a |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 106 |
19 to 26 |
71 |
27 to 28 |
37 to 38 |
15 to 16 |
P009b |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 102 |
19 to 24 |
71 |
27 |
37 to 38 |
15 to 16 |
P010 |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 101 |
19 to 24 |
71 |
27 |
37 to 38 |
15 to 16 |
P011 |
Proposed Public Housing at Nai Wai and Podium
with Welfare and Retail Facilities |
91 to 103 |
19 to 25 |
71 |
27 to 28 |
37 to 38 |
15 to 16 |
P012a |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 107 |
19 to 26 |
71 |
27 to 28 |
37 to 38 |
15 to 16 |
P012b |
Proposed Public Housing at Nai Wai and
Podium with Welfare and Retail Facilities |
91 to 105 |
19 to 26 |
71 |
27 to 28 |
37 |
15 to 16 |
P013a |
Planned Public Housing in Hung Shui
Kiu/Ha Tsuen New Development Area and Podium with Retail Use |
93 to 100 |
18 to 25 |
73 |
27 to 28 |
38 |
16 |
P014 |
Proposed Development of Elderly Home by
Pok Oi Hospital |
92 to 106 |
20 to 28 |
71 to 72 |
27 to 28 |
37 to 38 |
15 to 16 |
P015 |
Proposed Development of Elderly Home by
Pok Oi Hospital |
92 to 105 |
20 to 26 |
71 to 72 |
27 to 28 |
37 to 38 |
15 to 16 |
P016 |
Proposed Development of Elderly Home by
Pok Oi Hospital |
92 to 104 |
20 to 25 |
71 to 72 |
27 to 28 |
37 to 38 |
15 to 16 |
P017 |
Proposed Comprehensive Development Area
in Lot 2883 in D.D. 130 |
102 to 105 |
23 to 24 |
71 |
27 |
38 |
16 |
P018 |
Proposed Comprehensive Development in
D.D. 130 and Adjoining Government Land |
95 to 109 |
21 to 27 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
P019 |
Proposed Comprehensive Development in
D.D. 130 and Adjoining Government Land |
97 to 111 |
21 to 27 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
P020 |
Proposed Comprehensive Development in
D.D. 130 and Adjoining Government Land |
98 to 107 |
21 to 26 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
P021 |
Proposed Comprehensive Development in
D.D. 130 and Adjoining Government Land |
97 to 114 |
21 to 29 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
P022 |
Proposed Comprehensive Development in
D.D. 130 and Adjoining Government Land |
97 to 113 |
21 to 30 |
71 to 72 |
27 to 28 |
37 to 38 |
16 |
P025 |
Temporary Place of Recreation, Sports or
Culture (Sports Training Ground) |
104 to 111 |
20 to 21 |
69 |
27 |
37 |
15 |
Note:
[1] NA indicates the AQO is not applicable for those ASRs (e.g. park, garden, outdoor play/recreational area, sitting areas, etc.) since people inside these premises would not stay for long duration and subject to long-term impacts.
Table 3.23 Cumulative NO2, RSP and FSP Concentrations in Pillar Point Area
ASR ID |
Location |
Range of Pollutant
Concentration (µg/m3) among assessment heights[1] |
|||||
NO2 (Year 2048) |
RSP (Year 2048) |
FSP (Year 2048) |
|||||
1-hour (19th highest) |
Annual |
24-hour (10th highest) |
Annual |
24-hour (19th highest) |
Annual |
||
Criteria |
200 |
40 |
100 |
50 |
50 |
25 |
|
Existing ASRs |
|||||||
A401 |
TMCLK
Main Control Building FAI |
119 |
35 |
70 |
28 |
40 |
16 |
A402 |
TMCLK
Main Control Building Windows |
111 to 117 |
33 to 35 |
70 |
28 |
40 |
16 |
A403 |
Butterfly
Beach Laundry |
116 to 147 |
32 to 38 |
70 |
28 to 29 |
40 |
16 |
A404 |
Butterfly
Beach Laundry |
118 to 133 |
32 to 35 |
70 to 71 |
29 |
40 |
16 |
A405 |
Metal
Recycle or Vehicle Repairing Workshop |
128 to 137 |
34 to 36 |
71 to 72 |
29 |
40 |
16 |
A406 |
Metal
Recycle or Vehicle Repairing Workshop |
126 to 131 |
34 to 35 |
71 to 73 |
29 to 30 |
40 |
16 |
A407 |
Metal
Recycle or Vehicle Repairing Workshop |
128 to 135 |
34 to 35 |
71 to 73 |
29 to 32 |
40 |
16 to 17 |
A408 |
Metal
Recycle or Vehicle Repairing Workshop |
130 to 143 |
35 to 36 |
70 to 72 |
29 to 31 |
40 |
16 |
A409 |
Metal
Recycle or Vehicle Repairing Workshop |
139 to 145 |
36 to 37 |
71 to 73 |
30 to 32 |
39 to 40 |
17 |
A410 |
Sawmill
at 25-33 Ho Yeung Street |
139 to 142 |
36 to 37 |
71 to 72 |
30 to 31 |
39 |
17 |
A411 |
Sawmill
at 25-33 Ho Yeung Street |
139 to 140 |
36 to 38 |
72 to 73 |
30 |
39 |
17 |
A412 |
Sawmill
at 25-33 Ho Yeung Street |
141 to 146 |
37 |
71 |
30 |
39 |
16 |
A413 |
Sawmill
at 25-33 Ho Yeung Street |
140 |
37 to 40 [2] |
72 |
30 |
39 |
16 to 17 |
A414 |
Sawmill
at 25-33 Ho Yeung Street |
138 to 141 |
36 to 39 |
72 |
30 |
39 |
16 to 17 |
A415 |
Sawmill
at 61-69 Ho Yeung Street |
139 to 141 |
37 to 39 |
72 |
29 to 30 |
39 |
16 to 17 |
A416 |
Sawmill
at 61-69 Ho Yeung Street |
143 to 147 |
37 |
71 |
29 |
39 |
16 |
A417 |
Sawmill
at 81-85 Ho Yeung Street |
145 to 147 |
37 |
71 |
29 |
39 |
16 |
A418 |
Sawmill
at 81-85 Ho Yeung Street |
141 to 144 |
37 |
71 |
29 |
39 |
16 |
A419 |
Sawmill
at 81-85 Ho Yeung Street |
136 to 139 |
37 to 39 |
71 |
29 to 30 |
39 |
16 to 17 |
A420 |
Sunhing
Hungkai Tuen Mun |
131 to 157 |
36 to 39 |
70 to 71 |
29 to 30 |
38 to 39 |
16 to 17 |
A421 |
Pillar
Point Fire Station |
143 to 155 |
37 to 39 |
71 |
29 |
39 |
16 |
A422 |
Sunhing
Hungkai Tuen Mun |
136 to 165 |
37 to 39 |
70 to 71 |
29 to 30 |
38 to 39 |
16 |
A423 |
Pillar
Point Fire Station |
141 to 146 |
37 to 38 |
71 |
29 |
39 |
16 |
A424 |
Sunhing
Hungkai Tuen Mun |
135 to 150 |
36 to 39 |
70 to 71 |
29 to 30 |
38 to 39 |
16 |
A425 |
Chu
Kong Warehouse Block 2 |
135 to 162 |
36 to 40 [2] |
70 to 71 |
29 |
38 to 39 |
16 |
A426 |
Chu
Kong Warehouse Block 1 |
127 to 140 |
36 to 38 |
70 to 71 |
29 |
38 to 39 |
16 |
A427 |
TMCLK
Kiosk N2 FAI |
131 |
35 |
71 |
29 |
39 |
16 |
A428 |
TMCLK
Maintenance Depot Office Windows |
125 |
35 |
71 |
29 |
39 |
16 |
A429 |
TMCLK
Administration Building |
122 to 125 |
36 to 40 [2] |
71 |
29 |
39 |
16 |
A430 |
Customs
and Excise Department Harbour and River Trade Division FAI |
128 |
37 |
70 |
29 |
39 |
16 |
A431 |
EMSD
Tuen Mun Vehicle Servicing Station |
131 to 138 |
37 to 39 |
71 |
29 |
39 |
16 |
A432 |
Administration
Building of Pillar Point Sewage Treatment Works |
139 to 141 |
36 to 37 |
71 |
29 |
39 |
16 |
A433 |
Goodman
Westlink |
120 to 135 |
34 to 38 |
69 to 70 |
28 |
39 |
16 |
Notes:
[1] For ASRs in Pillar Point Area with assessment height larger than 17mAG, PATH Level 2 is adopted for cumulative impacts.
[2] The annual NO2 concentrations for A413 (10mAG), A425 (1.5mAG) and A429 (5mAG) are 39.9µg/m3, 39.6 µg/m3 and 39.6 µg/m3 respectively which comply with the AQO criterion.
Table 3.24 Cumulative NO2, RSP and FSP Concentrations in Sam Shing Area
ASR ID |
Location |
Range of Pollutant
Concentration (µg/m3) among assessment heights |
|||||
NO2 (Year 2048) |
RSP (Year 2048) |
FSP (Year 2048) |
|||||
1-hour (19th highest) |
Annual |
24-hour (10th highest) |
Annual |
24-hour (19th highest) |
Annual |
||
Criteria |
200 |
40 |
100 |
50 |
50 |
25 |
|
Existing ASRs |
|||||||
A301 |
Handsome
Court Block 4 |
88 |
18 |
68 |
27 |
37 |
15 |
A302 |
Handsome
Court Block 7 |
88 to 91 |
18 to 20 |
68 |
27 |
37 |
15 |
A303 |
Alpine
Garden Block 2 |
89 to 94 |
21 to 23 |
69 |
27 |
38 |
15 |
A304 |
Alpine
Garden Block 5 |
89 to 94 |
21 to 23 |
69 |
27 |
38 to 39 |
15 |
A305 |
Hoi
Tak Garden Block 3 |
90 to 95 |
22 to 24 |
69 |
27 |
39 |
15 |
A306 |
Harvest
Garden Block 3 |
90 to 95 |
21 to 24 |
69 |
27 |
38 to 39 |
15 |
A307 |
Harvest
Garden Block 2 |
90 to 98 |
21 to 24 |
69 |
27 |
38 to 39 |
15 |
A308 |
Harvest
Garden Block 1 |
90 to 100 |
21 to 24 |
69 |
27 |
38 to 39 |
15 |
A309 |
Kam
Fai Garden Block 1 |
89 to 99 |
21 to 24 |
69 |
27 |
38 to 39 |
15 |
A310 |
Podium
for Kam Fai Garden |
98 to 99 |
23 |
69 |
27 |
39 |
15 |
A311 |
Kam
Fai Garden Block 4 |
90 to 99 |
21 to 24 |
69 |
27 |
38 to 39 |
15 |
A312 |
Kam
Fai Garden Block 3 |
89 to 97 |
21 to 24 |
69 |
27 |
38 to 39 |
15 |
A313 |
Caritas
Li Ka Shing Care And Attention Home |
95 to 97 |
23 to 24 |
69 |
27 |
39 |
15 |
A314 |
Chi
Lok Fa Yuen Stores |
95 |
21 |
68 |
27 |
37 |
15 |
A315 |
Chi
Lok Fa Yuen Block 8 |
88 to 96 |
18 to 22 |
68 |
27 |
37 |
15 |
A316 |
Taoist
Association Yuen Yuen Primary School |
89 to 95 |
18 to 21 |
68 |
27 |
37 |
15 |
A317 |
Rainbow
Garden Block B |
90 to 100 |
21 to 25 |
69 |
27 |
38 to 39 |
15 |
A318 |
JC
Place Tower 3 |
90 to 101 |
22 to 25 |
69 |
27 |
39 |
15 |
A319 |
JC
Place Tower 1 |
91 to 100 |
22 to 25 |
69 |
27 |
39 |
15 |
A320 |
Tsing
Sin Playground |
103 |
NA |
69 |
NA |
39 |
NA |
A321 |
Tai
Tung Pui Care & Attention Home |
90 to 100 |
22 to 25 |
69 |
27 |
39 |
15 |
A322 |
Hong
King Garden Block B |
99 to 106 |
24 to 28 |
69 to 70 |
27 |
39 |
15 |
A323 |
Tuen
Mun Siu Lun Government Complex |
101 to 115 |
25 to 31 |
69 to 70 |
27 to 28 |
39 |
15 to 16 |
A324 |
CSBS
Mrs. Aw Boon Haw Secondary School |
102 to 112 |
26 to 31 |
70 |
27 to 28 |
39 |
15 to 16 |
A325 |
Semple
Memorial Secondary School |
102 to 107 |
26 to 29 |
70 |
27 |
39 |
15 |
A326 |
Sam
Shing Temple |
102 to 103 |
26 |
70 |
27 |
39 |
15 |
A327 |
Ki Lun
Kong Public Park |
107 |
NA |
70 |
NA |
39 |
NA |
A328 |
The
Salvation Army Sam Shing Nursery School |
115 |
30 |
70 |
28 |
39 |
15 |
A329 |
Palm
Cove Tower 5 |
99 to 103 |
24 to 26 |
69 to 70 |
27 |
39 |
15 |
A330 |
Palm
Cove Tower 3 |
99 to 104 |
24 to 26 |
69 to 70 |
27 |
39 |
15 |
A331 |
Palm
Cove Tower 1 |
89 to 97 |
21 to 23 |
69 |
27 |
38 |
15 |
A332 |
Tsing
Ha Lane Village House |
97 to 98 |
22 |
69 |
27 |
38 |
15 |
A333 |
Dragon
Villa |
91 to 96 |
21 to 22 |
69 |
27 |
38 |
15 |
A334 |
Dragon
Inn Court Block 4 |
89 to 99 |
21 to 22 |
69 |
27 |
38 to 39 |
15 |
A335 |
Dragon
Inn Seafood Restaurant |
98 to 100 |
22 to 23 |
69 |
27 |
39 |
15 |
A336 |
Tsing
Yung Terrace Tower 1 |
89 to 94 |
21 to 22 |
69 |
27 |
38 |
15 |
A337 |
Tsing
Yung Terrace Club House |
95 |
22 |
69 |
27 |
38 |
15 |
A338 |
Podium
for Faraday House |
95 |
22 |
69 |
27 |
38 |
15 |
A339 |
Faraday
House Block 1 |
89 to 95 |
21 to 22 |
69 |
27 |
38 |
15 |
A340 |
Wah
Fat Playground |
95 |
NA |
69 |
NA |
39 |
NA |
Table 3.25 Contribution Breakdown of ASRs with Highest Annual NO2 Concentration in Respective Areas
Annual NO2 concentration
(ug/m3) |
Lam Tei |
Pillar Point |
Pillar Point |
Pillar Point |
Sam Shing |
A036 |
A413 |
A425 |
A429 |
A323 |
|
Fuk Hang Tsuen Road House 18 |
Sawmill at
25-33 Ho Yeung Street |
Chu Kong
Warehouse Block 2 |
TMCLK Admin
Building |
Tuen Mun Siu Lun Government Complex |
|
Chimney |
3 |
<1 |
<1 |
1 |
-[1] |
Marine |
-[1] |
4 |
3 |
1 |
-[1] |
Open road [2] |
10 |
<1 |
2 |
2 |
6 |
Portal |
<1 |
<1 |
<1 |
1 |
<1 |
VB |
<1 |
<1 |
<1 |
<1 |
<1 |
PTI |
<1 |
<1 |
<1 |
<1 |
<1 |
PATH Background |
19 |
34 |
34 |
34 |
24 |
Cumulative impact |
33 |
40 [3] |
40 [3] |
40 [3] |
31 |
Notes:
[1] No marine emission at Lam Tei and Sam Shing Area. No chimney emission at Sam Shing Area.
[2] The contribution breakdown is presented for the ASRs with highest cumulative concentration from all sources including the background. The presented contribution from open roads (including Project roads) to the selected ASRs may not be the highest amongst all ASRs in the respective area.
[3] The annual NO2 concentrations for A413 (10mAG), A425 (1.5mAG) and A429 (5mAG) are 39.9µg/m3, 39.6 µg/m3 and 39.6 µg/m3 respectively which comply with the AQO criterion.
[1] Civil Engineering and
Development Department, 2019. Management of Quarries
(https://www.ceddreport201519.gov.hk/en/projects-services-detail/quarrying)
[2] Jenkin M E, 2004a. Analysis of sources and partitioning of oxidant
in the UK – Part 1: The NOx-dependence of annual mean concentrations of
nitrogen dioxide and ozone. Atmospheric Environment, 38, 5117-5129.
[3] Environment Agency UK 2007. Review of methods for NO to NO2
conversion in plumes at short ranges
(https://www.gov.uk/government/publications/review-of-methods-for-no-to-no2-conversion-in-plumes-at-short-ranges)
[4] The removal efficiency of 40% is deduced from modelling results of
the worst concentrations of these areas at various heights in both long term
and short term NO2.
[5] The removal efficiency of 30% is deduced from modelling results of
the worst concentrations of these areas at various heights in both long term
and short term NO2.